Pages that link to "3F0894-02"
Jump to navigation
Jump to search
The following pages link to 3F0894-02:
Displayed 10 items.
- ML20073E568 (← links)
- 3F0698-17, Submits Results of Evaluation to NRC Re GL 87-02, Verification of Seismic Adequacy of Mechanical of Condenser & Electrical Equipment in Operating Reactors (USI A-46) for Evaluation of Condenser Hotwell Suction Isolation Valve (← links)
- 3F0398-16, Forwards Response to 980202 RAI Re Summary Rept on Resolution of USI A-46, Seismic Qualification of Equipment in Operating Npps. Confirmatory self-assessment of USI A-46 Resolutions Will Be Submitted,As Committed Previously (← links)
- 3F1297-24, Provides Supplemental Info to Support Util Response to NRC Request for Addl Info,Dtd 970128.Clarification to Util RAI Responses,Discussed During NRC Audit USI A-46 & Calculations Encl also.W/10 Oversize Drawings (← links)
- 3F0897-01, Forwards Response to RAI on Resolution of USI A-46,stating That Anchorage Calculations for Tanks & Heat Exchangers to Confirm Engineering Judgement of Anchorage Adequacy Will Be Completed Prior to Restart But No Later than 971201 (← links)
- 3F0497-11, Informs That Completion of Listed Corrective Actions Will Confirm That FPC Can Meet Design Basis for App R Requirements for Alternate Shutdown Capability (← links)
- 3F0397-28, Forwards Request for Addl Info Re Resolution of Unresolved Safety Issue A-46, Verification of Seismic Adequacy of Equipment in Operating Reactors USI A-46 (← links)
- 3F1295-18, Forwards Crystal River Unit 3 Seismic Evaluation Rept for USI A-46, Rev 0 (← links)
- 3F0994-06, Forwards Rev 1 to FPC Plant Specific Procedure for Seismic Verification of Nuclear Plant Equipment, to Fulfill Commitment in Attachment 1 to FPC Addressing USI A-46,as Required by GL 87-02 (← links)
- 3F0894-02, Provides Response to NRC Request for Addl Info Re Verification of Seismic Adequacy of Mechanical & Electrical Equipment in Operating Reactors,Unresolved Safety Issue,Per GL 87-02 (← links)