Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- AEP-NRC-2015-22, Compliance with March 12, 2012, NRC Order Regarding Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) +
- CPSES-200601634, License Amendment Request (LAR) 06-009, Revision to Technical Specification (TS) 3.8.1, AC Sources - Operating, Extension of Completion Times for Diesel Generators +
- ET 05-0016, Response to Request for Additional Information Regarding Extensions of AC Electrical Power Distribution Completion Time +
- CNL-16-026, Completion of Required Action for Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) March 12, 2012 +
- L-PI-09-007, Responses to NRC Requests for Additional Information Dated December 24, 2008 Regarding Application for Renewed Operating Licenses +
- ML042930781 +
- DCL-09-093, License Amendment Request 09-07, Delayed Access Offsite Power Circuit Conformance with GDC 17 +
- ML083440696 +
- ML090390019 +
- ML13357A325 +
- RS-14-206, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) +
- ULNRC-05598, Proposed Revision to Technical Specification 5.5.16 Containment Leakage Rate Testing Program, (License Amendment Request LDCN 09-0008) +
- RS-14-205, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) +
- ML14010A343 +
- ML16012A145 +
- RS-15-017, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) +
- ML14349A320 +
- ML15069A232 +
- ML20094M380 +
- ML20140H579 +
- ML20106G410 +
- ML20138K521 +
- ML20116C981 +
- ML20133H496 +
- ML20155J900 +
- ML20155G517 +
- ML20091D275 +
- ML20198R306 +
- ML20101S038 +
- ML20207B420 +
- NL-04-2326, Response to Request for Additional Information Related to Request to Revise Service Water Intake Structure Exemption from Fire Protection Requirements at the Plant +
- ML023380536 +
- ML20214C337 +
- ML20246E091 +
- L-2003-286, Response to NRC RAI Regarding Station Blackout Analysis +
- ML20085J268 +
- ML050380385 +
- ML20198H321 +
- ML20216J935 +
- ML20151U081 +
- IA-86-669, Partial Response to FOIA Request for Info Re Generic Safety Issues & Gimcs.Forwards App C Document.App B & C Documents Available in PDR +
- ML20148Q746 +
- ML20211N632 +
- ML20100L072 +
- B12024, :Response to Info Requested Re Station Blackout, Technical Review +
- ST-HL-AE-5103, Submits Response to Questions from NRC Re Implementation of 10CFR50.63, Loss of All AC Power +
- ELV-02867, Forwards Responses to NRC Re Station Blackout.Sys Required to Function During Station Blackout Include, Auxiliary Feedwater Sys,Main Steam sys,RCS,post-accident Monitoring Sys & Class 1E Dc Sys +
- ST-HL-AE-5010, Forwards Revised Position Addressing Compliance of Plant W/ 10CFR50.63, Loss of All Alternating Current Power +
- ULNRC-05694, Application for Amendment to Facility Operating License NPF-30 Completion Time Extensions for TS 3.3.2 Engineered Safety Feature Actuation System (ESFAS) Instrumentation Functions TAC ME2822 (LDCN 09-0039) +
- ML031050019 +