Pages that link to "TXX-4958"
← TXX-4958
Jump to navigation
Jump to search
The following pages link to TXX-4958:
Displayed 4 items.
- TXX-6117, Interim Deficiency Rept CP-86-36 Re Scope of Plant Mods Resulting from Project Pipe Support Reverification Program. Initially Reported on 860609.No Addl Instances Identified During Evaluation.Next Rept Will Be Submitted by 870108 (← links)
- TXX-4958, Interim Deficiency Rept CP-86-36 Re Scope of Plant Mods Resulting from Pipe Support Reverification Program.Initially Reported on 860609.Encl Lists Support Mods Initiated to Date.Next Rept by 860926 (← links)
- TXX-5033, Interim Deficiency Rept CP-86-36 Re Pipe Support Mods. Initially Reported on 860609.No Addl Instances Reportable Per 10CFR50.55(e) Identified During Continuing Engineering Evaluation.Next Rept Will Be Submitted on or About 861029 (← links)
- TXX-6044, Interim Deficiency Rept CP-86-36 Re Large Bore Piping Supports.Initially Reported on 860609.Scope Revised to Delete Small Bore ASME Class 2 & 3 Piping to Provide More Accurate Results.Next Rept Will Be Submitted by 861201 (← links)