TAC:48062
From kanterella
Jump to navigation
Jump to search
Request for: Approved, Closed | |
Questions Answers Results
Other: A02357, Ro:On 820629,primary to Secondary Leakage Rate Increased. Caused by Erosion & Thermal Cycling.Prompt Corrective Action Initiated for Leakage in Excess of 0.5 Gpm Per Steam Generator, B10581, Describes Activities Currently Planned for 1983 Refueling Outage to Assure Continued Operability of Steam Generators. Any Licensing Action Will Be Initiated in Time to Support Scheduled 830416 Outage, B10672, Ro:On 830131,increased Primary to Secondary Leakage Rate Noted in Steam Generator 1.Caused by Expected Erosion in Leakage Area & Thermal Cycling Due to Power Transients & Plant Trips.Leakage Rate Measurements on 830202 Listed, ML20054C168, ML20054F221, ML20072H501 | |
| From | |
MONTHYEARML20054C1681982-04-0707 April 1982
[table view]Ro:On 820323,during Reactor Trip from Full Power Operating Conditions,Baseline primary-to-secondary Leakage Rates Increased.Caused by Increased Steam Generator Activity Due to Trip.Equilibrium Operation in Mode 1 Achieved on 820326 ML20054F2211982-06-0202 June 1982 Forwards Cycle 5 Refueling Outage Steam Generator Profilometry Insp Results,Per Util .Results Confirm Integrity of Steam Generator Tubes & Supports & Assure Continued Applicability of Design Basis Analyses A02357, Ro:On 820629,primary to Secondary Leakage Rate Increased. Caused by Erosion & Thermal Cycling.Prompt Corrective Action Initiated for Leakage in Excess of 0.5 Gpm Per Steam Generator1982-07-0909 July 1982 Ro:On 820629,primary to Secondary Leakage Rate Increased. Caused by Erosion & Thermal Cycling.Prompt Corrective Action Initiated for Leakage in Excess of 0.5 Gpm Per Steam Generator B10581, Describes Activities Currently Planned for 1983 Refueling Outage to Assure Continued Operability of Steam Generators. Any Licensing Action Will Be Initiated in Time to Support Scheduled 830416 Outage1982-11-19019 November 1982 Describes Activities Currently Planned for 1983 Refueling Outage to Assure Continued Operability of Steam Generators. Any Licensing Action Will Be Initiated in Time to Support Scheduled 830416 Outage B10672, Ro:On 830131,increased Primary to Secondary Leakage Rate Noted in Steam Generator 1.Caused by Expected Erosion in Leakage Area & Thermal Cycling Due to Power Transients & Plant Trips.Leakage Rate Measurements on 830202 Listed1983-02-10010 February 1983 Ro:On 830131,increased Primary to Secondary Leakage Rate Noted in Steam Generator 1.Caused by Expected Erosion in Leakage Area & Thermal Cycling Due to Power Transients & Plant Trips.Leakage Rate Measurements on 830202 Listed ML20072H5011983-03-0101 March 1983 Proposed Tech Spec Revs Re Frequency of Steam Generator Inservice Insp ML20071D7771983-03-0101 March 1983 Proposed Changes to Tech Spec 3.4.6.2.b,extending Time Period Which Plant Must Be in Cold Shutdown Following Determination That Unidentified RCS Leakage Exceeded 1.0 Gpm Limit B10712, Application for Amend to License DPR-65,changing Tech Spec 3.4.6.2.b to Extend Time Period Which Plant Must Be in Cold Shutdown Following Determination That Unidentified RCS Leakage Exceeded 1.0 Gpm Limit1983-03-0101 March 1983 Application for Amend to License DPR-65,changing Tech Spec 3.4.6.2.b to Extend Time Period Which Plant Must Be in Cold Shutdown Following Determination That Unidentified RCS Leakage Exceeded 1.0 Gpm Limit B10724, Application for Amend to License DPR-65,revising Tech Specs Re Steam Generator Inservice Insp1983-03-14014 March 1983 Application for Amend to License DPR-65,revising Tech Specs Re Steam Generator Inservice Insp 1982-07-09 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:48062&oldid=4440347"