Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML25251A240 + (TSTF-596, Revision 2, Expand the Applicability of the Surveillance Frequency Control Program (SFCP) with Corrected Model Application)
- EPID:L-2025-LLA-0024 + (TSTF-597)
- EPID:L-2025-LLA-0095 + (TSTF-597)
- EPID:L-2025-LLA-0134 + (TSTF-597)
- ML24114A265 + (TSTF-597 Acceptance Review Letter)
- ML24358A226 + (TSTF-597 Cover Letter for Final Traveler SE)
- EPID:L-2024-LRM-0021 + (TSTF-505)
- EPID:L-2024-PMP-0000 + (TSTF-599)
- EPID:L-2025-LLA-0125 + (TSTF-599)
- EPID:L-2025-LLA-0135 + (TSTF-599)
- ML24114A257 + (TSTF-599 Acceptance Review Letter)
- EPID:L-2024-PMP-0005 + (TSTF-600)
- EPID:L-2024-PMP-0003 + (TSTF-600)
- ML24172A054 + (TSTF-600 Acceptance Review Letter TSTF-600, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency)
- ML25247A239 + (TSTF-600 Cover Letter for Final Traveler SE (ML24247A239))
- ML25247A238 + (TSTF-600, Rev. 2, Final SE, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency)
- PMNS20240191, TSTF-600, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency, Pre-submittal Meeting + (TSTF-600, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency, Pre-submittal Meeting)
- EPID:L-2024-PMP-0007 + (TSTF-601)
- ML25247A258 + (TSTF-601 Cover Letter for Final Traveler SE (ML25247A258))
- ML24207A182 + (TSTF-601, Extend Shield Building Completion Time After Refueling, Acceptance Review Letter)
- EPID:L-2024-PMP-0011 + (TSTF-602)
- ML24222A400 + (TSTF-602, Revise the Ventilation Filter Testing Program to Permit Alternate Challenge Agents, Acceptance Review Letter)
- EPID:L-2022-LLA-0148 + (TSTF-95)
- TSTF-05-17, TSTF-IG-05-02, Implementation Guidance for TSTF-423, Revision 0, Technical Specifications End States, NEDC-32988-A + (TSTF-IG-05-02, Implementation Guidance for TSTF-423, Revision 0, Technical Specifications End States, NEDC-32988-A)
- TSTF-07-15, TSTF-IG-07-01, Implementation Guidance TSTF-431, Revision 1, Change in Technical Specifications End States (BAW-2441) + (TSTF-IG-07-01, Implementation Guidance TSTF-431, Revision 1, Change in Technical Specifications End States (BAW-2441))
- EPID:L-2018-LLA-0567 + (TSTF505)
- ML19253A963 + (TSTF505 LAR Audit Summary)
- ML030650901 + (TSs Pages Amendments 254 & 134)
- ML031490373 + (TSs Proposed Change No. 259, Supplement No. 1, Instrumentation TSs)
- ML20217P606 + (TSs for GE Nuclear Test Reactor)
- ML19081A131 + (TTC Source Purchase Quote)
- ML19078A321 + (TTC Source Purchase Request Support Letter)
- ML22077A048 + (TTL, Inc., CY2022 Change Reciprocity Request Dated March 17, 2022, Albany (461692))
- ML20095C469 + (TU Electric Answer to Application for Hearings & Oral Argument by M Dow & SL Dow.* Concludes That NRC Should Deny Application for Oral Argument & Hearings on Petition to Intervene & Motion to Reopen.W/Certificate of Svc)
- ML20099J875 + (TU Electric Answer to Petition for Intervention & Request for Hearings by Dows.* Petition to Intervene Should Not Be Accepted for Filing Because Petition Contains Untrue & Scandalous Allegations.Certificate of Svc & Other Info Encl)
- ML20094K416 + (TU Electric Answer to Petition to Intervene & Motion & Supplemental Motion to Reopen by M Dow & SL Dow & TU Electric Request for Admonition of Dows.* Concludes That Motion Should Be Dismissed.W/Certificate of Svc)
- ML20099H107 + (TU Electric Answer to Petition to Intervene & Request for Hearing of Bi Orr,Di Orr,Jj Macktal & SMA Hasan.* Petition Should Be Denied Re Macktal & Hasan Since Neither Showed Standing to Intervene.W/Notices & Certificate of Svc)
- ML20115J149 + (TU Electric Answer to Supplemental Petition to Intervene & Request for Hearing of Bi Orr,Di Orr,Jj Macktal & & SMA Hasan.* W/Certificate of Svc)
- ML20127G944 + (TU Electric Brief in Opposition to Petitioners Appeal of ASLB Memorandum & Order.* Requests That Petitioners Appeal Be Denied & Licensing Board 921215 Memorandum & Order Be Affirmed.W/Certificate of Svc)
- ML20073H580 + (TU Electric Comanche Peak Steam Electric Station Radiological Environ Monitoring Program 1990 Annual Rept)
- ML20073H585 + (TU Electric Comanche Peak Steam Electric Station Radiological Environ Monitoring Program 1988 Annual Rept)
- ML20073H591 + (TU Electric Comanche Peak Steam Electric Station Radiological Environ Monitoring Program 1989 Annual Rept)
- TXX-9709, TU Electric Cpes 1996 Annual Radiological Environ Operating Rept. W/Two Oversize Drawings & + (TU Electric Cpes 1996 Annual Radiological Environ Operating Rept. W/Two Oversize Drawings &)
- ML20116M459 + (TU Electric Opposition to Motion for Rehearing by RM Dow.* RM Dow 921110 Motion for Rehearing Should Be Denied.W/ Certificate of Svc)
- ML20034G738 + (TU Electric Response to Cfur Request for Hearing & Leave to Intervene.* Cfur 930219 Request Should Be Rejected Since No Proceeding Currently Exists for Which Hearing on Late Filed Contention Can Be Granted.W/Certificate of Svc)
- TXX-2923, TU Submits Proof of Svc for Copies of Amend 3 to FSAR + (TU Submits Proof of Svc for Copies of Amend 3 to FSAR)