Pages that link to "ML20040B565"
Jump to navigation
Jump to search
The following pages link to ML20040B565:
Displaying 3 items.
- PNO-III-97-031, on 970401,licensee Identified Fractures on Auxiliary Switch Contact Block Mounted on 4 Kv Breaker Prior to Installation in Unit 2 safety-related Bus.Licensee Presently Testing Similar Breakers (← links)
- PNO-III-79-057, on 791209,draining Operation from Svc Water Header of Heat Exchanger Resulted in Unplanned Release of Radioactive Liquid from Primary Side When All Valves Feeding Instrument Header Were Opened (← links)
- PNO-III-89-036, on 890516,unit 1 Was Shutdown to Repair Socket Weld Leak on Feedwater Regulating Valve Bypass Line. Licensee Plans to Repair Other Minor Leaks & Perform Maint Activities During Unplanned Outage.State of Il Notified (← links)