Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20199F273 + (SER Supporting Util Responses to Generic Ltr 83-28,Item 4.1 Concerning Generic Implications of Salem ATWS Event.Item Closed)
- ML18054A931 + (SER Supporting Util Responses to Generic Ltr 83-28,Item 2.2.1, Equipment Classification Program for All Safety- Related Components)
- ML20138S055 + (SER Supporting Util Responses to Generic Ltr 83-28,Items 3.1.3 & 3.2.3 Re post-maint Test Requirements)
- ML20195C557 + (SER Supporting Util Responses to Generic Ltr 83-28,Item 2.1 (Part 1) Re Equipment Classification (Reactor Trip Sys Components))
- ML20209B151 + (SER Supporting Util Responses to Generic Ltr 83-28,Item 4.5.2 Re Reactor Trip Sys on-line Testing)
- ML20209D387 + (SER Supporting Util Responses to Generic Ltr 83-28,Item 2.1 (Part 1) Re safety-related Reactor Trip Sys Components)
- ML16341E119 + (SER Supporting Util Responses to Generic Ltr 83-28,Items 3.1.3 & 3.2.3 Re Tech Specs for post-maint Testing Requirements That May Degrade Rather than Enhance Safety)
- ML20207H371 + (SER Supporting Util Responses to Generic Ltr 83-28,Item 2.1 Re Part 1 Equipment Classification)
- ML17261A845 + (SER Supporting Util Responses to Generic Ltr 83-28,Item 2.1, (Part 2) Re Vendor Interface Program)
- ML20151E275 + (SER Supporting Util Responses to Part 1,Item 2.1 of Generic Ltr 83-28, Required Actions Based on Generic Implications of Salem ATWS Events)
- ML17261A445 + (SER Supporting Util Structural Upgrade Program)
- ML20210E664 + (SER Supporting Util Submittal Re Physical Security, Safeguards Contingency & Guard Training & Qualification Plans,Per 10CFR73.SALP Input Encl)
- ML18033B092 + (SER Supporting Util Supplemental Responses & Actions to Address Generic Ltr 88-01, NRC Position on IGSCC in BWR Systematic Shutdown Stainless Steel Piping)
- ML20138K252 + (SER Supporting Util post-trip Review Data & Info Capabilities,Per Item 1.2 of Generic Ltr 83-28)
- ML20203G640 + (SER Supporting Util post-trip Review Data & Info Capability, Per Generic Ltr 83-28,Item 1.2)
- ML20245F555 + (SER Supporting Vendor 890519 & 0717 Applications for Amend to License SNM-778,reflecting Changes in Health & Safety Organization)
- ML11325A002 + (SER VRR3 SOV CIV Remote Position Verification Frequency)
- ML18171A205 + (SER W/Oi for NuScale DCA, Tier 2, Chapter 17, Quality Assurance and Reliability Assurance)
- ML22138A365 + (SER WCS CISF Amendment 1)
- ML20058A250 + (SER for Amends 26 & 32 to Subj Facil Oper Lic.Concludes That Tech Spec Changes Related to Heatup Rate,Reactor Vessel pressure-temp Oper Limits, & Part Length Rods Does Not Involve a Major Hazards Consideration)
- ML20012C277 + (SER for BWR Coolant Chemistry Loop to Be Installed & Operated in Mitr)
- ML20153H424 + (SER for Browns Ferry Units 1,2 & 3)
- ML20196J710 + (SER for Completion of Lower Core Support Assembly & Lower Head Defueling)
- ML20236Q461 + (SER for Crystal River Power Station,Unit 3,individual Plant Exam (Ipe).Concludes That Plant IPE Complete Re Info Requested by GL 88-20 & IPE Results Reasonable Given Plant Design,Operation & History)
- ML14175A845 + (SER for Cycle 10 Reload Analysis - LOCA Analyses)
- ML20099J505 + (SER for Cycle 10 Reload Application Chapter 15 Events)
- ML14190A688 + (SER for Environ Qualification of safety-related Electrical Equipment.No Undue Risk Involved W/Continued Operation.Four Major Qualification Deficiencies Require Resolution within 30 Days)
- ML17241A372 + (SER for Environmental Qualification of Terry Turbine Woodward Governor Controls for Unit 1.Staff Recommends This Matter Not Be Pursued Further Unless Far Greater Safety Significance Can Be Established)
- ML19337A090 + (SER for Facility)
- ML19319E071 + (SER for Facility)
- ML19316A539 + (SER for Facility)
- ML19312C836 + (SER for Facility)
- ML19220B779 + (SER for Facility)
- ML19270F755 + (SER for Facility)
- ML19326B452 + (SER for Facility by Div of Reactor Licensing)
- ML19208A238 + (SER for Facility,Suppl 1)
- ML19321A570 + (SER for Facility,Suppl 1 to NUREG-75/082)
- ML19323B171 + (SER for Facility,Suppl 10)
- ML19332A328 + (SER for Facility,Suppl 12)
- ML19321A872 + (SER for Facility,Suppl 2 to NUREG-75/082)
- ML19332B206 + (SER for Facility,Suppl 3)
- ML19321A857 + (SER for Facility,Suppl 3 to NUREG-75/095)
- ML19284A856 + (SER for Facility,Suppl 3 to NUREG-75/100)
- ML18082A409 + (SER for Facility,Suppl 4)
- ML19317G400 + (SER for Facility.Acrs 680515 Memo,Div of Reactor Licensing 671026 Memo,Doi Geological Survey ,Doc & Nm Nemark Engineering Consulting Svcs Rept, Adequacy of Structural Criteria for Crystal River Encl)
- ML20217G218 + (SER for Fission Converter Facility)
- ML22234A257 + (SER for GEH Morris Operation ISFSI Subsequent License Renewal)
- ML17202U777 + (SER for Generic Ltr 83-28,Item 4.5.3, Reactor Trip Sys Reliability for All Domestic Operating Reactors)
- ML21351A308 + (SER for Issuance of CoC 9337, Revision 5)
- ML20098C984 + (SER for Issuance of Exemption Request to McGuire Nuclear Station)
- ML20098D960 + (SER for Issuance of Exemption to Catawba)