Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20263C154 + (System Isometric for Rhr/Lpci Mode (Loop B). Sheet 4)
- ML20263C150 + (System Isometric for Rhr/Lpci Mode (Loop C). Sheet 3)
- ML19043A887 + (System One Holdings, LLC Response to NRC Office of Investigations Report 3-2017-003 and Notice of Violation)
- ML18213A261 + (System One Holdings, LLC, NRC Form 591M Part 1, Inspection Report 03037788/2018001)
- ML18109A461 + (System One Holdings, Llc., Notice of Expiration of License 37-27891-02)
- ML20235M672 + (System Performance of HIGH-LEVEL Waste Package Components)
- ML25204A169 + (System Physics Advanced Reactor Critical (SPARC)-Plans for a New Critical Experiment Facility with a Horizontal Split Table (Report July 2025))
- ML20266C646 + (System Piping Isometric Chilled Water System Aux Bldg & CTMT El 119 0 Unit 1)
- ML20266C592 + (System Piping Isometric Comp Cool Water Supply Return Aux Bldg Above El 93 0 Unit 1)
- ML20266C597 + (System Piping Isometric Component Cooling Water Supply & Return CTMT El 135 4 Unit 1)
- ML20266C626 + (System Piping Isometric Condensate Transfer System CTMT Unit 1)
- ML20266C670 + (System Piping Isometric FPC & Cu CTMT Pools to Aux Bldg Containment Unit 1)
- ML20266C665 + (System Piping Isometric FPC & Cu Refuel Wtr to and from React Well Aux Bldg & CTMT Unit 1)
- ML20266C680 + (System Piping Isometric Fl & Equip Dr Chem Waste Sump Pump Disch CTMT & Aux Bldg Unit 1)
- ML20266C636 + (System Piping Isometric Fl & Equip Dr Fl Dr Sump Pp Disch Aux Bldg & CTMT Unit 1)
- ML20266C630 + (System Piping Isometric Floor & Equip Dr Equip Dr Sump Pr Disch Aux Bldg & CTMT Unit 1)
- ML20266C616 + (System Piping Isometric Plan Service Wtr in CTMT Area II Unit 1)
- ML20266C649 + (System Piping Isometric Plant Chilled Water CTMT Unit 1)
- ML20266C621 + (System Piping Isometric Plant Service Wtr in CTMT Area II Unit 1)
- ML20266C653 + (System Piping Isometric RWCU Blowdown to Condenser Unit 1)
- ML20261J712 + (System Pressure Testing Dwg INTERVAL-2 Chemical Feed Systems North Anna Power Stations Unit 1 Virginia Power.Sheet 2 of 2.Actual Drawing number:N-9013-1-1SPM102A-2)
- ML20261J695 + (System Pressure Testing Dwg INTERVAL-2 Feedwater System North Anna Power Station Unit 1 Virginia Power.Sheet 1 of 4. Actual Drawing number:N-9013-1-1SPM074A-2)
- ML20261J722 + (System Pressure Testing Dwg INTERVAL-2 Steam Generator Blowdown System North Anna Power Station Unit 1 Virginia Power.Sheet 3 of 5.Actual Drawing Number: N-9013-1-1SPM098A-2)
- ML20261J704 + (System Pressure Testing Dwg INTERVAL-2 Steam Generator Blowdown System North Anna Power Station Unit 1 Virginia Power.Sheet 2 of 5.Actual Drawing Number: N-9013-1-1SPM098A-2)
- ML20261J717 + (System Pressure Testing Dwg Interval 2 Steam Generator Blowdown System North Anna Power Station Unit 1 Virginia Power.Sheet 4 of 5.Actual Drawing Number: N-9013-1-1SPM098A-2)
- ML20198J756 + (System Readiness Review Plan)
- ENS 50198 + (System Restoration Error Causes Both Trains of Control Structure Chilled Water System to Be Inoperable)
- ML21273A312 + (System Review Report on the Peer Review of NRCs Office of the Inspector General Dated September 30th, 2021)
- ML20212J919 + (System Scaling for the Westinghouse AP600 Pressurized Water Reactor and Related Test Facilities.Analysis and Results)
- ML20262K795 + (System Status Monitor Train B Ctmt Spray,Chemical & Volume Contl & Spent Fuel Cooling & Purification Sys)
- ML20262K797 + (System Status Monitor Train B Dsl Gen & Dsl Gen Standby Power & Chilled Wtr Sys)
- ML20262K763 + (System Status Monitor:Train a Ctmt Spray,Chemical & Volume Contl & Spent Fuel Cooling & Purification Sys)
- ML030020120 + (System Training Manual Distribution Package 2002-743)
- ML17054A547 + (System Transmission Right-of-Way Improvement Details. Sheet 1 of 2)
- ML17054A548 + (System Transmission Right-of-Way Improvement Details. Sheet 2 of 2)
- ML22272A314 + (System-Theoretic Accident Model and Process Future Focused Research Reports)
- ML20261M974 + (System:Feedwater Unit 1 Category 2 Carb Stl ASME Sect III 1971 Ed with Addenda Thru Summer 1973 Shop Notes:D-316 Paint:(Organic) Keeler & Long 7107)
- ML20261M971 + (System:Feedwater Unit 1 Category 2 Carb Stl ASME Sect III 1971 Ed with Addenda Thru Summer 1973 Shop Notes:D-316 Paint:(Inorganic) Carbo Zinc II)
- ML20261M965 + (System:Main Steam Unit 1 Category 2 Carb Stl ASME Sect III 1971 Ed with Addenda Thru Summer 1973 Shop Notes:D-316 Paint:(Organic) Keeler & Long 7109)
- ML20261M968 + (System:Main Steam Unit 1 Category 2 Carb Stl ASME Sect III 1971 Ed with Addenda Thru Summer 1973 Shop Notes:D-316 Paint:(Organic) Keeler & Long 7107)
- ML21190A184 + (Systematic Assessment for How the NRC Addresses Environmental Justice in Its Programs, Policies, and Activities - FRN)
- ML20065K813 + (Systematic Assessment of Licensee Performance Notes Re Facility Evaluation for Aug 1979-Jul 1980)
- ML20065K865 + (Systematic Assessment of Licensee Performance Notes Re Facility Evaluation for Aug 1979-Jul 1980)
- ML20065K790 + (Systematic Assessment of Licensee Performance Notes Re Facility Evaluation for May 1979-Apr 1980)
- ML20065K843 + (Systematic Assessment of Licensee Performance Notes Re Facility Evaluation for May 1979-Apr 1980)
- ML20065K875 + (Systematic Assessment of Licensee Performance Notes Re Facility Evaluation for Oct 1979-Sept 1980)
- ML20065K829 + (Systematic Assessment of Licensee Performance Notes Re Facility Evaluation for Aug-Dec 1980)
- ML20065K820 + (Systematic Assessment of Licensee Performance Notes Re Facility Evaluation for 790901-800901)
- ML20065K780 + (Systematic Assessment of Licensee Performance Notes Re Facility Evaluation for Apr 1979-Mar 1980)
- ML20065K786 + (Systematic Assessment of Licensee Performance Notes Re Facility Evaluation for Apr 1979-Mar 1980)
- ML20065K796 + (Systematic Assessment of Licensee Performance Notes Re Facility Evaluation for Nov 1979-Oct 1980)