Pages that link to "29MOV-74"
← 29MOV-74
Jump to navigation
Jump to search
The following pages link to 29MOV-74:
Displayed 42 items.
- ML15007A150 (← links)
- ML12342A138 (← links)
- ML122750396 (← links)
- ML122710023 (← links)
- ML12116A290 (← links)
- ML16085A247 (← links)
- ML16081A192 (← links)
- JAFP-12-0134, Engineering Report, JAF-RPT-12-00015, Rev. 0, Jaf Seismic Walkdown Report for Resolution of Fukushima Near-Term Task Force Recommendation 2.3 Seismic, Book 1 of 3 (← links)
- ML101750146 (← links)
- ML101740486 (← links)
- ML18053A904 (← links)
- JAFP-18-0078, Fifth Ten-Year Interval Inservice Testing Program Plan (← links)
- RS-17-172, Commitments for Resolution of Anchor Darling Double Disc Gate Valve Part 21 Issues (← links)
- JAFP-07-0116, Fourth Interval Inservice Testing Program for Pumps and Valves (← links)
- ML19211A221 (← links)
- ML19294A783 (← links)
- ML051930227 (← links)
- ML051400356 (← links)
- ML19318C193 (← links)
- ML032461261 (← links)
- ML032460810 (← links)
- ML032390350 (← links)
- ML20070K222 (← links)
- ML20087K743 (← links)
- ML20094J242 (← links)
- ML20072A377 (← links)
- ML20071G926 (← links)
- ML20195E105 (← links)
- ML20236X383 (← links)
- JAFP-97-0357, Transmits Written Exams for 971103 Licensing Exam at Plant. Remaining Exam Matls Will Be Forwarded,Per Schedule Agreed Upon by D Florek & Je Morris (← links)
- L-86-024, Installation Procedure ML-86-024, Limitorque Valve Actuator Qualification Insp/Upgrades. Result Summary of Limitorque Control Wire Insps,Per IE Info Notice 86-003,encl (← links)
- JAFP-99-0175, Annual Summary of Changes,Tests & Experiments for 1997/1998. with (← links)
- JPN-94-057, Requests 6 Month Extension to Original Schedule Commitment for Completion of GL 89-10 Program Re safety-related MOV Testing & Surveillance Program (← links)
- JPN-97-019, Provides Summary of Detailed Evaluation of Postulated Scenarios Described in GL 96-06, Assurance of Equipment Operability & Containment Integrity During Design-Basis Accident Conditions & CA for JAFNPP IAW Ref Commitment (← links)
- JPN-97-003, Provides Required 120 Day Response to NRC GL-96-06, Assurance of Equipment Operability....Conditions, to Determine If Cacss Susceptible to Water Hammer or two-phase Flow Conditions During Postulated Accident Conditions (← links)
- JAFP-21-0022, Technical Requirements Manual Specifications - Redacted (← links)
- JAFP-92-0470, Ja Fitzpatrick Nuclear Power Plant Annual Summary of Changes,Tests & Experiments for 1990 (← links)
- JAFP-96-0064, Submits Evaluation Results for GL 95-07, Pressure Locking & Thermal Binding of Safety-Related Power-Operated Gate Valves (← links)
- ML20087G852 (← links)
- IR 05000333/2022004 (← links)
- ML23095A376 (← links)
- IR 05000333/2023002 (← links)