TAC:47577
From kanterella
Jump to navigation
Jump to search
Request for: Open | |
Questions Answers Results Other: B10408, Informs of Status of Transient & Accident Analyses Review to Determine Steam Generator Operability W/Approx 1,500 Plugged Tubes.All non-LOCA & Small Break Analyses Remain Valid. Analysis of Large Break Scenario Will Be Docketed by 820212, B10420, Forwards Addl Info Supporting Amend to Ol,To Limit Steam Generator Inservice Insps During Cycle 5 Refueling Outage, B10425, Forwards Large Break Loca/Eccs Performance Results W/Addl Plugged Steam Generator Tubes, B10581, Describes Activities Currently Planned for 1983 Refueling Outage to Assure Continued Operability of Steam Generators. Any Licensing Action Will Be Initiated in Time to Support Scheduled 830416 Outage, ML20040A554, ML20040A557, ML20040C965, ML20041C396, ML20042C036, ML20042C042, ML20049J152, ML20054F221 | |
| From | |
MONTHYEARML20040A5541982-01-12012 January 1982
[table view]Steam Generator Eddy-Current Test Results,Jan 10,1982 ML20040A5501982-01-12012 January 1982 Application to Amend License DPR-65,changing Tech Spec Table 4.4-6 to Delete Category C-3 Tubes from Steam Generator Tube ML20040C9651982-01-22022 January 1982 Forwards Revised Figures 1-4 Which Define Affected Areas of Steam Generator Tube Bundle to Which Util Proposed to Limit Cycle 5 Refueling Outage Steam Generator eddy-current Exams. Revised Figures Part of Proposal to Limit Inservice Insp ML20040A5571982-01-31031 January 1982 Proposed Revision to Tech Spec Table 4.4-6,deleting Category C-3 Tubes from Steam Generator Tube Insp B10408, Informs of Status of Transient & Accident Analyses Review to Determine Steam Generator Operability W/Approx 1,500 Plugged Tubes.All non-LOCA & Small Break Analyses Remain Valid. Analysis of Large Break Scenario Will Be Docketed by 8202121982-02-0404 February 1982 Informs of Status of Transient & Accident Analyses Review to Determine Steam Generator Operability W/Approx 1,500 Plugged Tubes.All non-LOCA & Small Break Analyses Remain Valid. Analysis of Large Break Scenario Will Be Docketed by 820212 B10384, Forwards Addl Info in Support of Util 820112 Application to Amend OL to Limit Steam Generator Tube Inservice Insps Conducted During Cycle 5 Refueling Outage.Revised Tube Maps of Defects Found During Eddy Current Exams Encl1982-02-0505 February 1982 Forwards Addl Info in Support of Util 820112 Application to Amend OL to Limit Steam Generator Tube Inservice Insps Conducted During Cycle 5 Refueling Outage.Revised Tube Maps of Defects Found During Eddy Current Exams Encl ML20041B6101982-02-10010 February 1982 Notification of 820216 Meeting W/Util in Bethesda,Md to Discuss Encl Meeting Agenda Re Steam Generator Review B10420, Forwards Addl Info Supporting Amend to Ol,To Limit Steam Generator Inservice Insps During Cycle 5 Refueling Outage1982-02-12012 February 1982 Forwards Addl Info Supporting Amend to Ol,To Limit Steam Generator Inservice Insps During Cycle 5 Refueling Outage B10425, Forwards Large Break Loca/Eccs Performance Results W/Addl Plugged Steam Generator Tubes1982-02-19019 February 1982 Forwards Large Break Loca/Eccs Performance Results W/Addl Plugged Steam Generator Tubes ML20041C3961982-02-28028 February 1982 Large Break Loca/Eccs Performance Results W/Addl Plugged Steam Generator Tubes B10448, Application for Amend to License DPR-65,providing Daily Sampling for Gross Activity in Each Steam Generator During Cycle 5 Operation to Assure Prompt Detection & Monitoring of Primary to Secondary Leakage1982-03-0404 March 1982 Application for Amend to License DPR-65,providing Daily Sampling for Gross Activity in Each Steam Generator During Cycle 5 Operation to Assure Prompt Detection & Monitoring of Primary to Secondary Leakage ML20042C0361982-03-0505 March 1982 Amend 73 to License DPR-65,changing Tech Specs to Allow Reactor Heatup for Cycle 5 Operation W/Less than 100% Insp of Tubes in Each Steam Generator ML20042C0421982-03-0505 March 1982 Notice of Issuance & Availability of Amend 73 to License DPR-65 ML20042C0381982-03-0505 March 1982 Safety Evaluation Supporting Amend 73 to License DPR-65 ML20049J1521982-03-31031 March 1982 Proposed Tech Spec Page 3/4 7-8,providing Daily Sampling for Gross Activity in Each Steam Generator During Cycle 5 Operation to Assure Prompt Detection & Monitoring of Primary to Secondary Leakage ML20054F2211982-06-0202 June 1982 Forwards Cycle 5 Refueling Outage Steam Generator Profilometry Insp Results,Per Util .Results Confirm Integrity of Steam Generator Tubes & Supports & Assure Continued Applicability of Design Basis Analyses B10581, Describes Activities Currently Planned for 1983 Refueling Outage to Assure Continued Operability of Steam Generators. Any Licensing Action Will Be Initiated in Time to Support Scheduled 830416 Outage1982-11-19019 November 1982 Describes Activities Currently Planned for 1983 Refueling Outage to Assure Continued Operability of Steam Generators. Any Licensing Action Will Be Initiated in Time to Support Scheduled 830416 Outage B10724, Application for Amend to License DPR-65,revising Tech Specs Re Steam Generator Inservice Insp1983-03-14014 March 1983 Application for Amend to License DPR-65,revising Tech Specs Re Steam Generator Inservice Insp 1982-02-28 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:47577&oldid=3540985"