Pages that link to "05000483/LER-2017-002"
Jump to navigation
Jump to search
The following pages link to 05000483/LER-2017-002:
Displayed 50 items.
- 10 CFR 50.73(a)(2)(ii)(B), Unanalyzed Condition (← links)
- 10 CFR 50.73(a)(2)(v)(A), Loss of Safety Function - Shutdown the Reactor (← links)
- 10 CFR 50.73(a)(2)(vii), Common Cause Inoperability (← links)
- 10 CFR 50.73(a)(2)(i)(B), Prohibited by Technical Specifications (← links)
- 05000483/LER-2015-001 (← links)
- 05000483/LER-2015-003 (← links)
- 05000483/LER-2015-002 (← links)
- Main Steam Safety Valve (← links)
- 05000483/LER-2016-001 (← links)
- ENS 52905 (← links)
- ML17285A630 (redirect page) (← links)
- TS-3.7.1 (← links)
- TS-3.8.1 (← links)
- TS-3.7.5 (← links)
- 05000483/LER-2017-003 (← links)
- 05000483/LER-2017-001 (← links)
- IR 05000483/2018001 (← links)
- EPID:L-2018-LLL-0011 (← links)
- ML18106A705 (← links)
- ULNRC-06392, LER 17-002-00 for Callaway Plant, Unit 1, Regarding Inadequate Protection from Tornado Missiles Identified Due to Nonconforming Design (redirect page) (← links)
- ULNRC-06392 (redirect page) (← links)
- ULNRC-06142, SR-14-002 Callaway, Unit 1 - Special Report 2014-02-PAM Report Inoperability of Post Accident Monitoring (PAM) Instrument (← links)
- ULNRC-05991, Special Report 13-001-00 for Callaway, Unit 1, Inoperability of a Seismic Instrument for Greater than 30 Days (← links)
- ULNRC-05824, Special Report 2011-01 for Callway, Unit 1 Regarding Inoperability of a Seismic Instrument for Greater than 30 Days (← links)
- ULNRC-06414, Request to Extend Enforcement Discretion Provided in Enforcement Guidance Memorandum 15-002 for Tornado-Generated Missile Protection Non-Conformances Identified in Response to Regulatory Issue Summary 2015-06, Tornado ... (← links)
- ULNRC-06398, Special Report 2017-02: Non-Functional Seismic Instrument for Greater than 30 Days (← links)
- L-16-308, Request for an Amendment to Revise Technical Specification 3.3.1. Reactor Protection System ≪Rps) Instrumentation. (← links)
- RS-16-172, Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.2 Path 2: GMRS ≪Sse with High Frequency Exceedances (← links)
- RS-16-085, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.2 Path 2: GMRS ≪Sse with High Frequency Exceedances (← links)
- RS-16-083, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.2 Path 2: GMRS ≪ SSE with High Frequency Exceedances (← links)
- NL-15-143, Request IP2-ISl-RR-19 for Relief from System Test Requirements for Large Bore(≫ 1 Inch), ASME Code Class 1 Reactor Coolant Pressure Boundary (Rcpb), Process, Drain, Test, and Flush Lines and Connections (← links)
- ULNRC-06162, Special Report 2014-05 Inoperability of Loose Parts Monitoring Instrument for Greater than 30 Day (← links)
- ULNRC-05932, Special Report 2012-02 - Pam Report: Inoperability of a Post Accident Monitoring (PAM) Instrument for Greater than 30 Days (← links)
- CNL-17-140, NEI 12-06, Appendix H, Revision 4, H.4.5 Path 5: GMRS ≫ 2 X SSE, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information (← links)
- CNS-17-042, Seismic Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.4 Path 4: GMRS ≪ 2xSSE (← links)
- RS-17-091, Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.4 Path 4: GMRS ≪ 2xSSE (← links)
- RS-17-093, Seismic Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 4, H.4.4 Path 4: GMRS ≪ 2xSSE (← links)
- MNS-17-035, Seismic Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.4 Path 4: GMRS ≪ 2xSSE (← links)
- NRC 2017-0040, Seismic Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Section H.4.4, Path 4: GMRS ≪ 2X SSE (← links)
- RS-16-169, Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.4 Path 4: GMRS ≪ 2xSSE (Partial Submittal - High Frequency Work Scope) (← links)
- RS-16-168, Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information NEI 12-06, Appendix H, Revision 2, H.4.2 Path 2: GMRS ≪ SSE with High Frequency Exceedances (← links)
- RS-16-086, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information - NEI 12-06, Appendix H, Revision 2, H.4.2 Path 2: GMRS ≪ SSE with High Frequency Exceedances (← links)
- NL-17-1262, NEI 12-06, Rev. 4, Appendix H, H.4.4 Path 4: GMRS ≪ 2xSSE Mitigating Strategies Assessment (MSA) Report (← links)
- RS-18-099, NEI 12-06, Appendix H, Revision 4, H.4.5 Path 5: GMRS ≫ 2 X SSE, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information (← links)
- ULNRC-05374, Special Report 07-001 Re Historical Inoperability of Seismic Instrument SGAR0008 (← links)
- NEI 12-06, NEI 12-06, Appendix H, Revision 4, H.4.5 Path 5: GMRS ≫ 2 X SSE, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information (← links)
- JAFP-17-0104, Seismic Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Revision 4, Appendix H, H.4.4 Path 4: GMRS ≪ 2xSSE (← links)
- SBK-L-17135, Seismic Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 4, H.4.4 Path 4: GMRS ≪ 2xSSE (← links)
- PLA-7551, Ne 12-06, Appendix H, Revision 2, H.4.3 Path 3: GMRS ≫ SSE ≪ IHS, Mitigating Strategies Assessment (MSA) Report for the New Seismic Hazard Information (← links)
- ULNRC-05721, Special Report, Inoperable Channel 8 of the Loose Parts Monitoring System (Lpms) (← links)
- RS-17-092, Seismic Mitigating Strategies Assessment (MSA) Report for the Reevaluated Seismic Hazard Information - NEI 12-06, Appendix H, Revision 4, H.4.4 Path 4: GMRS ≪ 2xSSE (← links)