Pages that link to "Broschak J"
Jump to navigation
Jump to search
The following pages link to Broschak J:
Displayed 46 items.
- ML12342A252 (← links)
- ML12250A668 (← links)
- ET 14-0012, Flood Hazard Reevaluation Report in Response to NRC Request for Information Regarding Recommendation 2.1, Flooding, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (← links)
- ET 14-0008, Application for Amendment to Revise Specification 5.6.5, Core Operating Limits Report (Colr), for Large Break Loss-of-Coolant Accident Analysis Methodology (← links)
- ET 14-0011, Second Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (← links)
- ET 14-0010, Operating Corporation'S Second Six-Month Status Report for the Implementation of Order EA-12-051, Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (← links)
- ET 14-0009, Response to Request for Additional Information Regarding License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis (← links)
- ET 14-0005, Response to Request for Additional Information Regarding Response to Bulletin 2012-01, Design Vulnerability in Electric Power System. (← links)
- ET 14-0002, Correction to the Response to a Nuclear Regulatory Commission Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ic (← links)
- ET 14-0006, Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Flooding Walkdowns at Wolf Creek Generating Station (← links)
- ET 14-0003, Operating Corporation - Response to Request for Additional Information Regarding License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis (← links)
- ET 13-0039, Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns (← links)
- ET 13-0035, Fire Protection Program Re Alternative Shutdown Capability (← links)
- ET 13-0036, Submittal of Information Related to the Request for Notice of Enforcement Discretion for Technical Specification Limiting Condition for Operation 3.0.3, TS 3.8.4, DC Sources - Operating, TS 3.8.7, Lnverters - Operating, and TS 3.8.9,. (← links)
- ET 13-0030, Results of the Eighteenth Steam Generator Tube Inservice Inspection (← links)
- ET 13-0028, Application to Revise Technical Specifications to Replace a Methodology to TS 5.6.5, Core Operating Limits Report. (← links)
- ET 13-0029, Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident - 1.5 Year Response for CEUS Sites (← links)
- ET 13-0026, First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order EA-12-051) (← links)
- ET 13-0027, Operating Corporation'S First Six-Month Status Report for the Implementation of Order EA-12-049, Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (← links)
- ET 13-0023, License Amendment Request for the Transition to Westinghouse Core Design and Safety Analysis (← links)
- ET 13-0025, Corporation'S Response to Request for Additional Information Regarding Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Level Instrumentation (Order EA-12-05 (← links)
- ET 13-0024, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification (TS) 3.8.1, AC Sources - Operating Surveillance Requirement 3.8.1.10 (← links)
- ET 13-0021, Supplement to 180-Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.3 (Seismic) of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (← links)
- ET 13-0017, Operating Corporation Proposed Path to Closure of Generic Safety Issue - 191, Assessment of Debris Accumulation on Pressurized-Water Reactor Sump Performance. (← links)
- ET 13-0012, Request for Review of Information to Support Resolution of Example 2 of Non-cited Violation 05000482/2011007-03, Failure to Ensure Post-Fire Safe Shutdown Components Remain Free of Fire Damage (← links)
- ET 13-0011, Response to RAI Regarding License Amendment Request for Deviation from Fire Protection Program Requirements for Volume Control Tank Outlet Valves (← links)
- ET 13-0009, Clarification of RAI Regarding License Amendment Request to Revise Technical Specification (TS) 3.8.1, AC Sources-Operating (← links)
- ET 13-0004, Withdrawal of License Amendment Request for Deviation from Fire Protection Requirements (← links)
- ET 13-0001, Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1, Flooding, of Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (← links)
- ET 12-0033, License Amendment Request (LAR) for Deviation from Fire Protection Requirements (← links)
- ET 12-0024, Response to Request for Additional Information Regarding 10 CFR 50.55a Request Number I3R-07, Relief from ASME Code Case N-729-1 Requirements for Examination of Reactor Vessel Head Penetration Welds (← links)
- ET 12-0031, Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Recommendation 2.3 (Flooding) of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (← links)
- ET 12-0025, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification (TS) 3.6.6, Containment Spray and Cooling Systems. (← links)
- ET 12-0029, Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order No. EA-12-049) (← links)
- ET 12-0028, Initial Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) (← links)
- ET 12-0022, License Amendment Request (LAR) for Deviation from Fire Protection Program Requirements - Volume Control Tank Outlet Valves (← links)
- ET 12-0023, 10 CFR 50.46 Thirty Day Report of ECCS Model Changes (← links)
- ET 12-0018, License Amendment Request to Increase Voltage Limit for Diesel Generator Load Rejection Surveillance Requirement (← links)
- ET 12-0020, Withdrawal of License Amendment Request to Revise Technical Specification 5.6.5, Core Operating Limits Report (Colr), for Large Break Loss-of-Coolant Accident Analysis Methodology (← links)
- ET 12-0010, 10CFR50.55a Request Number I3R-07, Relief from ASME Code Case N-729-1 Requirements for Examination of Reactor Vessel Head Penetration Welds (← links)
- ET 12-0015, Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (← links)
- ET 12-0012, Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (← links)
- ET 12-0013, Day Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.3, Flooding, of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident (← links)
- ET 12-0006, Application to Revise Technical Specifications to Adopt TSTF-510, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection, Using the Consolidated Line Item Improvement Process (← links)
- ET 12-0002, License Amendment Request, Revision to Technical Specification (TS) 5.5.9, Steam Generator (SG) Program, and TS 5.6.10, Steam Generator Tube Inspection Report, for a Permanent Alternate Repair Criteria (← links)
- ET 12-0001, Supplemental Information Related to Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.6.5, Core Operating Limits Report, for Large Break Loss-of-Coolant Accident Analysi (← links)