Pages that link to "RA-24-0058, Cycle 25 Core Operating Limits Report (COLR)"
Jump to navigation
Jump to search
The following pages link to RA-24-0058, Cycle 25 Core Operating Limits Report (COLR):
Displayed 50 items.
- RA-20-0023, Notification of Deviation from BWRVIP Guidelines (← links)
- RA-20-0016, Sea Turtle Annual Report (← links)
- RA-20-0045, RA-20-0045, Request for Alternative to Examination Category B-N-1 (VT-3) Visual Examination of Accessible Areas of the Reactor Vessel Interior (← links)
- RA-20-0142, Application to Revise Technical Specifications to Adopt TSTF-566, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems (← links)
- RA-19-0447, Proposed Alternative for RPV Nozzle-to-Vessel Weld and Inner Radii Examination Requirements in Accordance with 10 CFR 50.55a(z)(1) (← links)
- RA-20-0217, Cycle 23 Startup Report (← links)
- RA-20-0291, Revision to Radiological Emergency Response Plan (← links)
- RA-20-0165, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements (← links)
- RA-20-0351, Registration for Use of General License Spent Fuel Casks (← links)
- RA-20-0341, Revision to Radiological Emergency Response Plan Implementing Procedure (← links)
- RA-20-0324, Response to Request for Additional Information for Proposed Alternative for RPV Nozzle-to-Vessel Weld and Inner Radii Examination Requirements (← links)
- RA-20-0347, 10 CFR 71.95 Report on the 3-60B Cask (← links)
- RA-20-0323, Transmittal of Duke Energy Progress (DEP) Physical Security Plan, Revision 14 (← links)
- RA-20-0361, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements, Dated September 24, 2020, ADAMS Accession Number ML20272A091 (← links)
- RA-20-0359, Supplement to Response for Request for Additional Information for Proposed Alternative for RPV Nozzle-to-Vessel Weld and Inner Radii Examination Requirement (← links)
- RA-20-0390, Revision to Radiological Emergency Response Plan (← links)
- RA-19-0352, Duke Energy Carolinas, LLC - Relief Request for Alternative for Reactor Vessel Closure Stud Examinations (← links)
- RA-20-0375, Revision to Radiological Emergency Response Plan Implementing Procedure (← links)
- RA-21-0021, 30-Day Report Pursuant to 10 CFR 50.46, Changes to or Errors in an Acceptable Loss of Coolant Evaluation Model (← links)
- RA-20-0373, Submittal of IWB-3640 Analytical Evaluation of RPV Nozzle N4D Safe End to Pipe Weld Indication (← links)
- RA-20-0244, Submittal of Updated Final Safety Analysis Report Revision 27, 10 CFR 54.37 Update, Technical Specifications Bases, Technical Requirements Manuals, Quality Assurance Program Description (← links)
- RA-21-0020, Sea Turtle Annual Report (← links)
- RA-20-0353, Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Service Water (SW) System Buried Piping in Accordance with 10 CFR 50.55a(z)(1) (← links)
- RA-21-0009, Request for License Amendment - Standby Liquid Control (SLC) System Boron Solution Storage Tank Volume (← links)
- RA-21-0113, 6 to Radiological Emergency Response Plan (← links)
- RA-21-0098, Unit 2 Cycle 25 Core Operating Limits Report (COLR) and Reload Safety Analysis Report (RSAR) (← links)
- RA-18-0183, License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (← links)
- RA-21-0141, Units 1 & 2 - Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative (← links)
- RA-21-0138, Additional Information Regarding Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Pair/Replacement of Service Water (SW) System Buried Piping in Accordance with (← links)
- RA-21-0171, Revision to Radiological Emergency Response Plan Implementing Procedure (← links)
- RA-21-0154, 30-Day Report Pursuant to 10 CFR 50.46, Changes to or Errors in an Acceptable Loss of Coolant Evaluation Model (← links)
- RA-21-0176, Cycle 24 Mellla+ Eigenvalue Tracking Data (← links)
- RA-21-0194, Additional Information Regarding Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/ Replacement of Service Water (SW) System Buried Piping in Accordance. (← links)
- RA-20-0247, Supplement to Proposed Alternative for RPV Nozzle-to-Vessel Weld and Inner Radii Examination Requirements in Accordance with 10 CFR 50.55a(z)(1) (← links)
- RA-21-0232, Independent Spent Fuel Storage Installation (Isfsi), Registration for Use of General License Spent Fuel Casks (← links)
- RA-21-0208, Revision to Radiological Emergency Response Plan Implementing Procedures. Includes 10 CFR 50.54(q)(5) Summary for AD-EP-BNP-0407, Revision 0 (← links)
- RA-21-0235, Supplement to Exemption Request for Senior Reactor Operator License Application (← links)
- RA-21-0262, Response to Request for Additional Information Regarding Proposed Alternative to ASME Boiler & Pressure Vessel Code Section XI Requirements for Repair/Replacement of Service Water (SW) System Buried Piping (← links)
- RA-21-0217, Exemption Request for Senior Reactor Operator License Application (← links)
- RA-21-0291, Revision to Emergency Plan Implementing Procedures (← links)
- RA-21-0272, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - RITSTF Initiative 4b (← links)
- RA-21-0275, Response to Request for Additional Information, Exemption Request for Senior Reactor Operator License Application (← links)
- RA-20-0127, Application to Revise Technical Specifications to Adopt TSTF-568, Revise Applicability of BWR TS 3.6.2.5 and TS 3.6.3.2 (← links)
- RA-20-0181, Submittal of Revision to Radiological Emergency Response Plan Implementing Procedure (← links)
- RA-21-0239, Application to Revise Technical Specifications to Adopt TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling (← links)
- RA-21-0330, One-Time Exemption from 10 CFR 50, Appendix E, Section IV.F.2.d (← links)
- RA-22-0003, Response to Requests for Additional Information for Reactor Vessel Closure Stud Exam Extension Alternative (← links)
- RA-22-0046, Withdrawal of One-Time Exemption from 10 CFR 50, Appendix E, Section IV.F.2.d (← links)
- RA-22-0020, 2021 Sea Turtle Annual Report (← links)
- RA-22-0110, Supplement to License Amendment Request to Revise Technical Specifications to Adopt Risk-Informed Completion Times TSTF-505, Revision 2, Provide Risk-Informed Extended Completion Times - Ritstf. (← links)