Pages that link to "CP-86-77"
← CP-86-77
Jump to navigation
Jump to search
The following pages link to CP-86-77:
Displayed 13 items.
- ML20150F326 (← links)
- ML20150B460 (← links)
- IR 05000445/1987036 (← links)
- ML20149G517 (← links)
- ML20207C553 (← links)
- ML20245G617 (← links)
- ML20211A096 (← links)
- ML20209H442 (← links)
- TXX-6606, Interim Deficiency Rept CP-86-19 Re Installation of Steam Svc Pressure Transmitters.Initially Reported on 860321. Engineering Developing Design Mod Package (DM-86-140) Re Unit 1 Instrument Installations.Next Rept by 871202 (← links)
- TXX-6103, Interim Deficiency Rept CP-86-77 Re Spec of Min Wall Thickness in Instrument Tubing.Initially Reported on 861021. Spec 2323-MS-625 & Const Procedure ICP-4 Reviewed.Next Rept Anticipated by 870121 (← links)
- TXX-6235, Interim Deficiency Rept CP-86-19 Re Installation of Steam Svc Pressure Transmitters.Initially Reported on 860321.Scope of Item Expanded to Include Corrective Actions for CP-86-77, CP-86-70 & CP-86-16.Next Rept Expected by 870320 (← links)
- TXX-6228, Final Deficiency Rept CP-86-77 Re Spec of Min Wall Thickness in Instrument Tubing.Initially Reported on 861021.Mods Will Be Implemented as Required to Alleviate All Unacceptable Conditions (← links)
- TXX-6332, Interim Deficiency Rept CP-86-19 Re Installation of Steam Svc Pressure Transmitters.Initially Reported on 860321. Program Implemented to Assure Proper Alignment & Torquing of Unistrut Nuts.Next Rept Will Be Submitted by 870731 (← links)