Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML050910247 + (WNA-LI-00038-FPL-NP, Rev 1, Licensing Input for Deletion of Steam / Feedwater Flow Mismatch Reactor Trip)
- ML050910250 + (WNA-LI-00039-FPL-NP, Rev 1, Licensing Input for RPS Modifications Changing Reactor Trip on Turbine Trip Permissive from P-7 to P-8, Enclosure 1D)
- ML052570651 + (WNA-LI-00049-FPL-NP, Rev 0, Florida Power and Light Company Turkey Point Units 3 and 4 Supplemental Licensing Input for Deletion of Steam/Feewater Flow Mismatch Reactor Trip)
- ML110950333 + (WNA-LI-00058-WBT-NP, Rev. 3, Post-Accident Monitoring System (Pams) Licensing Technical Report)
- ML101870619 + (WNA-LI-00058-WBT-NP, Revion 0, Tennessee Valley Authority (TVA) Watts Bar Unit 2 (WBN2) Post-Accident Monitoring System (Pams) Licensing Technical Report)
- ML110620228 + (WNA-SD-00239-WBT-NP, Rev. 4, Nuclear Automation NSSS Completion Program I & C Projects Software Requirements Specification for the Post Accident Monitoring System, Attachments 16 & 17)
- ML11322A014 + (WNA-SD-00248-WBT-NP, Rev. 3, Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I &C Projects Software Design Description for the Post Accident Monitoring System Flat Panel Display)
- ML11322A015 + (WNA-SD-00250-WBT-NP, Rev. 3, Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I &C Projects Software Design Description for the Post Accident Monitoring System AC160 Software)
- ML11322A104 + (WNA-TP-02988-WBT-NP, Rev. 0, Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I & C Projects Post Accident Monitoring System Channel Integration Test/Factory Acceptance Test)
- ML11322A018 + (WNA-VR-00279-WBT-NP, Rev. 5, Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I & C Projects Requirements Traceability Matrix for the Post- Accident Monitoring System)
- ML12073A392 + (WNA-VR-00283-WBT-NP, Rev. 7, Nuclear Automation Watts Bar Unit 2 NSSS Completion Program I&C Projects Iv&V Summary Report for the Post Accident Monitoring System. Attachment 2)
- ML110770538 + (WNA-VR-00283-WBT-NP, Revision 4 Nuclear Automation Iv&V Summary Report for the Post Accident Monitoring System, Attachment 2, TVA Letter Dated March 16, 2011 Re Westinghouse Electric Company)
- GO2-96-046, WNP 2 Annual Operating Rept 1995 + (WNP 2 Annual Operating Rept 1995)
- ML020390362 + (WNP-1 - Order Extending Construction Completion Date)
- ML040490147 + (WNP-1 2003 Annual Financial Report)
- ML020280096 + (WNP-1 Environmental Assessment and Finding of No Significant Impact for Extension of Construction Permit (MB1804))
- GO2-98-075, WNP-2 1997 Annual Radiological Environ Operating Rept for 970101-1231 + (WNP-2 1997 Annual Radiological Environ Operating Rept for 970101-1231)
- GO2-99-041, WNP-2 1998 Annual Operating Rept. with + (WNP-2 1998 Annual Operating Rept. with)
- ML20212D367 + (WNP-2 Annual Operating Rept 1986)
- ML20196G532 + (WNP-2 Annual Operating Rept 1987)
- GO2-94-053, WNP-2 Annual Operating Rept 1993 + (WNP-2 Annual Operating Rept 1993)
- GO2-98-038, WNP-2 Annual Operating Rept for 1997 + (WNP-2 Annual Operating Rept for 1997)
- GO2-95-074, WNP-2 Annual Rept for Jan-Dec 1994 Radiological Environ Monitoring Program + (WNP-2 Annual Rept for Jan-Dec 1994 Radiological Environ Monitoring Program)
- ML20031B315 + (WNP-2 Class I-E Equipment List Seismic Qualification Info, Table 271.02-1)
- GO2-93-095, WNP-2 Cooling Water Blowdown Discharges,1992 + (WNP-2 Cooling Water Blowdown Discharges,1992)
- ML17292B359 + (WNP-2 Cycle 14 Reload Design Rept)
- ML17285B202 + (WNP-2 Cycle 6 Reload Summary Rept)
- ML17292A148 + (WNP-2 Emergency Preparedness Program Audit)
- ML17291A290 + (WNP-2 IPE Main Rept)
- ML17291A882 + (WNP-2 IPEEE Main Rept)
- ML17292B078 + (WNP-2 ISI Summary Rept for Refueling Outage RF12)
- ML17292A511 + (WNP-2 ISI Summary Rept for Refueling Outage RFO11)
- ML17291B018 + (WNP-2 ISI Summary Rept for Tenth Refueling Outage)
- ML17284A749 + (WNP-2 Inservice Insp Summary Rept for Refueling Outage RF13 Spring,1998)
- ML20262G819 + (WNP-2 Inservice Inspection Boundary Diagram Emergency Chilled Water (Cch))
- ML20262G657 + (WNP-2 Inservice Inspection Boundary Diagram Miscellaneous Containment Penetrations)
- ML20262G665 + (WNP-2 Inservice Inspection Boundary Diagram Reactor Core Isolation Cooling (RCIC))
- ML20262G661 + (WNP-2 Inservice Inspection Boundary Diagram Reactor Core Isolation Cooling (RCIC))
- ML20262G701 + (WNP-2 Inservice Inspection Boundary Diagram Reactor Water Clean Up (RWCU))
- ML20262G705 + (WNP-2 Inservice Inspection Boundary Diagram Reactor Water Clean Up (RWCU))
- ML20262G794 + (WNP-2 Inservice Inspection Boundary Diagram Main Steam (Ms) & Reactor Feedwater (RFW))
- ML20262G790 + (WNP-2 Inservice Inspection Boundary Diagram Main Steam (Ms) & Reactor Feedwater (RFW))
- ML20262G783 + (WNP-2 Inservice Inspection Boundary Diagram Main Steam (Ms) & Reactor Feedwater (RFW))
- ML20262G805 + (WNP-2 Inservice Inspection Boundary Diagram Main Steam (Ms) & Reactor Feedwater (RFW))
- ML20262G798 + (WNP-2 Inservice Inspection Boundary Diagram Main Steam (Ms) & Reactor Feedwater (RFW))
- ML20262G779 + (WNP-2 Inservice Inspection Boundary Diagram Control Rod Drive (CRD))
- ML20262G775 + (WNP-2 Inservice Inspection Boundary Diagram Fuel Pool Cooling (FPC))
- ML20262G768 + (WNP-2 Inservice Inspection Boundary Diagram Fuel Pool Cooling (FPC))
- ML20262G771 + (WNP-2 Inservice Inspection Boundary Diagram Fuel Pool Cooling (FPC))
- ML20262G754 + (WNP-2 Inservice Inspection Boundary Diagram Reactor Closed Cooling (RCC))
- ML20262G760 + (WNP-2 Inservice Inspection Boundary Diagram Reactor Closed Cooling (RCC))