Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Task Action Plan: BWR Control Rod Drive Mechanical Failures". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML19344D721  + (Task 5-Natl Waste Package Program)
  • ML19221A430  + (Task 6B: Reactor Coolant Pressure Control Sys Design Ctriteria-Makeup Portion, Revision 3)
  • ML19221A337  + (Task 6a:Assessment of Core Integrity)
  • ML19221A616  + (Task 6b:Current Assessment of Core Status,b-Sequence of Events)
  • ML20134J993  + (Task 8.4 Ltr Rept Summary of Subject Matter Expert Panel Meeting)
  • ML19290C301  + (Task A-36 Status Control of Heavy Loads. Supporting Documentation Encl)
  • ML19294C187  + (Task Action Plan A-03:Westinghouse Steam Generator Tube Integrity, Revision 1)
  • ML19263F259  + (Task Action Plan A-10,Revision 1: BWR Feedwater Nozzle & BWR Control Rod Drive Return Line Nozzle Cracking)
  • ML19291C144  + (Task Action Plan A-11: Reactor Vessel Matls Toughness, Revision 2)
  • ML19260C442  + (Task Action Plan A-1: Water Hammer, Revision 1.Scope of Work Encl)
  • ML20125D388  + (Task Action Plan A-28: Increase in Spent Fuel Pool Storage Capacity, Revision 1)
  • ML19322C240  + (Task Action Plan A-34: Instruments for Monitoring Radiation & Process Variables During Accidents)
  • ML20197C397  + (Task Action Plan A-38,Tornado Missiles.Problem:To Define Objects That Can Be Lifted & Thrown,Their Velocities & Effects Upon Impact)
  • ML19211C155  + (Task Action Plan A-42: Pipe Cracks in Bwrs)
  • ML19339A222  + (Task Action Plan A-44: Station Blackout)
  • ML20054E292  + (Task Action Plan A-49: Pressurized Thermal Shock)
  • ML19294C194  + (Task Action Plan A-4: C-E Steam Generator Tube Integrity, Revision 1)
  • ML19330B919  + (Task Action Plan A-8: Mark II Containment Pool Dynamic Loads, Revision 3)
  • ML19211C824  + (Task Action Plan A-9,Revision 1)
  • ML19291C056  + (Task Action Plan B-06: Loads,Load Combinations & Stress Limits)
  • ML19211C701  + (Task Action Plan B-32: Ice Effects on Safety-Related Water Supplies)
  • ML19211C690  + (Task Action Plan B-66: Control Room Infiltration Measurements)
  • ML19284F127  + (Task Action Plan for Resolution of Generic Issue 93, Steam Binding of Auxiliary Feedwater Pumps)
  • ML19269C831  + (Task Action Plan for Steam Effects on BWR Core Spray Distribution)
  • ML19263C292  + (Task Action Plan for Steam Effects on BWR Core Spray Distribution,Revision 1)
  • ML19257B069  + (Task Action Plan: BWR Control Rod Drive Mechanical Failures)
  • ML19211C706  + (Task Action Plan: Health Effects & Life Shortening from U & Coal Fuel Cycles, from Task A-20, Impacts of Coal Fuel Cycle)
  • ML20093K404  + (Task Action Plans for Unresolved Safety Issues Related to Nuclear Power Plants)
  • ML19305C005  + (Task Action Plans for Unresolved Safety Issues Related to Nuclear Power Plants)
  • ML20077R675  + (Task Analysis of Nuclear Power Plant Control Room Crews. Volume 1:Project Approach and Methodology)
  • ML20111B078  + (Task Analysis of Nuclear Power Plant Control Room Crews. Volume 3:Task Data Forms)
  • ML20111B064  + (Task Analysis of Nuclear Power Plant Control Room Crews. Volume 3:Task Data Forms)
  • ML20078F426  + (Task Analysis of Nuclear Power Plant Control Room Crews. Volume 2:Data Results)
  • ML19221A447  + (Task Close Out Document Forwarding Review of Sandia/Nrc Emergency Containment Vent Design Package)
  • ML19212A242  + (Task Close Out Document,Simulation of Fire in Containment - Sys Capabilities - Sys Response)
  • ML19275A151  + (Task Close Out Documents,Tasks 11-3,11-4,IA-28,25-C,26-B,32, 1,37,48,IA-26-a Addendums 1 & 2,38,26-C,34,39,11,IA-33,46, 43,41,40,47,44,42,7 & 11-10)
  • ML20028F963  + (Task Description of Nuclear Power Plant Siting.Pp 5-9)
  • ML20126D629  + (Task Force Action Plan & Procedures for Installation Verification)
  • ML20049J037  + (Task Force Report on the Agreement States Program)
  • ML19344F216  + (Task Force Rept on Interim Operation of Indian Point)
  • ML20235W768  + (Task Force Rept on Systematic Evaluation of Operating Nuclear Power Plants)
  • ML20236S881  + (Task Force Review of Equipment & Maint History for Lacrosse)
  • ML17199S870  + (Task Force Review of Equipment Performance for Dresden Rept)
  • ML20138R277  + (Task Force Review of Operational History for DC Cook Units 1 & 2)
  • ML20155K504  + (Task Force Review of Operational History for Palisades, Final Rept)
  • ML20137B195  + (Task Force Review of Operational History for LaSalle County Station,Units 1 & 2, Final Rept)
  • ML19212A430  + (Task Initiation Form to Inst Review Board in Response to NDT Mgt Association 780719 Petition.Preliminary Value/Impact Statement & Page 1 Schedule Network Indicates Recommendation to Deny Petition)
  • ML12177A430  + (Task Interface Agreement (Concurrence)-Operability of Brunswick, Unit 2, Reactor Water Cleanup System Isolation Instrumentation with the Inlet Flow Orifice Installed Backwards (TIA 2012-09))
  • ML023290377  + (Task Interface Agreement (TIA 2001-15) Evaluation of Containment Structure Conformance to Design-Basis Requirement)
  • ML040160210  + (Task Interface Agreement (TIA 2003-05); NRC Policy Questions on Technical Specification Adequacy and Related Technical Specification Operability)
  • ML051160420  + (Task Interface Agreement (TIA 2005-003) Related to the Operability and Validity of the Local Leak Rate Testing of the Main Steam Isolation Valves - Plant Edwin I. Hatch)