Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML25195A020 + (Susquehanna Steam Electric Station, Units 1 and 2 - Operator Licensing Examination Approval)
- ML25167A222 + (Susquehanna Steam Electric Station, Units 1 and 2 - Acceptance of Requested Licensing Action Relief from ISI for Fourth Ten-Year Interval (EPID L-2025-LLR-0056))
- ML26005A215 + (Susquehanna Steam Electric Station, Units 1 and 2 - Acceptance of Requested Licensing Action Revise TS to Adopt TSTF-599 (EPID L-2025-LLA-0186))
- ML25210A521 + (Susquehanna Steam Electric Station, Units 1 and 2 - Project Manager Assignment)
- ML25121A252 + (Susquehanna Steam Electric Station, Units 1 and 2 - Integrated Inspection Report 05000387/2025001 and 05000388/2025001)
- ML25265A055 + (Susquehanna Steam Electric Station, Units 1 and 2 - Comprehensive Engineering Team Inspection (CETI) Inspection Report 05000387/2025010 and 05000388/2025010)
- ML25134A242 + (Susquehanna Steam Electric Station, Units 1 and 2 - Acceptance of Requested Licensing Action MSL Leakage Rate TS Change (EPID L-2025-LLA-0068))
- ML25086A084 + (Susquehanna Steam Electric Station, Units 1 and 2 Summary of March 10, 2025, Public Observation Meeting Preapplication Meeting for Planned License Amendment Request for Change to Main Steam Line Technical Specifications)
- ML24330A017 + (Susquehanna Steam Electric Station, Units 1 and 2 - Follow-Up to Inspection Procedure 71111.12 Inspection Report 05000387/2024012 and 05000388/2024012 and Preliminary White Finding and Apparent Violation)
- ML25013A046 + (Susquehanna, Emergency Plan, Revision 68, PLA-8152)
- ML24345A198 + (Susquehanna, Independent Spent Fuel Storage - Installation Decommissioning Funding Plan Updated PLA-8150)
- PLA-8183, Susquehanna, Inservice Testing Program for the Fifth Ten-Year Interval, PLA-8183 + (Susquehanna, Inservice Testing Program for the Fifth Ten-Year Interval, PLA-8183)
- PLA-8164, Susquehanna, Modification to Technical Specification 2.6.1.3 Main Steam Line Isolation System Leakage Rate Surveillance Requirements + (Susquehanna, Modification to Technical Specification 2.6.1.3 Main Steam Line Isolation System Leakage Rate Surveillance Requirements)
- ML25111A102 + (Susquehanna, NRC Decommissioning Funding Status Report)
- PLA-8161, Susquehanna, NRC Decommissioning Funding Status Report December 31, 2024 + (Susquehanna, NRC Decommissioning Funding Status Report December 31, 2024)
- PLA-8159, Susquehanna, Nuclear Property Insurance Program - PLA-8159 + (Susquehanna, Nuclear Property Insurance Program - PLA-8159)
- PLA-8163, Susquehanna, Radiation Exposure Information and Reporting System - PLA-8163 + (Susquehanna, Radiation Exposure Information and Reporting System - PLA-8163)
- PLA-8172, Susquehanna, Relief Request 4RR-12 Regarding Fourth Ten-Year Inservice Inspection Interval Limited Examinations - PLA-8172 + (Susquehanna, Relief Request 4RR-12 Regarding Fourth Ten-Year Inservice Inspection Interval Limited Examinations - PLA-8172)
- PLA-8178, Susquehanna, Response to NRC Regulatory Issue Summary 2025-03 - PLA-8178 + (Susquehanna, Response to NRC Regulatory Issue Summary 2025-03 - PLA-8178)
- ML25016A199 + (Susquehanna, Supplement to Report for Missed Annual Inventory Required by 40 CFR 266, Subpart N and Request to Reclaim Conditional Exemption PLE-0026677)
- 05000387/LER-2025-001, Susquehanna, Unit 1, Manual Reactor Scram Following Partial Loss of Cooling to Main Transformer + (Susquehanna, Unit 1, Manual Reactor Scram Following Partial Loss of Cooling to Main Transformer)
- ML25356A487 + (Susquehanna, Unit 1, Technical Requirements Manual)
- ML25296A019 + (Susquehanna, Unit 1, Technical Requirements Manual)
- ML25101A037 + (Susquehanna, Unit 1, Technical Requirements, Manual)
- ML25356A493 + (Susquehanna, Unit 1, Technical Specification Bases, Manual)
- ML25101A036 + (Susquehanna, Unit 1, Technical Specification Bases, Manual)
- PLA-8186, Susquehanna, Unit 2, Owners Activity Report + (Susquehanna, Unit 2, Owners Activity Report)
- ML26007A231 + (Susquehanna, Unit 2, Technical Requirements Manual)
- ML25356A488 + (Susquehanna, Unit 2, Technical Requirements Manual)
- ML25296A020 + (Susquehanna, Unit 2, Technical Requirements Manual)
- ML25101A038 + (Susquehanna, Unit 2, Technical Requirements Manual)
- ML25356A489 + (Susquehanna, Unit 2, Technical Specifications Bases, Manual)
- ML25101A035 + (Susquehanna, Unit 2, Technical Specifications Bases, Manual)
- PLA-8187, Susquehanna, Units 1 and 2 - Application to Revise Technical Specifications to Adopt TSTF-599, Revision 1, Eliminate Periodic Surveillance Test of Simultaneous Start of Redundant Diesel Generators + (Susquehanna, Units 1 and 2 - Application to Revise Technical Specifications to Adopt TSTF-599, Revision 1, Eliminate Periodic Surveillance Test of Simultaneous Start of Redundant Diesel Generators)
- NEI 99-01, Susquehanna, Units 1 and 2 - Evaluation of Proposed Change Regarding Proposed License Amendment to Adopt Emergency Action Level Scheme + (Susquehanna, Units 1 and 2 - Evaluation of Proposed Change Regarding Proposed License Amendment to Adopt Emergency Action Level Scheme)
- NEI 99-01, Susquehanna, Units 1 and 2 - Proposed License Amendment to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors. + (Susquehanna, Units 1 and 2 - Proposed License Amendment to Adopt Emergency Action Level Scheme Pursuant to NEI 99-01, Revision 6, Development of Emergency Action Levels for Non-Passive Reactors.)
- ML25290A005 + (Susquehanna, Units 1 and 2 - Submittal of Revision 72 to Updated Final Safety Analysis Report and Revision 26 to Fire Protection Review Report)
- ML25290A110 + (Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 15, Section 15.9, Station Blackout (SBO))
- ML25290A045 + (Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 5, Section 5.4, Component and Subsystem Design)
- ML25290A049 + (Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 6, Section 6.1, Engineered Safety Feature Materials)
- ML25290A076 + (Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 10, Section 10.1, Summary Description)
- ML25290A139 + (Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 422)
- ML25290A148 + (Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 410)
- ML25290A054 + (Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 6, Appendix 6A, Sub-compartment Differential Pressure Considerations)
- ML25290A108 + (Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 15, Appendix 15e, Initial Core for SSES, Units 1 and 2, Non-Limiting Events)
- ML25290A129 + (Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 361)
- ML25290A152 + (Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 260)
- ML25290A030 + (Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 3, Section 3.7, Seismic Design)
- ML25290A053 + (Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 6, Appendix 6B, Compartment Differential Pressure Analysis Description)
- ML25290A104 + (Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 15, Section 15.5, Increase in Reactor Coolant Inventory)
- ML25290A010 + (Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 1, Section 1.4, Identification of Agents and Contractors)
- ML25290A102 + (Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 15, Section 15.1, Decrease in Reactor Coolant Temperature)
- ML25290A149 + (Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Questions 010)
- ML25290A035 + (Susquehanna, Units 1 and 2 - Updated Final Safety Analysis Report, Rev. 72, Chapter 3, Section 3.1, Conformance with NRC General Design Criteria)