Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML052800395 + (Special Inspection Charter - Indian Point Unit No. 2 (Updated))
- ML24214A325 + (Special Inspection Charter for Donald C. Cook Nuclear Power Station Emergency Diesel Generator Degraded Performance)
- ML082631012 + (Special Inspection Charter for Loss of Normal Offsite Power to Non-Safety Buses and Resultant Reactor Scram on 9/11/2008)
- ML113250495 + (Special Inspection Charter to Evaluate Brunswick Reactor Vessel Head Tensioning Issue)
- ML061010217 + (Special Inspection Charter to Evaluate Callaway Plant CCW Initiation to the RHR Heat Exchangers During the Initial Post-LOCA Recirculation Phase)
- ML12103A352 + (Special Inspection Charter to Evaluate Catawba Loss of Offsite Power)
- ML092860813 + (Special Inspection Charter to Evaluate Crystal River Containment Building)
- ML061160242 + (Special Inspection Charter to Evaluate Farley Unit 1 Main Steam Isolation Valve Failures)
- ML13142A467 + (Special Inspection Charter to Evaluate Harris Reactor Vessel Head Nozzle 49 Flaw Issue)
- ML070320281 + (Special Inspection Charter to Evaluate Operations and Maintenance on Time Critical Manual Valves)
- ML111823493 + (Special Inspection Charter to Evaluate Oconee Pressurizer Heater Breakers)
- ML25113A262 + (Special Inspection Charter to Evaluate Potential Radiation Overexposure at Curium Pharma Noblesville, Indiana)
- ML042240547 + (Special Inspection Charter to Evaluate Palo Verde Units 1, 2, and 3 Voided Condition Discovered in the Post-LOCA Recirculation Piping from the Containment Sump)
- ML053190102 + (Special Inspection Charter to Evaluate Service Water Event at Cooper Nuclear Station)
- ML15363A296 + (Special Inspection Charter to Evaluate the Power Cable Failures/Degradations on the Oconee Units 1 and 3 Startup Transformers)
- ML080080424 + (Special Inspection Charter to Evaluate the San Onofre Nuclear Generating Station Emergency Diesel Generator Governor Problem)
- ML14017A371 + (Special Inspection Charter to Evaluate the Failure of B Train Solid State Protection System Operability Surveillance Test at Farley Unit 2)
- ML14077A131 + (Special Inspection Charter to Evaluate the Abnormal Rotation of the Piston Crankshaft Bearings on the Catawba Unit 1 Diesel Generators)
- ML070530053 + (Special Inspection Charter to Evaluate the Fort Calhoun Station ABB Circuit Breaker)
- ML22221A092 + (Special Inspection Charter to Evaluate the Loss of Offsite Power to the Unit 1 4160V B Train Emergency Power Bus and Failure of the Turbine Driven AFW Pump)
- ML062720116 + (Special Inspection Charter to Evaluate the Palo Verde Nuclear Generating Station Unit 3 Emergency Diesel Generator Failure)
- ML063110234 + (Special Inspection Charter to Evaluate the Loss of Feedwater and Subsequent Reactor Trip at River Bend Station)
- ML080280044 + (Special Inspection Evaluation, Basis for Investigatory Response Decision for a Significant Operational Power Reactor Event)
- ML24116A045 + (Special Inspection Follow-Up Report 05000336/2024440 and 05000423/2024440 and Preliminary Finding(S) of Greater than Very Low Significance and NRC Investigation Report No. 1-2024-001 (Cover Letter Only))
- ML13170A328 + (Special Inspection Question & Answers)
- IR 05000254/2025050 + (Special Inspection Reactive Report 05000254/2025050)
- IR 05000315/2024050 + (Special Inspection Reactive Report 05000315/2024050 and 05000316/2024050)
- IR 05000341/2019050 + (Special Inspection Reactive Report 05000341/2019050)
- IR 05000416/2022050 + (Special Inspection Reactive Report 05000416/2022050)
- IR 05000313/2022050 + (Special Inspection Reactive Report 05000313 2022050 and 05000368 2022050 Cover Letter Only)
- IR 05000348/2022050 + (Special Inspection Reactive Report 05000348/2022050 and Apparent Violation)
- IR 05000346/2021050 + (Special Inspection Reactive Report 05000346/2021050 and Apparent Violation)
- IR 05000250/2020050 + (Special Inspection Report 05000250/2020050 and 05000251/2020050)
- IR 05000263/2008009 + (Special Inspection Report 05000263/2008009)
- IR 05000302/2009007 + (Special Inspection Report 05000302/2009007)
- ML23272A027 + (Special Inspection Report 05000317/2023050 and Preliminary White Finding and Apparent Violation)
- IR 05000336/2015012 + (Special Inspection Report 05000336/2015012, October 7�9 and 13-16, 2015 and November 24, 2015 (On-site), and October 19, 2015 � November 20, 2015 (Region I Office))
- IR 05000336/2023440 + (Special Inspection Report 05000336/2023440 and 05000423/2023440 (Cover Letter Only))
- IR 05000346/2023050 + (Special Inspection Report 05000346/2023050)
- IR 05000348/2022440 + (Special Inspection Report 05000348/2022440 and 05000364/ 2022440 and Preliminary Greater than Green Finding and and Apparent Violation (Cover Letter))
- IR 05000354/2025050 + (Special Inspection Report 05000354/2025050)
- IR 05000400/2023440 + (Special Inspection Report 05000400/2023440 and Preliminary Greater than Green Finding and Apparent Violation Cover Letter)
- IR 05000458/2014405 + (Special Inspection Report 05000458-14-405, NRC Investigation Report 4-2012-022, March 21, 2012, River Bend, Preliminary Greater than Green Finding and Apparent Violation)
- IR 05000458/2020050 + (Special Inspection Report 05000458/2020050)
- IR 05000461/2020403 + (Special Inspection Report 05000461/2020403 and Preliminary Greater than Green (Cover Letter Only))
- ML081720277 + (Special Inspection Report Questions - Transmittal E-mail)
- ML071840152 + (Special Inspection Team Charter)
- ML15139A195 + (Special Inspection Team Charter - Indian Point Nuclear Generating Unit 3 - Water Accumulation in Safety-Related Switchgear Room Following Deluge of Main Transformer Fire)
- ML18158A170 + (Special Inspection Team Charter for Inoperability of the Clinton Power Station Division 1 and Division 2 Emergency Diesel Generators)
- ML23129A606 + (Special Inspection Team Charters to Evaluate the Circumstances Surrounding the Ground Settling at the Davis-Besse Nuclear Power Station)
- IR 05000373/2017009 + (Special Inspection Team Report and Exercise of Discretion; Inspection Report 05000373/2017009; 05000374/2017009 (Jcb))