Pages that link to "Council W"
Jump to navigation
Jump to search
The following pages link to Council W:
Displayed 26 items.
- ML19246B071 (← links)
- ML20133J767 (← links)
- ML20133J681 (← links)
- ML20150B147 (← links)
- ML20198B235 (← links)
- ML20197J580 (← links)
- ML20205E205 (← links)
- ML20214D109 (← links)
- ML20237L061 (← links)
- ML20236E555 (← links)
- ML20234B145 (← links)
- B11345, Responds to SER (NUREG-1031) Confirmatory Items 2,3 & 4. FSAR Revs Will Appear in Amend 10 to Fsar,Scheduled for Submittal in Oct 1984.Responses Should Fully Resolve NRC Concerns (← links)
- B10546, Final Significant Deficiency Rept SD-23 Re Emergency Diesel Generator Shaft Spider Assembly.Initially Reported on 820628.Deficiency Resulted from Loose Stud & Nuts.S&W Will Retorque All Studs & Nuts (← links)
- B10541, Notifies of Delay in Submittal of Head Vent Procedures Until 820901 (← links)
- TXX-6733, Interim Deficiency Rept CP-87-66 Re Hand Tightened Bolts in Structural Steel Connections W/Inadequately Spoiled Threads. Initially Reported on 870824.Design Change Authorization 46624 Issued.Next Rept Will Be Submitted by 880329 (← links)
- TXX-6702, Interim Deficiency Rept CP-87-57 Re Modeling Errors in Environ Computer Code Compare MOD1A.Initially Reported on 870814.Evaluation Continuing to Determine If Error Adversely Affected Calculations.Next Rept Will Be Submitted by 871116 (← links)
- TXX-6341, Final Deficiency Rept CP-86-14 Re 6.9 Kv Switchgear Breaker Jack Shaft Weld Failure.Initially Reported on 860311.All Jack Shafts in 6.9 Kv Switchgear Scheduled to Be Replaced by 871121 (← links)
- TXX-4869, Interim Deficiency Rept CP-86-12 Re Attachments in Close Proximity to Design Gaps Between Secondary Walls & Adjacent Floors.Initially Reported on 860227.Evaluation in Progress. Next Rept Will Be Submitted on 860721 (← links)
- TXX-4814, Responds to Generic Ltr 86-04 Re Policy Statement on Engineering Expertise on Shift.Util Will Use NRC Shift Technical Advisor Program Outlined in NUREG-0737,Item I.A.1.1 (← links)
- TXX-4729, Discusses Procedures Implemented Per 821203 Commitment to IE Bulletin 79-14,requiring Insps of safety-related Piping Sys to Verify That Drawings for Seismic Analysis Accurately Reflect as-built Condition (← links)
- TXX-4728, Interim Deficiency Rept CP-86-08 Re Control of Stamps Used to Identify Super Hilti Kwik Bolts.Initially Reported on 860206.Field Insps Identified Pipe Supports Possibly Affected by Deficiency.Next Rept to Be Submitted by 860424 (← links)
- ML20148P315 (← links)
- ML20148P310 (← links)
- ML20055B263 (← links)
- B10428, Comments on Systematic Assessment of Licensee Performance for Jul 1980-June 1981,discussed During 820209 Meeting.Mgt Action Will Be Taken Re Surveillance Activities to Achieve Improved Performance (← links)
- ML20054M114 (← links)