Pages that link to "Bishop R"
← Bishop R
Jump to navigation
Jump to search
The following pages link to Bishop R:
Displayed 50 items.
- ML030210442 (← links)
- ML023010645 (← links)
- ML022200533 (← links)
- ML022200479 (← links)
- ML020380417 (← links)
- ML010450132 (← links)
- COMSECY-03-0033, Letter to R. W. Bishop, Esq., NEI, Petition for Rulemaking PRM 52-1 (← links)
- SECY-02-0175, Letter to R. W. Bishop, Esq., NEI, Petition for Rulemaking (PRM 52-2) Regarding Review of Need for Power and Alternative Energy Sources in Nuclear Power Reactor Siting and Licensing Reviews (← links)
- SECY-00-0210, -Attachmen 2-Letter to Robert Willis Bishop/Nei - Petition for Rulemaking (PRM 51-7) Regarding Severe Accident Mitigation Alternatives Reviews in Support of Operating License Renewal Applications (← links)
- ML19305B605 (← links)
- ML19305B594 (← links)
- ML20028E092 (← links)
- ML020730156 (← links)
- ML020730153 (← links)
- ML020730108 (← links)
- ML020730103 (← links)
- ML20080P260 (← links)
- ML20100E083 (← links)
- ML20113E402 (← links)
- ML20113E343 (← links)
- ML20140E308 (← links)
- ML20140E315 (← links)
- ML20137Q786 (← links)
- ML20196B917 (← links)
- ML20155D013 (← links)
- ML20198Q780 (← links)
- ML20205G051 (← links)
- ML20204F454 (← links)
- ML20202E857 (← links)
- ML20196K799 (← links)
- ML20212G629 (← links)
- ML20217B790 (← links)
- B12306, Forwards Addl Info on SPDS Isolation Devices,Per NRC 860211 Request.Encl Info Describes Addl Testing Performed (← links)
- A06152, Responds to Violations Noted in Insp Rept 50-423/86-27 on 860818-22.Corrective Actions:Plant Trouble Rept 4M3100340 Generated for Leakage in Dissolved Gas Sampling Line & Plant Mod Request Generated Re Flushing Pump (← links)
- A06151, Discusses ATWS Rule Implementation Plans.Due to Heavy Workload Expected During First Refueling Outage,Util Will Be Unable to Implement plant-specific Mods Related to ATWS Requirements by End of Outage (← links)
- A05610, Responds to Generic Ltr 86-04 Re Policy Statement on Engineering Expertise on Shift.Comparison of INPO Shift Technical Advisor Guidelines W/Established Bachelors Degree Programs in Engineering Encl (← links)
- ML20210L361 (← links)
- B11844, Forwards Summary of Seismic Interaction Program,Per 851024 Meeting.Review & Approval Requested Prior to 851115 Fuel Load Date (← links)
- B12153, Responds to 851017 Recommendations Re Risk Evaluation Rept (NUREG-1152).ASTM A325 High Strength Bolts Installed for Anchoring Lube Oil Cooler.Emergency Procedures Re Earthquake Damage Will Be Delayed (← links)
- B12124, Forwards Listing of Footnotes Re NRC Generic Issue Mgt Tracking Sys.Next Update Will Be Provided by 860630 (← links)
- B12085, Forwards Nonproprietary Haddam Neck Plant Isap Public Safety Impact Model Project Analyses Summaries & Proprietary Haddam Neck Plant Isap Public Safety Impact Model. Proprietary Rept Withheld (Ref 10CFR2.790) (← links)
- A05796, Responds to NRC Re Violations Noted in Insp Rept 50-423/85-74.Corrective Actions:Design Calculations Involving Reactor Coolant Pump P-1 Snubber Support Revised. Fig 1 of Reactor Coolant Pump Encl (← links)
- B11830, Forwards Proprietary WCAP-10991 & Nonproprietary WCAP-10992, Westinghouse Setpoint Methodology for Protection Sys, Millstone Nuclear Power Station Unit 3. Proprietary Rept Withheld (← links)
- B12203, Confirms That Current pressure-temp Operating Limit Curves Valid Until at Least 870702,per 860708 & 16 Telcons.License Amend Request Re Revised pressure-temp Curves Will Be Submitted by 861031 (← links)
- ML20203J942 (← links)
- B12112, Forwards Fire Protection Evaluation Shutdown Sys Availability, Per 860605 Meeting W/Nrc at Region I. W/O Encl (← links)
- B12087, Requests Exemption from App R Requirement for battery- Powered Lighting Units for Emergency Lighting in Areas Where Impractical.Security Lighting or Portable Lighting Will Be Used in Event of Fire & Loss of Offsite Power.Fee Paid (← links)
- B12102, Forwards Response to 851206 Request for Description of Flow Modeling Methodology Used for three-loop Main Steam Line Break Analysis,Identified as Open Item in Sser 4 (NUREG-1031) (← links)
- B11838, Forwards Review of Integrated Safety Assessment Program Topic 1.09, Reg Guide 1.97 Instrumentation, Per 850517 Commitment (← links)
- B11835, Responds to NRC 851023 Request for Addl Info on SER Confirmatory Item 27 Re Effect of Insulation Debris on Pump Performance.Revised FSAR Pages Encl (← links)