Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML16047A067 + (Transmittal of TR510, Revision 2, Evacuation Time Estimates and Associated 10 CFR 50.54(q) Review)
- RNP-RA/03-0061, Transmittal of TS Bases Revisions + (Transmittal of TS Bases Revisions)
- TSTF-09-10, Transmittal of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b, Sections 3.1.1 - 3.7.5 + (Transmittal of TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5b, Sections 3.1.1 - 3.7.5)
- TSTF-12-01, Transmittal of TSTF-454, Revision 2, Extend PCIV Completion Times (NEDC-33046) + (Transmittal of TSTF-454, Revision 2, Extend PCIV Completion Times (NEDC-33046))
- TSTF-05-03, Transmittal of TSTF-482, Revision 0, Correct LCO 3.0.6 Bases, for NRC Consideration + (Transmittal of TSTF-482, Revision 0, Correct LCO 3.0.6 Bases, for NRC Consideration)
- TSTF-05-18, Transmittal of TSTF-491, Revision 0, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications + (Transmittal of TSTF-491, Revision 0, Removal of Main Steam and Main Feedwater Valve Isolation Times from Technical Specifications)
- TSTF-10-07, Transmittal of TSTF-493, Revision 4, Errata, Clarify Application of Setpoint Methodology for LSSS Functions + (Transmittal of TSTF-493, Revision 4, Errata, Clarify Application of Setpoint Methodology for LSSS Functions)
- TSTF-08-19, Transmittal of TSTF-500, Revision 1, DC Electrical Rewrite - Update to TSTF-360 + (Transmittal of TSTF-500, Revision 1, DC Electrical Rewrite - Update to TSTF-360)
- TSTF-09-20, Transmittal of TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360 + (Transmittal of TSTF-500, Revision 2, DC Electrical Rewrite - Update to TSTF-360)
- TSTF-09-02, Transmittal of TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control + (Transmittal of TSTF-501, Revision 1, Relocate Stored Fuel Oil and Lube Oil Volume Values to Licensee Control)
- TSTF-08-10, Transmittal of TSTF-507, Revision 0, CLIIP Traveler to Increase Standardization + (Transmittal of TSTF-507, Revision 0, CLIIP Traveler to Increase Standardization)
- TSTF-09-08, Transmittal of TSTF-510, Revision 0, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection + (Transmittal of TSTF-510, Revision 0, Revision to Steam Generator Program Inspection Frequencies and Tube Sample Selection)
- TSTF-08-16, Transmittal of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26 + (Transmittal of TSTF-511, Revision 0, Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26)
- TSTF-08-18, Transmittal of TSTF-512, Revision 0, Revise SR 3.0.3 to Address SRs That Cannot Be Performed or Are Not Met + (Transmittal of TSTF-512, Revision 0, Revise SR 3.0.3 to Address SRs That Cannot Be Performed or Are Not Met)
- TSTF-08-21, Transmittal of TSTF-513, Revision 0, Revise Operability Requirements and Actions for RCS Leakage Instrumentation + (Transmittal of TSTF-513, Revision 0, Revise Operability Requirements and Actions for RCS Leakage Instrumentation)
- TSTF-09-03, Transmittal of TSTF-513, Revision 1, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation and TSTF-514, Revision 0, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation + (Transmittal of TSTF-513, Revision 1, Revise PWR Operability Requirements and Actions for RCS Leakage Instrumentation and TSTF-514, Revision 0, Revise BWR Operability Requirements and Actions for RCS Leakage Instrumentation)
- TSTF-09-01, Transmittal of TSTF-515, Revision 0, Revise Post-Accident Monitoring Instrumentation Based on Reg. Guide 1.97, Rev. 4 and NEDO-33349 + (Transmittal of TSTF-515, Revision 0, Revise Post-Accident Monitoring Instrumentation Based on Reg. Guide 1.97, Rev. 4 and NEDO-33349)
- TSTF-09-15, Transmittal of TSTF-517, Revision 0, Allowance for Non-TS Cooling / Ventilation Systems Degradation on Support System Operability and Associated Implementation Guidance + (Transmittal of TSTF-517, Revision 0, Allowance for Non-TS Cooling / Ventilation Systems Degradation on Support System Operability and Associated Implementation Guidance)
- TSTF-10-02, Transmittal of TSTF-521, Revision 0, Exclusion of Time Constants from Channel Operation Tests in Specifications 3.3.1 and 3.3.2 + (Transmittal of TSTF-521, Revision 0, Exclusion of Time Constants from Channel Operation Tests in Specifications 3.3.1 and 3.3.2)
- TSTF-10-04, Transmittal of TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month + (Transmittal of TSTF-522, Revision 0, Revise Ventilation System Surveillance Requirements to Operate for 10 Hours Per Month)
- TSTF-10-05, Transmittal of TSTF-523, Revision 0, Generic Letter 2008-01, Managing Gas Accumulation + (Transmittal of TSTF-523, Revision 0, Generic Letter 2008-01, Managing Gas Accumulation)
- TSTF-12-08, Transmittal of TSTF-523, Revision 1, Generic Letter 2008-01, Managing Gas Accumulation + (Transmittal of TSTF-523, Revision 1, Generic Letter 2008-01, Managing Gas Accumulation)
- TSTF-10-12, Transmittal of TSTF-525, Revision 0, Post Accident Monitoring Instrumentation Requirements (WCAP-15981-NP-A) + (Transmittal of TSTF-525, Revision 0, Post Accident Monitoring Instrumentation Requirements (WCAP-15981-NP-A))
- TSTF-11-15, Transmittal of TSTF-529, Revision 0, Clarify Use and Application Rules + (Transmittal of TSTF-529, Revision 0, Clarify Use and Application Rules)
