Pages that link to "TAC:51938"
Jump to navigation
Jump to search
The following pages link to TAC:51938:
Displaying 13 items.
- ML20127J539 (← links)
- ML20155C835 (← links)
- ML20207L237 (← links)
- B13346, Forwards Tornado Missile Risk Analysis of Bleed & Feed & Auxiliary Feedwater Safe Shutdown Sys at Connecticut Yankee Atomic Power Station, Per SEP Topics III-2 & III-4.A (← links)
- B13019, Forwards Update on Isap Topic Reviews Discussed in Util ,Description of New Topics Being Added to Isap, Updated Integrated Implementation Schedule & Summary Table of Isap ARM Scores & Installation man-rem for Each Project (← links)
- B12935, Forwards Proposed Methodology to Resolve SEP Topics III-2 & III-4.A,per 880407 Meeting W/Nrc.Util Has Determined That Proposed Methodology Utilizing Probabilistic Techniques Is Sound & Reasonable as Means of Resolution of Topics (← links)
- B14154, Submits Updated Rept on Plant Integrated Safety Assessment Program (Isap),Per License Condition Issued by NRC License Amend 150,dtd 920226.List of All Isap Topics,Including Both Open & Topics Considered Closed by Util Encl (← links)
- B14597, Forwards Addl Info to Support Closeout of SEP Topics III-2 & III-4.A Re Wind & Tornado Loadings & Tornado Missiles, Respectively (← links)
- B14582, Provides NRC W/Info to Support Review of Systematic Evaluation Topics III-2 & III-4.A.Info Requested by Staff in Question & Response Format Included as Attachment 1 Also Encl (← links)
- B14519, Forwards Applied Research Associates,Inc Final Rept 5773.1, Tornado PRA of CT Yankee Atomic Power Station:Update 1992, to Support Closeout of SEP Topics III-2 & III-4.A Re Wind & Tornado Loadings/Tornado Missiles,Respectively (← links)
- B13362, Forwards List of Isap Topics,Update on Isap Topic Review, Evaluation of New or Reevaluation of Existing Isap Topics, Control Room Design Review & Human Engineering Discrepancies Summary,Integrated Implementation Schedule & Summary Table (← links)
- B14314, Forwards Updated Rept on Haddam Neck Plant Integrated Safety Assessment Program (Isap) Re License Condition Issued by NRC in License Amend 150 (← links)
- B13463, Forwards Vol 6 to Nusco 149, Probabilistic Safety Study. Rept Provides Results of Study to Quantify core-melt Frequency at Plant Due to tornado-initiated Accident Sequences,Per SEP Topics III-2 & III-4A (← links)