Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML15344A392 + (TSD-14-015, Revision 0, Buried Piping Dose Modeling & Dcgls)
- ML16211A375 + (TSD-14-017 Rev. 0, BNL Report - Sorption (Kd) Measurements on Cinder Block and Grout in Support of Dose Assessments for Zion Nuclear Station Decommissioning)
- ML15344A385 + (TSD-14-017, Revision 0, BNL Report - Sorption (Kd) Measurements on Cinder Block and Grout in Support of Dose Assessments for Zion Nuclear Station Decommissioning)
- ML16211A376 + (TSD-14-019 Rev. 1, Radionuclides of Concern for Soil and Basement Fill Model Source Terms)
- ML15344A386 + (TSD-14-019, Revision 0, Radionuclides of Concern for Soil and Basement Fill Model Source Terms)
- ML16211A377 + (TSD-14-020 Rev. 0, Sorption (Kd) Measurements in Support of Dose Assessments for Zion Nuclear Station Decommissioning)
- ML16211A378 + (TSD-14-021 Rev. 1, Bfm Drilling Spoils and Alternate Exposure Scenarios)
- ML15344A393 + (TSD-14-021 Revision 0, Bfm Drilling Spoils and Alternate Exposure Scenarios)
- ZS-2015-0160, TSD-14-028, Rev 0 - Radiological Characterization Report + (TSD-14-028, Rev 0 - Radiological Characterization Report)
- ML16211A379 + (TSD-14-031 Rev. 1, Brookhaven National Laboratory: Evaluation of Maximum Radionuclide Groundwater Concentrations for Basement Fill Model)
- ML17129A327 + (TSD-14-031, Rev. 0 - BNL, Basement Fill Model Eval of Max Radionuclide Concentrations for Initial Suite of Radionuclides)
- ML15344A394 + (TSD-14-032, Revision 0, Conestoga-Rovers Report: Simulation of the Post-Demolition Saturation of Foundation Fill Using a Foundation Water Flow Model)
- ML18052A539 + (TSD-17-004, Rev 3, Operational Derived Concentration Guideline Levels for Final Status Survey)
- ML18052A541 + (TSD-17-010, Rev 1, Final Report - Unconditional Release Surveys at Zion Station Restoration Project. TOC Thru Attachment 1)
- ML18086A006 + (TSD-17-010, Rev 1, Final Report - Unconditional Release Surveys at Zion Station Restoration Project. Attachment 2)
- ML21180A204 + (TSG Hardship Request with Att 1 Flowchart)
- ML102861973 + (TSIF-523 Presentation, Development of TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation)
- ML22276A208 + (TSTF - 505 Amendments Package)
- ML003683642 + (TSTF -076, R.1 and Numerous Other TSTFs - Disposition Letter to Mr. James Davis of NEI Dated 2/16/2000)
- EPID:L-2023-LLA-0121 + (TSTF 264)
- EPID:L-2021-LLA-0138 + (TSTF 273)
- ML003683442 + (TSTF 358 and 359 Letter to Mr. James Davis Dated February 14, 2000)
- ML103370218 + (TSTF 432 Revision 1 Missing Page E-mail)
- ML103370236 + (TSTF 432 Revision 1 Missing Page E-mail Attachment)
- EPID:L-2020-LLA-0009 + (TSTF 439)
- ML063170025 + (TSTF 449 SG Tube Integrity LAR - MD0209/MD0210)
- EPID:L-2021-LLA-0199 + (TSTF 505)
- EPID:L-2022-LLA-0023 + (TSTF 505)
- ML25198A230 + (TSTF 505 Additional Audit Questions)
- ML24019A139 + (TSTF 505 and 50.69 Audit Summary)
- ML25114A113 + (TSTF 505 and 50.69 LAR Additional Audit Items)
- EPID:L-2019-LLA-0063 + (TSTF 545)
- EPID:L-2021-LLA-0183 + (TSTF 554)
- EPID:L-2021-LLA-0019 + (TSTF 554)
- EPID:L-2019-PMP-0181 + (TSTF 554)
- EPID:L-2017-PMP-0006 + (TSTF 563)
- EPID:L-2020-LLA-0205 + (TSTF 563)
- EPID:L-2019-LLA-0109 + (TSTF 563)
- EPID:L-2022-LLA-0036 + (TSTF 569)
- EPID:L-2021-LLA-0017 + (TSTF 569)
- EPID:L-2019-PMP-0207 + (TSTF 576)
- EPID:L-2022-PMP-0011 + (TSTF 592)
- EPID:L-2023-PMP-0002 + (TSTF 596)
- TSTF-15-11, TSTF Comments on Draft Model Safety Evaluation of Traveler TSTF-545, TS Inservice Testing Program & Clarify SR Usage Rule Application to Section 5.5 Testing and Transmittal of TSTF-545, Revision 3 + (TSTF Comments on Draft Model Safety Evaluation of Traveler TSTF-545, TS Inservice Testing Program & Clarify SR Usage Rule Application to Section 5.5 Testing and Transmittal of TSTF-545, Revision 3)
- TSTF-15-13, TSTF Comments on Draft Model Safety Evaluation of Traveler TSTF-547, Revision 0, Clarification of Rod Position Requirements, and Transmittal of TSTF-547, Revision 1 + (TSTF Comments on Draft Model Safety Evaluation of Traveler TSTF-547, Revision 0, Clarification of Rod Position Requirements, and Transmittal of TSTF-547, Revision 1)
- TSTF-20-08, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirement + (TSTF Comments on Draft Safety Evaluation for Traveler TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirement)
- TSTF-19-06, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-569, Revision 1, Revise Response Time Testing Definition + (TSTF Comments on Draft Safety Evaluations for Traveler TSTF-569, Revision 1, Revise Response Time Testing Definition)
- TSTF-19-12, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position + (TSTF Comments on Draft Safety Evaluations for Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position)
- TSTF-19-01, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems + (TSTF Comments on Draft Safety Evaluations for Traveler TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems)
- TSTF-16-10, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control, and Transmittal of Editorial Corrections to TSTF-542, Revision 2 + (TSTF Comments on Draft Safety Evaluation for Traveler TSTF-542, Revision 2, Reactor Pressure Vessel Water Inventory Control, and Transmittal of Editorial Corrections to TSTF-542, Revision 2)
- TSTF-18-11, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program + (TSTF Comments on Draft Safety Evaluation for Traveler TSTF-563, Revision 0, Revise Instrument Testing Definitions to Incorporate the Surveillance Frequency Control Program)
- TSTF-18-07, TSTF Comments on Draft Safety Evaluation for Traveler TSTF-505, Provide Risk-Informed Extended Completion Times and Submittal of TSTF-505, Revision 2 + (TSTF Comments on Draft Safety Evaluation for Traveler TSTF-505, Provide Risk-Informed Extended Completion Times and Submittal of TSTF-505, Revision 2)