- ML20249C333 (← links)
- ML20249B298 (← links)
- 05000219/LER-1989-004, :on 890222,MSIV Automatic Closure Signal Occurred During Transfer of Reactor Protection Sys Power Supply.Caused by Procedural Inadequacy.Immediate Actions Taken to Open Valves & Revise Procedure (← links)
- 05000219/LER-1989-016, :on 890625,main Generator Tripped Due to Phase Differential Condition Caused by Fault of Main Output Transformer.Caused by Equipment Failure.Failed Transformer Removed & Spare Installed (← links)
- 05000219/LER-1998-008, :on 980409,building Dp Was Found to Be Out of Design Requirements.Caused by Lack of Awareness.Operations Dept Tour Logs Were Revised to Require Orw Dp Readings to Be Taken Once Per Shift (← links)
- 05000219/LER-1989-006, :on 890224,Tech Spec Inconsistency Resulted in Violation of Min Number of Channels Required for Automatic Depressurization & Core Spray Sys.Caused by Lack of Correlation for Both Sys.Procedure Revised (← links)
- 05000219/LER-1998-005, :on 980330,automatic Depressurization Sys Inoperable.Caused by Inadequate Design.Mods Performed to Install Addl Cables,Prior to Plant Start Up (← links)
- 05000219/LER-1998-006, :on 980330,noted That Five of SDC Supports Do Not Satisfy Seismic Design Criteria.Caused by Computer Modeling Error.Will Design & Install Modifications to Pipe Support Sys to Bring Supports to Compliance (← links)
- 05000219/LER-1989-018, :on 890729,loose Wire Found in High Pressure Actuation Circuit for Electromatic Relief Valve D. Possibly Caused While Performing Surveillance on 890628. Proper Connection for Wire Verified (← links)
- 05000219/LER-1988-022, :on 881002,power to 4,160 Volt Bus 1D Was Lost When Breaker 1D Tripped & Locked Out Due to Ground Fault. Caused by Isolated Defect in Cable Insulation.Cable Replaced (← links)