ML20150B460

From kanterella
Jump to navigation Jump to search
Supplemental Deficiency Rept CP-86-19 Re Instrument Installations.Completion Date for Corrective Actions Ref in Re Steam Svc Pressure Transmitters Changed from 880311 to 880708.Delay Necessary Due to Scope of Work
ML20150B460
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 03/11/1988
From: Counsil W, Woodlan D
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
CP-86-19, TXX-88312, NUDOCS 8803160442
Download: ML20150B460 (1)


Text

l i

mummme -

I EE log # TXX-88312 C..

2 File # 10110

'I r

=

910.3 i

(N 1UELECTRIC March 11, 1988 wim.m e counai Executive >k. Prenlent U. S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 INSTRUMENT INSTALLATIONS SDAR: CP-86-19 (SUPPLEMENTAL REFORT)

REF:

SDAR CP-86-16, "Fire Effects on Instrument Tubing" SDAR CP-86-50, "Unistrut Spring Nuts on Instrument Supports" SDAR CP-86-70, "Elevated Temperature Effects on Tubing" SDAR CP-86-77, "Instrument Tubing Minimum Wall Thickness" TXX-88293 of March 3, 1988 Gentlemen:

In our letter, TXX-88146, dated January 29, 1988, we stated that the corrective actions for SDAR CP-86-19 regarding steam service pressure transmitters would be complete by March 11, 1988.

However, due to the scope of the work, these corrective actions are now schedulad for completion by July 8, 1988.

Very truly yours, 0 (p. A t W. G. Couns 1 By:

D. R. Woodlan Docket Licensing Manager GLB/grr c - Mr. R. D. Martin, Region IV Resident inspectors, CPSES (3) h If DO 0445 S

DCD 400 krsh ohve Street LBof Dallas, Texas H.'Of