Pages that link to "WCAP-13360-P-A"
Jump to navigation
Jump to search
The following pages link to WCAP-13360-P-A:
Displaying 46 items.
- ML16168A345 (← links)
- ML16193A658 (← links)
- ML18023A158 (← links)
- ML15055A032 (← links)
- ML13212A169 (← links)
- ML12153A329 (← links)
- ML12055A388 (← links)
- NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Bases for Improved Technical Specifications (← links)
- NL-16-2280, Vogtle Electric Generating Plant, Units 1 & 2, Updated Final Safety Analysis Report, Figures 3D-137 Through 4.3-41 (← links)
- ML090580196 (← links)
- ML18207A359 (← links)
- ML073100085 (← links)
- ML072480159 (← links)
- ML053570273 (← links)
- ML18257A065 (← links)
- ML18155A447 (← links)
- L-2016-058, Licensee Qualification for Performing Dynamic Rod Worth Measurement Analysis (← links)
- NRC 2012-0068, Licensee Qualification for Performing Dynamic Rod Worth Measurement Analysis (← links)
- ML19078A034 (← links)
- SBK-L-06173, Licensee Qualification for Performing Dynamic Rod Worth Measurement Analysis (← links)
- ML042100447 (← links)
- NL-04-0256, Qualification to Perform Dynamic Rod Worth Measurement Calculations (← links)
- ML040280458 (← links)
- ML031840379 (← links)
- ML20095H450 (← links)
- ML20154Q861 (← links)
- ML20206C790 (← links)
- ML20247H039 (← links)
- ML20236H732 (← links)
- ML20211B128 (← links)
- ML20211B112 (← links)
- ML20309A750 (← links)
- NSD-NRC-96-4847, Discusses Rod Worth Measurement Results at Most Recent Startup Tests for Noted Plants (← links)
- ML23284A425 (← links)
- ML24128A098 (← links)
- RA-19-0245, Of DPC-NE-1007-P, Conditional Exemption of the EOC Mtc Measurement Methodology (← links)
- ML20198C885 (← links)
- ML20198C329 (← links)
- ML20198C314 (← links)
- ML20155F664 (← links)
- ML20155F654 (← links)
- ML20155D418 (← links)
- ML16230A512 (← links)
- RA-15-0031, Application to Revise Technical Specifications for Methodology Report DPC-NE-1008-P, Revision 0, Nuclear Design Methodology Using CASMO-5/Simulate-3 for Westinghouse Reactors (← links)
- DCL-12-002, Revision to the Updated Final Safety Analysis Report Section 4.3.2.2, Power Distribution; and Technical Specification Bases 3.1.7, Rod Position Indication; 3.2.1, Heat Flux Hot Channel Factor (Fo(Z)),3.2.2,. (← links)
- L-2025-143, Units 3 and 4, and Independent Spent Fuel Storage Installation (ISFSI) - 10 CFR 50.59(d)(2) and 10 CFR 72.48(d)(2) Evaluation Summary Reports (← links)