- TSTF-13-03, Transmittal of TSTF-529, Revision 1, Clarify Use and Application Rules + (Transmittal of TSTF-529, Revision 1, Clarify Use and Application Rules)
- TSTF-14-02, Transmittal of TSTF-529, Revision 2, Clarify Use and Application Rules + (Transmittal of TSTF-529, Revision 2, Clarify Use and Application Rules)
- TSTF-11-12, Transmittal of TSTF-530, Revision 0, Clarify SR 3.0.3 to Be Consistent with Generic Letter 87-09 + (Transmittal of TSTF-530, Revision 0, Clarify SR 3.0.3 to Be Consistent with Generic Letter 87-09)
- TSTF-12-07, Transmittal of TSTF-531, Revision 0, Revision of Specification 3.8.1, Required Actions B.3.1 and B.3.2 + (Transmittal of TSTF-531, Revision 0, Revision of Specification 3.8.1, Required Actions B.3.1 and B.3.2)
- TSTF-11-14, Transmittal of TSTF-533-T, Revision 0, Remove COLR and PTLR Revision and Date Relocation Provisions Added by TSTF-363, -408, and -419 + (Transmittal of TSTF-533-T, Revision 0, Remove COLR and PTLR Revision and Date Relocation Provisions Added by TSTF-363, -408, and -419)
- TSTF-11-13, Transmittal of TSTF-534, Revision 0, Clarify Application of Pressure Boundary Leakage Definition + (Transmittal of TSTF-534, Revision 0, Clarify Application of Pressure Boundary Leakage Definition)
- TSTF-13-05, Transmittal of TSTF-536, Revision 0, Resolve CE Digital TS Inconsistencies Regarding CPCs and Ceacs + (Transmittal of TSTF-536, Revision 0, Resolve CE Digital TS Inconsistencies Regarding CPCs and Ceacs)
- TSTF-12-04, Transmittal of TSTF-537, Revision 0, Increase CIV Completion Time; Update of TSTF-373 + (Transmittal of TSTF-537, Revision 0, Increase CIV Completion Time; Update of TSTF-373)
- TSTF-12-06, Transmittal of TSTF-538, Revision 0, Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c + (Transmittal of TSTF-538, Revision 0, Add Actions to Preclude Entry Into LCO 3.0.3 - RITSTF Initiatives 6b & 6c)
- TSTF-12-11, Transmittal of TSTF-540, Revision 0, Provide Completion Times in Lieu of Immediate Shutdown (RITSTF Initiative 6) + (Transmittal of TSTF-540, Revision 0, Provide Completion Times in Lieu of Immediate Shutdown (RITSTF Initiative 6))
- TSTF-13-12, Transmittal of TSTF-541, Revision 0, Add Exceptions to Surveillance Requirements When the Safety Function Is Being Performed + (Transmittal of TSTF-541, Revision 0, Add Exceptions to Surveillance Requirements When the Safety Function Is Being Performed)
- TSTF-19-05, Transmittal of TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position + (Transmittal of TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position)
- TSTF-13-15, Transmittal of TSTF-542, Revision 0, Reactor Pressure Vessel Walter Inventory Control + (Transmittal of TSTF-542, Revision 0, Reactor Pressure Vessel Walter Inventory Control)
- TSTF-13-09, Transmittal of TSTF-545, Revision 0, TS Inservice Testing (IST) Program Removal + (Transmittal of TSTF-545, Revision 0, TS Inservice Testing (IST) Program Removal)
- TSTF-14-05, Transmittal of TSTF-545, Revision 1, TS Inservice Testing Program Removal + (Transmittal of TSTF-545, Revision 1, TS Inservice Testing Program Removal)
- TSTF-15-06, Transmittal of TSTF-546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement + (Transmittal of TSTF-546, Revision 0, Revise APRM Channel Adjustment Surveillance Requirement)
- TSTF-14-06, Transmittal of TSTF-547, Revision 0, Clarification of Rod Position Requirements + (Transmittal of TSTF-547, Revision 0, Clarification of Rod Position Requirements)
- TSTF-14-18, Transmittal of TSTF-551, Revision 0, Address Transient Secondary Containment Conditions + (Transmittal of TSTF-551, Revision 0, Address Transient Secondary Containment Conditions)
- TSTF-15-07, Transmittal of TSTF-551, Revision 1, Revise Secondary Containment Surveillance Requirements + (Transmittal of TSTF-551, Revision 1, Revise Secondary Containment Surveillance Requirements)
- TSTF-17-17, Transmittal of TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program + (Transmittal of TSTF-557, Revision 1, Spent Fuel Storage Rack Neutron Absorber Monitoring Program)
- TSTF-17-07, Transmittal of TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program + (Transmittal of TSTF-563, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program)
- TSTF-18-03, Transmittal of TSTF-565, Revision 1, Revise the LCO 3.0.2 and LCO 3.0.3 Bases + (Transmittal of TSTF-565, Revision 1, Revise the LCO 3.0.2 and LCO 3.0.3 Bases)
- TSTF-17-18, Transmittal of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems + (Transmittal of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems)
- TSTF-21-01, Transmittal of TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling + (Transmittal of TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling)
- TSTF-22-03, Transmittal of TSTF-584, Revision 0, Eliminate Automatic RWCU System Isolation on SLC Initiation + (Transmittal of TSTF-584, Revision 0, Eliminate Automatic RWCU System Isolation on SLC Initiation)
- ML25066A098 + (Transmittal of TSTF-585, Revision 4, Revise LCO 3.0.3 to Require Managing Risk)
- TSTF-22-07, Transmittal of TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements + (Transmittal of TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements)