Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "SER Approving Pump & Valve Testing Program Relief Request V-42". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20217J479  + (SER Approving Exemption from Certain Requirements of 10CFR73 for Zion Nuclear Power Station,Units 1 & 2.NRC Concluded That Proposed Alternative Measures for Protection Against Radiological Sabotage Meets Requirements of 10CFR73.55)
  • ML18037A762  + (SER Approving Exemption from Containment Posting Requirements of 10CFR73.55(d)(8))
  • ML20199A701  + (SER Approving Exemption from Requirements of 10CFR50.60 for Byron Station,Units 1 & 2 & Braidwood Station,Units 1 & 2)
  • ML20216B085  + (SER Approving Exemption from Requirements of 10CFR50.71(e)(4) Updates to Final Safety Analysis Rept for Vogtle Electric Generating Plant,Units 1 & 2)
  • ML17164A524  + (SER Approving Findings in First ten-year Interval Inservice Insp Program Plan,Rev 2 & Associated Requests for Relief Except for Relief Numbers 1RR-11 & 1RR-19)
  • ML20140J240  + (SER Approving GE Request for Proposed Change 3 to TS Re License DR-15)
  • ML20198A163  + (SER Approving Implementation Program to Resolve USI A-46 at Facility That Has Adequately Addressed Purpose of 10CFR50.54(f) Request)
  • ML16342E003  + (SER Approving Inservice Testing Program Relief Request P-RR4 for Diablo Canyon Plant,Units 1 & 2)
  • ML20210J868  + (SER Approving License Transfer from Montaup Electric Co to Little Bay Power Corp & Approval of Conforming Amend for Seabrook Station Unit 1)
  • ML17299A401  + (SER Approving Licensee 830414,840801 & 1205 Responses to Generic Ltr 82-33 Re Description of How post-accident Monitoring Instrumentation Meets Requirements of Reg Guide 1.97 Concerning Emergency Response Facilities)
  • ML20137S578  + (SER Approving Licensee 831104 & 0715 Responses to Generic Ltr 83-28,Item 1.1 Re post-trip Review.Program & Procedures for Restart from Unscheduled Reactor Trip Acceptable)
  • ML17310A584  + (SER Approving Licensee 930125 Request to Discontinue Fuel Assembly Shoulder Gap Measurements)
  • ML20056D642  + (SER Approving Licensee 930305 Relief Requests B-10,B-11 & Code Case N-496)
  • ML18038A935  + (SER Approving Licensee 940706 Request for Relief from Certain Inservice Insp Requirements of Section XI of ASME Boiler & Pressure Vessel Code for Plant)
  • ML20216H065  + (SER Approving Licensee Proposed Alternative to Use Code Case N-508-1 for Rotation of Serviced Snubbers & Prvs for Purpose of Testing in Lieu of ASME B&PV Code,Section Xi,Article IWA-7000 Requirements)
  • ML20079N862  + (SER Approving Licensee Request for one-time Exemption from App J to Allow Reverse Direction Local Leak Rate Testing of Two Containment Isolation Valves)
  • ML20217H899  + (SER Approving Licensee Requests for Relief NDE-R001 (Part a & B),NDE-R027,NDE-028,NDE-R029,NDE-R030,NDE-R032 & NDE-R035. Relief Request NDE-036,denied & Relief Request NDE-R-034, Deemed Unnecessary)
  • ML20133N657  + (SER Approving Licensee Use of Portions of Latest Edition of ASME Code Incorporated by Ref in Paragraph (B) of Section 50.55a for IST Leakage Rate Testing of Containment Isolation Valves)
  • ML20138K056  + (SER Approving Licensees IPE Process Capable of Identifying Severe Accidents & Severe Accident Vulnerabilities,For Plant,Unit 2)
  • ML20101L375  + (SER Approving Mod to Georgia Tech Research Reactor to Permit Operation at Increased Power Levels Up to 5 Mwt)
  • ML20134M338  + (SER Approving Physical Security Plan for Proposed Trojan ISFSI)
  • ML17164A966  + (SER Approving Proposed Alternative to Requirements of OM-10, Paragraph 4.3.2.1 Will Provide Reasonable Assurance of Operational Readiness & Therefore Authorized Pursuant to 10CFR50.55a(a)(3)(ii))
  • ML20205R037  + (SER Approving Proposed Deviation from Approved Fire Protection Program Incorporating Technical Requirements of 10CFR50,App R,Section III.0 That Applies to RCP Oil Fill Piping)
  • ML20210Q758  + (SER Approving Proposed Merger of CES & Bec,Which Will Create New Parent Company of Canal)
  • ML20217Q670  + (SER Approving Proposed Postponement of Beginning Augmented Exam Requirements of 10CFR50.55a(g)(6)(ii)(A)(2) at Grand Gulf for Circumferential Shell Welds for Two Operating Cycles)
  • ML20024H489  + (SER Approving Pump & Valve Testing Program Relief Request V-42)
  • ML20198R068  + (SER Approving Release of non-impacted General Atomics Facilities & Surrounding Areas for Unrestricted Use)
  • ML15112A410  + (SER Approving Relief Request 98-GO-007 from ASME Section XI Requirements for McGuire Nuclear Station,Units 1 & 2, Catawba Nuclear Station,Units 1 & 2 & Oconee Nuclear Station,Units 1,2 & 3)
  • ML18040A172  + (SER Approving Relief Request MSS-VRR-1 from Certain Inservice Testing Requirements of ASME BPV Code W/Respect to 18 Ms Safety & Relief Valves for Unit 2 at Plant)
  • ML18153B358  + (SER Approving Relief Request P-1 & P-11 for Plant,)
  • ML20217K394  + (SER Approving Relief Request for Pump Vibration Monitoring, Brunswick Steam Electric Plant,Units 1 & 2)
  • ML17188A101  + (SER Approving Relief Request from Implementation of 10CFR50.55a Requirements Re Repair & Replacement Activities for Containment)
  • ML20199J684  + (SER Approving Relief Requests to Second 10-year Inservice Inspection Interval for Duane Arnold Energy Center)
  • ML20127E064  + (SER Approving Renewal of License SNM-0844)
  • ML18152B586  + (SER Approving Request Relief Related to Inservice Testing Program at Surry Power Station Unit 1)
  • ML20212F526  + (SER Approving Request Reliefs 1-98-001 & 1-98-200,parts 1,2 & 3 for Second 10-year ISI Interval at Arkansas Nuclear One, Unit 1)
  • ML20217E187  + (SER Approving Request for Approval to Repair Flaws in Accordance W/Gl 90-05 for ASME Code Class 3 Service Water Piping,Virginia Electric & Power Co,North Anna Power Station,Units 1 & 2)
  • ML20133N378  + (SER Approving Request for Relief Re Inservice Testing of Automatic Depressurization Sys Safety/Relief Valves at Plant)
  • ML17180B345  + (SER Approving Request for Relief Re Third ten-yr Interval ISI Program for Plant Units 2 & 3)
  • ML20198L467  + (SER Approving Request for Relief VRR-4B to Inservice Testing Program Wisconsin Electric Power Co,Point Beach Nuclear Plant,Units 1 & 2)
  • ML16342D165  + (SER Approving Request for Relief for Temporary Repair of Ms Generator Instrumentation Piping Connection Utilizing ASME Code Case N-523.Conclusion Provided Verbally to Licensee on 950921 & non-Code Repair Implemented on 950925)
  • ML20216J779  + (SER Approving Requests for Relief I1R-46 Through I1R-49 & I2R-21 Submitted by Licensee on 970523.Relief for Exam Category B-A,Item B1.12,RPV Shell Welds Deferred Until Licensee Satisfies Regulations for Augmented Rv Exam)
  • ML20206G169  + (SER Approving Requirements of Istb 4.6.2(b) Pursuant to 10CFR50.55a(a)(3)(ii))
  • ML17059C423  + (SER Approving Restructuring of NMP Corp by Creation of Holding Company)
  • ML20154P661  + (SER Approving Rev 3 to Plant Second 10-yr Inservice Insp Program,Per 10CFR50.55a(g)(4))
  • ML20216J659  + (SER Approving Revalidation of German Certificate D/4322/AF-85,Rev 0)
  • ML20211D844  + (SER Approving SG 90-day Rept Submitted by Duquesne Light Co for Beaver Valley Power Station,Unit 1,per GL 95-05)
  • ML20238F328  + (SER Approving Second 10-year Interval Inservice Insp Program Request for Relief 12R-14 for Braidwood Station,Units 1 & 2)
  • ML20198R477  + (SER Approving Second 10-year Interval Inservice Inspection Program Plan Requests for Relief for Davis-Besse Nuclear Power Station,Unit 1)
  • ML20211P781  + (SER Approving Second 10-year Interval Inservice Insp Program Plan Relief Request RR-ENG-2-8 (to Use Code Case N-491-2) for South Texas Project,Units 1 & 2)
  • ML17291A469  + (SER Approving TR FTS-131,Application TR for BWR Design & Analysis)