Pages that link to "Pitesa J"
← Pitesa J
The following pages link to Pitesa J:
Displaying 49 items.
- ML15331A075 (← links)
- ML15159A632 (← links)
- ML11231A953 (← links)
- ML11229A720 (← links)
- ML11109A074 (← links)
- ML092390391 (← links)
- ML092260586 (← links)
- ML092230343 (← links)
- ML090641017 (← links)
- ML18219B193 (← links)
- ML18290A923 (← links)
- RA-15-0044, Indemnity Agreements for Proof of Acceptance (← links)
- ML20113D290 (← links)
- ML20141F027 (← links)
- ML20140H510 (← links)
- ML20140H485 (← links)
- ML20134K656 (← links)
- 05000369/LER-1997-009, :on 970906,reactor Trip Occurred on Both Units Due to Loss of non-vital Power to Plant components.Re-closed Breaker MKA-1B,restored Kxa to Svc,Replaced Breaker MKA-1B & Repaiared Cable Connection (← links)
- 05000370/LER-1997-003-05, :on 970718,declared Ice Condenser Lower Inlet Doors Inoperable.Caused by Interference Between Door Frame Flashing & Lower Inlet Doors.Performed Mod to Remove Portions of Flashing Which Cause Interference (← links)
- 05000370/LER-1997-002-06, :on 970711,RT Occurred Due to RCP Motor Failure.Replaced 2D Motor Stator W/Rewound Spare (← links)
- 05000369/LER-1996-005-01, :on 961101,TS Required Shutdown of Both Units Due to Failed Surveillance Test of Vital Battery Evcc.Caused Is Unknown.Replaced & Retested Vital Battery Bank Evcc (← links)
- 05000369/LER-1997-002, :on 970313,FWIVs Were Declared Inoperable Due to Hydraulic Oil Degradation.Solenoid Coils & Plungers Were Replaced or Cleaned (← links)
- 05000369/LER-1997-001-01, :on 970318,failure to Comply W/Ts 3.6.3 Following Valve 1CF-26AB Inoperability,Occurred.Caused by Misinterpretation of Reference Documents Re Applicability. Correct Application of TS Clarified (← links)
- 05000370/LER-1997-001-06, :on 970527,DG Load Sequencer 2B Inadvertent Esfa Occurred.Caused by Inadequate Development & Review of Change Made to Sequencer Timer Calibr Procedure.Review of Similar Procedures Being Conducted (← links)
- 05000369/LER-1997-007, :on 970514,Unit 1 RT Occurred During Power Range Nuclear Instrumentation Testing.Caused by Personnel Utilizing Inappropriate Procedure for Existing Plant Conditions.Reviewed Subject & Associated Procedures (← links)
- 05000369/LER-1997-006, :on 970512,Unit 1 Esfa Occurred Due to Tripping of MFW Pumps.Enhanced Procedural Guidance Re Functional Verification of Equipment After Maint (← links)
- 05000369/LER-1997-004, :on 970320,main Steam Safety Valve TS Inaccuracies Were Discovered.Caused by Incorrect vendor-supplied Algorithm.Engineering Guidelines for Plant Operation Are in Place & TS Has Been Revised (← links)
- 05000369/LER-1997-003-02, :on 970326,both Trains of Control Room Ventilation Sys Inoperable Due to Isolated Air Intake Valves.Radiation Monitor Will Be Evaluated to Determine If Changes Are Needed in Design or Maint (← links)
- 05000369/LER-1997-001-03, :on 970318,failure to Comply W/Ts 3.6.3 Requirements Following Valve 1CF-26AB Inoperability Was Identified,Due to Misinterpretation of Reference Documents. Application of TS to Valve Was Clarified (← links)
- 05000369/LER-1997-002-03, :on 970313,inoperability of FW Isolation Valves Discovered Due to Hydraulic Oil Degradation.Replaced Unit FWIV Solenoid Coils (← links)
- 05000369/LER-1996-004, :on 961010,incorrectly Calibrated Rcl Loss of Flow Reactor Trip Bistables Identified.Caused by Procedural/ Technical Inaccuracy.All Affected Procedures Were Changed & Instruments Calibrated within TS Limits (← links)
