Pages that link to "05000348/LER-1979-059, Forwards LER 79-059/03L-0"
Jump to navigation
Jump to search
The following pages link to 05000348/LER-1979-059, Forwards LER 79-059/03L-0:
Displayed 9 items.
- ML19257A737 (redirect page) (← links)
- 05000348/LER-1979-059-03, /03L-0:on 791130,flow Path from Boric Acid Tank B Inoperable Due to Closed Outlet Valve.Caused by Operator Error.Valve Opened & Personnel Involved Received Training for Correct Procedure (← links)
- 05000348/LER-1979-059 (redirect page) (← links)
- 05000348/LER-1979-060-03, /03L-0:on 791202,while Moving from Mode 1 to 2, Containment Pressure Hi-1 & Hi-2 Trip Status Lights for One Channel Energized on Mcb W/Normal Readings on Containment Pressure Indicators.Caused by Comparator Card Failure (← links)
- 05000348/LER-1979-058-03, /03L-0:on 791121,boron Injection Tank Declared Inoperable Due to Low Concentration.Caused by Inadvertent Safety Injection.Concentration Increased by Batching (← links)
- 05000348/LER-1979-057-03, /03L-0:on 791122,steam Generator B Level Channel 486 Declared Inoperable Due to High Reading.Caused by Instruments Equalizing Valve Leaking.Valve Tightened,Tested & Returned to Operation (← links)
- 05000348/LER-1979-056-03, /03L-0:on 791108,20 Dysfunctional Fire Barrier Penetrations Found During QA Audit.Caused by Misinterpretation of Tech Specs by Plant Personnel. Inoperable Penetrations Repaired (← links)
- 05000348/LER-1979-044-01, /01T-0:on 791107,Westinghouse Notified Util That Potential Exists for P-4 Failures Not Being Identified During Tests.Caused by Automatic Self Test Circuits Not Checking P-4 Contacts (← links)
- 05000348/LER-1979-040-01, /01T-0:on 791011,wrong Valves Installed in Piping Sys.Caused by Deficiency in Original Plant Design Equipment Specs.Valves Being Replaced (← links)