TAC:49798
From kanterella
(Redirected from TAC:53462)
Jump to navigation
Jump to search
Request for: Approved, Closed | |
Questions Answers Results Other: 05000336/LER-1983-007-01, /01T-0:on 830318,nonconservative Safety Analysis Assumption Discovered in Steam Generator Tube Rupture Analysis.Caused by Failure of Analysis to Consider Impact of Automatic Valves.Analyses Will Be Docketed Shortly, A03323, Forwards Addl Info Re Methodology Utilized in Performing Safety Analysis Supporting Cycle 6 Operation,In Response to Question 400.5 in, A03413, Submits Addl Info Re Steam Generator Tube Rupture Event Analyzed in Support of Cycle 6 Operation,Per 830725 Request. Current Steam Generator Tube Rupture Analysis Adequate to Support Cycle 6 Operation, B10788, Discusses Re Proposed Revs to Tech Specs for Cycle 6 Reload.Current Tech Spec Limits Provide Acceptable Margin of Safety, B10944, Forwards Suppl to Reload Safety Analyses for Cycle 6 Operation. Cycle 6 Reload Design Does Not Result in Previously Acceptable Safety Limits for Any Incident to Be Exceeded.Startup Scheduled for 831230, B11096, Forwards Startup Test Rept Cycle 6. Results within Acceptance Criteria W/Exception of Low Power Measurement of Control Element Assembly (CEA) Reactivity Worths.One CEA Bank Slightly in Excess of Criteria, ML20039C038, ML20072Q703, ML20073M245, ML20073M276, ML20073M288, ML20080K548, ML20080K696, ML20082L244, ML20087P713 | |
| From | |
MONTHYEARML20039C0381981-12-17017 December 1981
[table view]Revised Tech Specs Re Cycle 5 Reload Analyses B10353, Application to Amend License DPR-65 Incorporating Revisions to Tech Specs to Support Cycle 5.Completion of Revisions & Reanalysis Required for Item II.K.3.30 of NUREG-0737 Scheduled for 8207011981-12-17017 December 1981 Application to Amend License DPR-65 Incorporating Revisions to Tech Specs to Support Cycle 5.Completion of Revisions & Reanalysis Required for Item II.K.3.30 of NUREG-0737 Scheduled for 820701 ML20072Q7031983-03-18018 March 1983 RO 50-336/83-07:nonconservative Assumptions Discovered in Steam Generator Tube Rupture analysis.C-E Failed to Utilize Conservative Secondary Side Steam Pressure Values in Analysis.Addl Info Will Be Provided 05000336/LER-1983-007-01, /01T-0:on 830318,nonconservative Safety Analysis Assumption Discovered in Steam Generator Tube Rupture Analysis.Caused by Failure of Analysis to Consider Impact of Automatic Valves.Analyses Will Be Docketed Shortly1983-03-31031 March 1983 /01T-0:on 830318,nonconservative Safety Analysis Assumption Discovered in Steam Generator Tube Rupture Analysis.Caused by Failure of Analysis to Consider Impact of Automatic Valves.Analyses Will Be Docketed Shortly B10688, Application for Amend to License DPR-65,revising Tech Specs to Reflect Changes in Cycle 6 Reload Operating Characteristics1983-04-13013 April 1983 Application for Amend to License DPR-65,revising Tech Specs to Reflect Changes in Cycle 6 Reload Operating Characteristics ML20073M2761983-04-30030 April 1983 Steam Generator Tube Rupture Event ML20073M2881983-04-30030 April 1983 Proposed Tech Specs Changing Cycle 6 Reload Operating Characteristics ML20073M2451983-04-30030 April 1983 Reload Safety Analysis B10788, Discusses Re Proposed Revs to Tech Specs for Cycle 6 Reload.Current Tech Spec Limits Provide Acceptable Margin of Safety1983-05-16016 May 1983 Discusses Re Proposed Revs to Tech Specs for Cycle 6 Reload.Current Tech Spec Limits Provide Acceptable Margin of Safety ML20076K3231983-07-0101 July 1983 Forwards Response to 830610 Request for Addl Info Re Methodology Used to Perform Safety Analyses Supporting Cycle 6 Operation.Analyses Performed Based on C-E Owners Group Rept CEN-199 in Response to NUREG-0737,Item II.K.2.17 A03323, Forwards Addl Info Re Methodology Utilized in Performing Safety Analysis Supporting Cycle 6 Operation,In Response to Question 400.5 in1983-07-15015 July 1983 Forwards Addl Info Re Methodology Utilized in Performing Safety Analysis Supporting Cycle 6 Operation,In Response to Question 400.5 in A03413, Submits Addl Info Re Steam Generator Tube Rupture Event Analyzed in Support of Cycle 6 Operation,Per 830725 Request. Current Steam Generator Tube Rupture Analysis Adequate to Support Cycle 6 Operation1983-08-0808 August 1983 Submits Addl Info Re Steam Generator Tube Rupture Event Analyzed in Support of Cycle 6 Operation,Per 830725 Request. Current Steam Generator Tube Rupture Analysis Adequate to Support Cycle 6 Operation B10944, Forwards Suppl to Reload Safety Analyses for Cycle 6 Operation. Cycle 6 Reload Design Does Not Result in Previously Acceptable Safety Limits for Any Incident to Be Exceeded.Startup Scheduled for 8312301983-11-17017 November 1983 Forwards Suppl to Reload Safety Analyses for Cycle 6 Operation. Cycle 6 Reload Design Does Not Result in Previously Acceptable Safety Limits for Any Incident to Be Exceeded.Startup Scheduled for 831230 ML20082L2441983-11-30030 November 1983 Suppl to Reload Safety Analyses for Cycle 6 Operation ML20149E0211983-12-30030 December 1983 Safety Evaluation Supporting Amend 90 to License DPR-65 B11011, Application for Amend to License DPR-65,revising Tech Specs Re Power Distribution Limit Total Planar Radial Peaking Factor1984-01-20020 January 1984 Application for Amend to License DPR-65,revising Tech Specs Re Power Distribution Limit Total Planar Radial Peaking Factor B11013, Application for Amend to License DPR-65,changing Tech Specs by Revising Total Planar Peaking Factor Limits1984-01-25025 January 1984 Application for Amend to License DPR-65,changing Tech Specs by Revising Total Planar Peaking Factor Limits ML20080K5481984-01-25025 January 1984 Proposed Tech Spec Changes,Revising Total Planar Peaking Factor Limits ML20080K6961984-01-31031 January 1984 Proposed Tech Specs Re Power Distribution Limit Total Planar Radial Peaking Factor B11096, Forwards Startup Test Rept Cycle 6. Results within Acceptance Criteria W/Exception of Low Power Measurement of Control Element Assembly (CEA) Reactivity Worths.One CEA Bank Slightly in Excess of Criteria1984-03-27027 March 1984 Forwards Startup Test Rept Cycle 6. Results within Acceptance Criteria W/Exception of Low Power Measurement of Control Element Assembly (CEA) Reactivity Worths.One CEA Bank Slightly in Excess of Criteria ML20087P7131984-03-31031 March 1984 Startup Test Rept Cycle 6 1983-05-16 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:49798&oldid=4625189"