- 05000370/LER-1996-005-07, :on 961109,automatic Start of 2B EDG Due to 6 Kv Switchgear 2TD Bus Lockout,Resulting in 2ETB Blackout. Cause Unknown.Relay Replaced & Will Be Analyzed to Determine Cause (← links)
- 05000369/LER-1996-005-04, :on 961101,TS Required Shutdown of Both Units Occurred Due to Failed Surveillance Test of Vital Battery Evcc.All Vital Battery Banks Will Be Replaced with Conventional Batteries by End of 2EOC11 Outage (← links)
- 05000369/LER-1996-003, :on 960618,during Scheduled Operability Test of EDG 1A,EDG Declared Inoperable.Caused by Equipment Failure/ Malfuction of EDG 1A & Equipment Failure & Mfg Process Deficiency of EDG 1B.EDGs SD & Failed Components Replaced (← links)
- 05000369/LER-1996-004-05, :on 961010,incorrectly Calibrated Reactor Coolant Loop Loss of Flow Reactor Trip Bistables Identified. Caused by Procedure Technical Inaccuracy.All Affected Procedures Were Changed (← links)
- 05000369/LER-1996-006, :on 961109,actuation of Both Unit 1 Motor Driven Feedwater Pumps Were Manually Initiated Due to Loss of Auxiliary Steam Supply to Main Feedwater Pump Turbine. Pump Has Been Repaired (← links)
- 05000369/LER-1996-007-02, :on 961107,mode Related Missed TS Surveillance on Containment Integrity Discovered Due to Technical Inaccuracy.Pm/Pt Database Corrected & TS Surveillance Quality Improvement Team Formed (← links)
- 05000369/LER-1996-006-03, :on 961109,manually Initiated Actuation of Unit 1 Driven AFW Pumps Occurred Due to Loss of as Supply to MFW Pump Turbine.Caused by Insufficient Lubrication.No Corrective Actions Right Now (← links)
- 05000370/LER-1996-004-02, :on 960524,Emergency Diesel Generator 2A Automatically Started.Caused by Lightning Strike.Personnel Dispatched to Check Alarms & Restarted Tripped Equipment.W/ (← links)
- 05000370/LER-1996-003-02, :on 960522,Unit 2 Reactor Tripped Due to Low Reactor Coolant Sys Flow.Caused by RCP Motor 2B Failure.Nc Pump Motors 2D & 2C Replaced & 2B Inspected,Removed & Sent Offsite for Complete Rewind (← links)
- 05000370/LER-1996-001-01, :on 960208,RWST Level Transmitter Frozen.Caused by Insufficient Equipment Monitoring.Integrity & Proper Operation of Refueling Water Level Transmitter Panels Verified During Routine Maint & Periodically Checked (← links)
- 05000369/LER-1996-001, :on 960203,manual Reactor Tripped When 1A RCP Upper Thrust Bearing Reached Administrative Limit of 195 Degrees.Caused by Unknown Equipment Failure.Associated Sys & Components Evaluated/Tested.Unit Returned to Svc on 960205 (← links)
- 05000370/LER-1996-002-02, :on 960306,past Inoperability of EDG 2B Occurred Due to Low Lube Oil Pressure Caused by Unanticipated Interaction of Sys & Components.Increased Frequency for Periodic Venting (← links)
- 05000370/LER-1996-001-03, :on 960208,unit 2 RWST Level Instrumentation Inoperable Due to Cold Water Condition.Caused by Insufficient Monitoring.Fw Level Transmitter Panel Will Be Verified (← links)
- 05000369/LER-1996-002-01, :on 960204,inadvertent Manual Initiation of Unit 1 FW Isolation Occurred Due to Inappropriate Action. OPS Mgt Evaluated Depressing & Holding Train a & B CF Isolation (← links)
- 05000370/LER-1995-004-04, :on 951216,manually Initiated Actuation of Both Unit 2 Motor Driven Auxiliary Feedwater Pumps. Caused by Loss of Auxiliary Steam to Main Feedwater Pump Turbine. Procedures Revised (← links)
- ML15306A060 (← links)
- ML15161A121 (← links)
- 05000413/LER-2008-001, Re Auxiliary Feedwater Declared Inoperable Due to Inadequate Design and Configuration of Floor Drain Flow Restrictor Cover Plates (← links)