Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML23206A124 + (TSTF-584 Cover Letter for Final SE)
- EPID:L-2023-PMP-0000 + (TSTF-585)
- ML25219A024 + (TSTF-585 Final RAIs)
- ML21109A141 + (TSTF-585 Rev. 0 Revise LCO 3.0.3)
- ML24016A270 + (TSTF-585, Draft Revision 3, Revise LCO 3.0.3 to Require Managing Risk)
- EPID:L-2022-PMP-0000 + (TSTF-589)
- EPID:L-2024-LLA-0022 + (TSTF-589)
- EPID:L-2024-LLA-0090 + (TSTF-589)
- EPID:L-2024-LLA-0153 + (TSTF-589)
- EPID:L-2025-LLA-0023 + (TSTF-589)
- ML23241B051 + (TSTF-589 Final SEs (Eliminate Automatic Diesel Generator Start During Shutdown))
- EPID:L-2022-PMP-0003 + (TSTF-591)
- EPID:L-2023-LLM-0098 + (TSTF-591)
- EPID:L-2024-LLA-0061 + (TSTF-591)
- EPID:L-2024-LLA-0023 + (TSTF-591)
- EPID:L-2024-LLA-0122 + (TSTF-591)
- EPID:L-2024-LLA-0165 + (TSTF-591)
- EPID:L-2024-LLA-0145 + (TSTF-591)
- EPID:L-2024-LLA-0034 + (TSTF-591)
- EPID:L-2024-LLA-0069 + (TSTF-505)
- EPID:L-2024-LRM-0021 + (TSTF-505)
- EPID:L-2024-LLA-0132 + (TSTF-592)
- EPID:L-2024-LLA-0133 + (TSTF-592)
- ML24029A147 + (TSTF-592 Cover Letter for Final SE of TSTF-592)
- TSTF-23-08, TSTF-592, Revision 2, Revise Automatic Depressurization System (ADS) Instrumentation Requirements Correction + (TSTF-592, Revision 2, Revise Automatic Depressurization System (ADS) Instrumentation Requirements Correction)
- EPID:L-2025-LLA-0077 + (TSTF-596)
- ML24362A055 + (TSTF-596 Cover Letter for Final Traveler SE)
- ML24262A113 + (TSTF-596 Rev 1 Expand the Applicability of the Surveillance Frequency Control Program (SFCP) Additional Corrections Needed)
- ML25251A241 + (TSTF-596, Rev. 2, Expand the Applicability of the Surveillance Frequency Control Program (SFCP))
- TSTF-24-10, TSTF-596, Revision 2, Expand the Applicability of the Surveillance Frequency Control Program (SFCP) + (TSTF-596, Revision 2, Expand the Applicability of the Surveillance Frequency Control Program (SFCP))
- ML25251A240 + (TSTF-596, Revision 2, Expand the Applicability of the Surveillance Frequency Control Program (SFCP) with Corrected Model Application)
- EPID:L-2025-LLA-0024 + (TSTF-597)
- EPID:L-2025-LLA-0095 + (TSTF-597)
- EPID:L-2025-LLA-0134 + (TSTF-597)
- ML24114A265 + (TSTF-597 Acceptance Review Letter)
- ML24358A226 + (TSTF-597 Cover Letter for Final Traveler SE)
- EPID:L-2024-LRM-0021 + (TSTF-505)
- EPID:L-2024-PMP-0000 + (TSTF-599)
- EPID:L-2025-LLA-0125 + (TSTF-599)
- EPID:L-2025-LLA-0135 + (TSTF-599)
- ML24114A257 + (TSTF-599 Acceptance Review Letter)
- EPID:L-2024-PMP-0005 + (TSTF-600)
- EPID:L-2024-PMP-0003 + (TSTF-600)
- ML24172A054 + (TSTF-600 Acceptance Review Letter TSTF-600, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency)
- ML25247A239 + (TSTF-600 Cover Letter for Final Traveler SE (ML24247A239))
- ML25247A238 + (TSTF-600, Rev. 2, Final SE, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency)
- PMNS20240191, TSTF-600, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency, Pre-submittal Meeting + (TSTF-600, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency, Pre-submittal Meeting)
- EPID:L-2024-PMP-0007 + (TSTF-601)
- ML25247A258 + (TSTF-601 Cover Letter for Final Traveler SE (ML25247A258))
- ML24207A182 + (TSTF-601, Extend Shield Building Completion Time After Refueling, Acceptance Review Letter)
- EPID:L-2024-PMP-0011 + (TSTF-602)