Pages that link to "1B21-F041D"
Jump to navigation
Jump to search
The following pages link to 1B21-F041D:
Displayed 39 items.
- RS-16-196, Redacted Clinton - Updated Safety Analysis Report (Usar), Revision 18, Appendix F - Fire Protection Safe Shutdown Analysis (← links)
- ML101340691 (← links)
- ML100710750 (← links)
- ML100710363 (← links)
- ML081620005 (← links)
- ML080710001 (← links)
- ML080600009 (← links)
- ML073190479 (← links)
- ML072250365 (← links)
- RS-14-207, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) (← links)
- RS-14-009, Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond Design-Basis External Events (Order No. EA-12-049) (← links)
- L-08-347, Eight Separate In-Service Testing Program 10 CFR 50.55a Alternatives Requests in Support of the Third Ten-Year Interval (← links)
- RS-07-121, Requests for Relief from ASME OM Code 5-year Test Interval for Safety Relief Valves (Relief Requests 2208 and 2209) (← links)
- L-18-104, 10 CFR 50.55a Requests in Support of the Fourth 10-Year In-Service Testing Interval (← links)
- L-11-082, Submittal of Inservice Testing Programs (← links)
- L-09-711, Response to Request for Additional Information Related to Inservice Testing Program Requests in Support of the Third Ten-Year Interval (← links)
- U-604457, Third Ten-Year Interval Inservice Testing Program Plan Revision 9 (← links)
- U-604359, Third Ten-Year Interval Lnservice Testing Program Plan, Revision 8 (← links)
- U-604326, Third Ten-Year Interval Inservice Testing Program Plan Revision 7 (← links)
- U-604262, Third Ten-Year Interval Inservice Testing Program Plan, Revision 6 (← links)
- U-603967, Submittal of Inservice Testing Program Plan for the Third Ten-Year Interval (← links)
- ML19241A188 (← links)
- ML070930364 (← links)
- ML20012A714 (← links)
- ML20029B187 (← links)
- L-19-257, Submittal of Perry Nuclear Power Plant Inservice Testing Programs (← links)
- U-604555, Fourth Ten-Year Interval Inservice Testing Program Plan Revision 0 (← links)
- ML21005A061 (← links)
- U-604633, Fourth Ten-Year Interval Inservice Testing Program Plan Revision 1 (← links)
- U-601164, Monthly Operating Rept for Mar 1988 (← links)
- U-600487, Rev 1 to Clinton Power Station Inservice Insp - Pump & Valve Testing Program (← links)
- U-600430, Forwards List of Seismic & Dynamic Qualification of Equipment,In Response to SER Outstanding Issue 7ii Identified by Sqrt During 850827-30 Visit (← links)
- U-604703, Fourth Ten-Year Interval Inservice Testing Program Plan Revision 2 (← links)
- U-600286, Forwards Sept 1985 Monthly Update of Seismic Qualification /Instrument Status by Sys/Equipment Number, Per Generic Open Item 5,850924 Sqrt Ltr & SER Outstanding Issue 7ii (← links)
- ML22216A216 (← links)
- ML21144A268 (← links)
- PY-CEI-NRR-1464, Annual Rept Jan-Dec 1991 Perry Nuclear Power Plant (← links)
- PY-CEI-NRR-1918, NPP,940101-1231 Annual Rept (← links)
- PY-CEI-NRR-1763, Jan-Dec 1993 Annual Rept. W/ (← links)