Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20038A774 + (Task 3:Development of Low Level Waste Form Criteria Testing of Low Level Waste Forms, Informal Rept)
- ML19221A622 + (Task 46:Use of Core Flood Tank to Aid Reflow Boiler Cooling Techniques)
- ML19221A474 + (Task 4: Behavior of RCS W/Steam Generators in Condensing Mode)
- SECY-08-0171, Task 5 of SECY-08-0171. Please Share This Email on Reg Perf Metric with the Participants of the Monday Afternoons Call + (Task 5 of SECY-08-0171. Please Share This Email on Reg Perf Metric with the Participants of the Monday Afternoons Call)
- ML19344D721 + (Task 5-Natl Waste Package Program)
- ML19221A430 + (Task 6B: Reactor Coolant Pressure Control Sys Design Ctriteria-Makeup Portion, Revision 3)
- ML19221A337 + (Task 6a:Assessment of Core Integrity)
- ML19221A616 + (Task 6b:Current Assessment of Core Status,b-Sequence of Events)
- ML20134J993 + (Task 8.4 Ltr Rept Summary of Subject Matter Expert Panel Meeting)
- ML19290C301 + (Task A-36 Status Control of Heavy Loads. Supporting Documentation Encl)
- ML19294C187 + (Task Action Plan A-03:Westinghouse Steam Generator Tube Integrity, Revision 1)
- ML19263F259 + (Task Action Plan A-10,Revision 1: BWR Feedwater Nozzle & BWR Control Rod Drive Return Line Nozzle Cracking)
- ML19291C144 + (Task Action Plan A-11: Reactor Vessel Matls Toughness, Revision 2)
- ML19260C442 + (Task Action Plan A-1: Water Hammer, Revision 1.Scope of Work Encl)
- ML20125D388 + (Task Action Plan A-28: Increase in Spent Fuel Pool Storage Capacity, Revision 1)
- ML19322C240 + (Task Action Plan A-34: Instruments for Monitoring Radiation & Process Variables During Accidents)
- ML20197C397 + (Task Action Plan A-38,Tornado Missiles.Problem:To Define Objects That Can Be Lifted & Thrown,Their Velocities & Effects Upon Impact)
- ML19211C155 + (Task Action Plan A-42: Pipe Cracks in Bwrs)
- ML19339A222 + (Task Action Plan A-44: Station Blackout)
- ML20054E292 + (Task Action Plan A-49: Pressurized Thermal Shock)
- ML19294C194 + (Task Action Plan A-4: C-E Steam Generator Tube Integrity, Revision 1)
- ML19330B919 + (Task Action Plan A-8: Mark II Containment Pool Dynamic Loads, Revision 3)
- ML19211C824 + (Task Action Plan A-9,Revision 1)
- ML19291C056 + (Task Action Plan B-06: Loads,Load Combinations & Stress Limits)
- ML19211C701 + (Task Action Plan B-32: Ice Effects on Safety-Related Water Supplies)
- ML19211C690 + (Task Action Plan B-66: Control Room Infiltration Measurements)
- ML19284F127 + (Task Action Plan for Resolution of Generic Issue 93, Steam Binding of Auxiliary Feedwater Pumps)
- ML19269C831 + (Task Action Plan for Steam Effects on BWR Core Spray Distribution)
- ML19263C292 + (Task Action Plan for Steam Effects on BWR Core Spray Distribution,Revision 1)
- ML19257B069 + (Task Action Plan: BWR Control Rod Drive Mechanical Failures)
- ML19211C706 + (Task Action Plan: Health Effects & Life Shortening from U & Coal Fuel Cycles, from Task A-20, Impacts of Coal Fuel Cycle)
- ML20093K404 + (Task Action Plans for Unresolved Safety Issues Related to Nuclear Power Plants)
- ML19305C005 + (Task Action Plans for Unresolved Safety Issues Related to Nuclear Power Plants)
- ML20077R675 + (Task Analysis of Nuclear Power Plant Control Room Crews. Volume 1:Project Approach and Methodology)
- ML20111B078 + (Task Analysis of Nuclear Power Plant Control Room Crews. Volume 3:Task Data Forms)
- ML20111B064 + (Task Analysis of Nuclear Power Plant Control Room Crews. Volume 3:Task Data Forms)
- ML20078F426 + (Task Analysis of Nuclear Power Plant Control Room Crews. Volume 2:Data Results)
- ML19221A447 + (Task Close Out Document Forwarding Review of Sandia/Nrc Emergency Containment Vent Design Package)
- ML19212A242 + (Task Close Out Document,Simulation of Fire in Containment - Sys Capabilities - Sys Response)
- ML19275A151 + (Task Close Out Documents,Tasks 11-3,11-4,IA-28,25-C,26-B,32, 1,37,48,IA-26-a Addendums 1 & 2,38,26-C,34,39,11,IA-33,46, 43,41,40,47,44,42,7 & 11-10)
- ML20028F963 + (Task Description of Nuclear Power Plant Siting.Pp 5-9)
- ML20126D629 + (Task Force Action Plan & Procedures for Installation Verification)
- ML20049J037 + (Task Force Report on the Agreement States Program)
- ML19344F216 + (Task Force Rept on Interim Operation of Indian Point)
- ML20235W768 + (Task Force Rept on Systematic Evaluation of Operating Nuclear Power Plants)
- ML20236S881 + (Task Force Review of Equipment & Maint History for Lacrosse)
- ML17199S870 + (Task Force Review of Equipment Performance for Dresden Rept)
- ML20138R277 + (Task Force Review of Operational History for DC Cook Units 1 & 2)
- ML20155K504 + (Task Force Review of Operational History for Palisades, Final Rept)
- ML20137B195 + (Task Force Review of Operational History for LaSalle County Station,Units 1 & 2, Final Rept)
- ML19212A430 + (Task Initiation Form to Inst Review Board in Response to NDT Mgt Association 780719 Petition.Preliminary Value/Impact Statement & Page 1 Schedule Network Indicates Recommendation to Deny Petition)