MONTHYEAR05000302/LER-1982-058-01, /01T-0:on 820924,valve Lineups Identified Which Allow Once Through Steam Generator Drain Lines to Be Used for Blowdown Operations & Also Allows High Energy Fluid Through Lines.Caused by Inadequate Review of Sys Design1982-10-0808 October 1982
[table view]/01T-0:on 820924,valve Lineups Identified Which Allow Once Through Steam Generator Drain Lines to Be Used for Blowdown Operations & Also Allows High Energy Fluid Through Lines.Caused by Inadequate Review of Sys Design ML20027E6861982-11-0808 November 1982 Clarifies Procedures Implemented to Assure Safe Operation of once-through Steam Generator Blowdown Lines Until Refuel V.Procedure OP-202,plant Heatup,Modified to Insure Valve Closure within 24-h After Reaching 15% Rated Power ML20066E9851982-11-0808 November 1982 Clarifies Procedures Implemented to Assure Safe Operation of once-through Steam Generator Blowdown Lines Until Refuel V.Concurrence to Maintain Lines in High Energy Line State During Each Startup & Shutdown Until Refuel V Requested 1982-10-08 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:48977&oldid=3545638"