Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ENS 55616 + (Unit 1 Automatic Scram)
- ML20265C519 + (Unit 1 Aux Bldg Area 10 Structural Steel Framing Plan - Floor El 166 Ft)
- ML20265C462 + (Unit 1 Aux Bldg Area 10 Structural Steel Framing Plan - Floor El 185 Ft)
- ML20265C598 + (Unit 1 Aux Bldg Area 10 Structural Steel Framing Plan Floor El 139 Ft)
- ML20265C109 + (Unit 1 Aux Bldg Area 10 Structural Steel Framing Plans, Roofs El 228 Ft & 266 Ft)
- ML20265C046 + (Unit 1 Aux Bldg Area 10 Structural Steel Framing Plan - Floor El 208 Ft 10 Inches)
- ML20265C496 + (Unit 1 Aux Bldg Area 7 Structural Steel Framing Roof Plan El 185 Ft)
- ML20265C647 + (Unit 1 Aux Bldg Area 8 Structural Steel Framing Plan - Floor El 139 Ft)
- ML20265C490 + (Unit 1 Aux Bldg Area 8 Structural Steel Roof Framing Plan El 185 Ft)
- ML20265C449 + (Unit 1 Aux Bldg Area 9 Structural Steel Framing Plan - Floor El 208 Ft 10 Inches)
- ML20265C085 + (Unit 1 Aux Bldg Area 9 Structural Steel Framing Plans, Roofs El 228 Ft & El 266 Ft)
- ML20265C614 + (Unit 1 Aux Bldg Area 9 Structural Steel Framing Plan - Floor El 139 Ft)
- ML20265C536 + (Unit 1 Aux Bldg Area 9 Structural Steel Framing Plan - Floor El 166 Ft)
- ML20265C141 + (Unit 1 Aux Bldg Area 9 Structural Steel Framing Plan - Floor El 245 Ft)
- ML20265C475 + (Unit 1 Aux Bldg Area 9 Structural Steel Framing Plan Floor El 185 Ft)
- ML20261F191 + (Unit 1 Aux Bldg:Conc Block Wall 1 El 83 Ft. Sheet 2 of 3)
- ML20261F187 + (Unit 1 Aux Bldg:Conc Block Wall 1.7 El 83 Ft. Sheet 1 of 3.No Revision Date)
- ML20261F169 + (Unit 1 Aux Bldg:Conc Block Wall 11.14 El 121 Ft. Sheet 7 of 11)
- ML20261F164 + (Unit 1 Aux Bldg:Conc Block Wall 11.14 El 121 Ft. Sheet 6 of 11.Date Illegible)
- ML20261F174 + (Unit 1 Aux Bldg:Conc Block Wall 8 El 121 Ft. Sheet 1 of 4)
- ML20261F177 + (Unit 1 Aux Bldg:Conc Block Wall 8 El 121 Ft. Sheet 2 of 4)
- ML20261F182 + (Unit 1 Aux Bldg:Conc Block Wall 8 El 121 Ft. Sheet 3 of 4)
- ML20265C688 + (Unit 1 Auxiliary Building Structural Steel Plans,Sections & Details)
- ML20265C655 + (Unit 1 Auxiliary Building Structural Steel Plans,Sections & Details)
- ML20260D066 + (Unit 1 Auxiliary One Line Diagram 480-Volt System MCC 1CA, 1CB,1PA,1PB & 1SA, as-built)
- ML20034E495 + (Unit 1 CDA Aerial Photgraphs)
- ML20034E497 + (Unit 1 CDA ITA 84311)
- ML19224B494 + (Unit 1 Chief Reactor Operator Log)
- ENS 49527 + (Unit 1 Commenced a Technical Specification Required Shutdown Due to Rcs Leakage)
- ENS 49300 + (Unit 1 Commenced a Ts Required Shutdown Due to Unidentified Rcs Leakage > 1 Gpm)
- 05000335/FIN-2007006-04 + (Unit 1 Compliance with Failure to Comply with the Requirements of the 10 CFR 50.63, SBO Rule)
- ML20262H489 + (Unit 1 Containment Concrete & Misc Steel Plan at El 135 Ft 4 Inches & 147 Ft 7 Inches)
- ML20266C571 + (Unit 1 Containment Cylinder Wall Penet Schedule Radiation Shielding Details)
- ML20266C574 + (Unit 1 Containment Cylinder Wall Pente Schedule & Radiation Shielding Details.Sheet 1 of 1)
- ML20266C582 + (Unit 1 Containment Drywell Wall Penet Sleeve Schedule & Details)
- ML20266C586 + (Unit 1 Containment Drywell Wall Penetrations Schedule & Shielding Details)
- ML20262H487 + (Unit 1 Containment Miscellaneous Steel Plan at El 114 Ft 6 Inches & El 120 Ft 10 Inches, as-built)
- ML20259D361 + (Unit 1 Containment Pool Swell Deflectors Plans,Sections & Details)
- 05000334/FIN-2015007-02 + (Unit 1 Control Room HVAC Equipment Room Safe Shutdown Capability Affected by Smoke Migration)
- ML13108A176 + (Unit 1 Core Operating Limits Report (Colr), Revision 22, Unit 2 Core Operating Limits Report (Colr), Revision 18 and Unit 3 Core Operating Limits Report (Colr), Revision 21)
- ML14188A259 + (Unit 1 Core Operating Limits Report (Colr), Revision 24, Unit 2 Core Operating Limits Report (Colr), Revision 20, Unit 3 Core Operating Limits Report (Colr), Revision 23)
- ML14009A140 + (Unit 1 Core Operating Limits Report (Colr), Revision 23, Unit 2 Core Operating Limits Report (Colr), Revision 19 & Unit 3 Core Operating Limits Report (Colr), Revision 22)
- ML22026A203 + (Unit 1 Core Operating Limits Report Revision 30, Unit 2 Core Operating Limits Report Revision 24, Unit 3 Core Operating Limits Report Revision 29)
- ML19204A193 + (Unit 1 Core Operating Limits Report Revision 27, Unit 2 Core Operating Limits Report Revision 22, Unit 3 Core Operating Limits Report Revision 25)
- ML23122A191 + (Unit 1 Core Operating Limits Report Revision 32, Unit 2 Core Operating Limits Report Revision 25, Unit 3 Core Operating Limits Report Revision 31)
- ML20113F035 + (Unit 1 Core Operating Limits Report Revision 28 Unit 2 Core Operating Limits Report Revision 23 Unit 3 Core Operating Limits Report Revision 27)
- ML22126A126 + (Unit 1 Core Operating Limits Report Revision 31)
- ML20085K931 + (Unit 1 Core Shroud Evaluation Based on B11OR1 Insp Results)
- 05000352/FIN-2018002-02 + (Unit 1 Core Spray Pump Failed to Start Resulting in Condition Prohibited by Technical Specifications)
- ML021920402 + (Unit 1 Cycle 10 Core Operating Limits Report (Colr), LaSalle Unit 1 Cycle 10, Plant Transient Analysis, Figures - References)
- ML021920384 + (Unit 1 Cycle 10 Core Operating Limits Report (Colr), Section 1, Table of Contents - List of Tables)