Pages that link to "1CAN010601, Supplement to Amendment Request, Revision of the Allowable Value for Emergency Feedwater Initiation and Control Function (EFIC)"
Jump to navigation
Jump to search
The following pages link to 1CAN010601, Supplement to Amendment Request, Revision of the Allowable Value for Emergency Feedwater Initiation and Control Function (EFIC):
Displayed 40 items.
- TAC:MC9437 (← links)
- ML060310519 (← links)
- ML060170321 (← links)
- ML060130639 (← links)
- 1CAN010601 (redirect page) (← links)
- ML060050448 (← links)
- 1CAN010606, Response to NRC Request Information Relating to Revision of Instrument Uncertainty Calculation Associated with the Emergency Feedwater Initiation and Control (EFIC) Steam Generator Level - Low Function (← links)
- 1CAN010601, Supplement to Amendment Request, Revision of the Allowable Value for Emergency Feedwater Initiation and Control Function (EFIC) (← links)
- ML060110060 (redirect page) (← links)
- ML060310519 (← links)
- ML060130639 (← links)
- L-16-308, Request for an Amendment to Revise Technical Specification 3.3.1. Reactor Protection System ≪Rps) Instrumentation. (← links)
- RS-16-172, Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.2 Path 2: GMRS ≪Sse with High Frequency Exceedances (← links)
- RS-16-085, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.2 Path 2: GMRS ≪Sse with High Frequency Exceedances (← links)
- RS-16-083, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.2 Path 2: GMRS ≪ SSE with High Frequency Exceedances (← links)
- NL-15-143, Request IP2-ISl-RR-19 for Relief from System Test Requirements for Large Bore(≫ 1 Inch), ASME Code Class 1 Reactor Coolant Pressure Boundary (Rcpb), Process, Drain, Test, and Flush Lines and Connections (← links)
- CNL-17-140, NEI 12-06, Appendix H, Revision 4, H.4.5 Path 5: GMRS ≫ 2 X SSE, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information (← links)
- CNS-17-042, Seismic Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.4 Path 4: GMRS ≪ 2xSSE (← links)
- RS-17-091, Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.4 Path 4: GMRS ≪ 2xSSE (← links)
- RS-17-093, Seismic Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 4, H.4.4 Path 4: GMRS ≪ 2xSSE (← links)
- MNS-17-035, Seismic Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.4 Path 4: GMRS ≪ 2xSSE (← links)
- NRC 2017-0040, Seismic Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Section H.4.4, Path 4: GMRS ≪ 2X SSE (← links)
- RS-16-169, Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.4 Path 4: GMRS ≪ 2xSSE (Partial Submittal - High Frequency Work Scope) (← links)
- RS-16-168, Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information NEI 12-06, Appendix H, Revision 2, H.4.2 Path 2: GMRS ≪ SSE with High Frequency Exceedances (← links)
- RS-16-086, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.2 Path 2: GMRS ≪ SSE with High Frequency Exceedances (← links)
- NL-17-1262, NEI 12-06, Rev. 4, Appendix H, H.4.4 Path 4: GMRS ≪ 2xSSE Mitigating Strategies Assessment (MSA) Report (← links)
- RS-18-099, NEI 12-06, Appendix H, Revision 4, H.4.5 Path 5: GMRS ≫ 2 X SSE, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information (← links)
- 1CAN010601, Supplement to Amendment Request, Revision of the Allowable Value for Emergency Feedwater Initiation and Control Function (Efic) (redirect page) (← links)
- 1CAN010601, Arkansas Nuclear One, Unit 1, Supplement to Amendment Request, Revision of the Allowable Value for Emergency Feedwater Initiation and Control Function (Efic) (redirect page) (← links)
- NRC-2018-0107, Federal Register Notice on Watts Bar Nuclear Plant, Units 1 and 2, License Amendment Application; Opportunity to Request a Hearing and to Petition for Leave to Intervene; Order Imposing Procedures [Docket Nos. 50-390 and 50-391; NRC-20 (← links)
- CNRO-2019-00010, Unit 1, River Bend, Unit 1, Waterford, Unit 3, Indian Point, Units 1, 2 & 3, Palisades, Big Rock - Nuclear Onsite Property Damage Insurance [10 CFR 50.54(w)(3)] (← links)
- NEI 12-06, NEI 12-06, Appendix H, Revision 4, H.4.5 Path 5: GMRS ≫ 2 X SSE, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information (← links)
- ML060050448 (← links)
- RC-18-0128, (Vcsns), Unit 1 - NEI 12-06, Appendix H, Revision 4, H.4.5. Path 5: GMRS ≫ 2X SSE, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information (← links)
- JAFP-17-0104, Seismic Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Revision 4, Appendix H, H.4.4 Path 4: GMRS ≪ 2xSSE (← links)
- SBK-L-17135, Seismic Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 4, H.4.4 Path 4: GMRS ≪ 2xSSE (← links)
- PLA-7551, Ne 12-06, Appendix H, Revision 2, H.4.3 Path 3: GMRS ≫ SSE ≪ IHS, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information (← links)
- RS-17-092, Seismic Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 4, H.4.4 Path 4: GMRS ≪ 2xSSE (← links)
- RS-16-170, Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.4 Path 4: GMRS ≪ 2xSSE (Partial Submittal - High Frequency Work Scope) (← links)
- BSEP 17-0069, Seismic Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.4 Path 4:GMRS ≪ 2xSSE (← links)
- L-2019-071, Response to Request for Additional Information (RAI} Set 10 Subsequent License Renewal Application Safety Review Requests (← links)
- 1CAN010605, Unit 1 Supplement to Amendment Request Response to Additional Questions Related to the Revision of the Allowable Value for Emergency Feedwater Initiation and Control Function (EFIC) (← links)
- W3F1-2016-0028, NEI 12-06, Appendix H, Revision 2, H.4.2 Path 2: GMRS ≪ SSE with High Frequency Exceedances, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information (← links)
- LR-N16-0142, Special Report 05000272/2016002-00, Pursuant to the Requirements of Technical Specification (TS) 3.3.3.1, Action 23, for the Containment Gaseous Activity Radiation Monitor (1R12A) Inoperable for >7 Days (← links)
- RS-16-084, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.2 Path 2: GMRS ≪ SSE with High Frequency Exceedances (← links)
- LR-N05-0342, Response to Request for Additional Information Regarding Amendment Request to Revise Technical Specification - Emergency Core Cooling Systems Tavg ≪ 350 F, Salem Generating Station - Unit 1 and Unit 2 (← links)
- NL-05-0732, Request for Relief from System Hydrostatic Test Requirements for Large Bore (≫ 1 Inch), ASME Code Class 1 Reactor Coolant Pressure Boundary (Rcpb), Process, Drain, Test, and Flush Lines and Connections (← links)
- LR-N05-0003, Request for Change to Technical Specifications Emergency Core Cooling Systems Tavg <335 Degrees F, (← links)