Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML14084A291 + (Relief Request No. C-3 for Reactor Pressure Vessel Leak-Off Flange for the Second 10-Year Inservice Inspection Interval)
- CP-201301199, Relief Request No. C-3 for the Unit 2 Reactor Pressure Vessel leak-off Flange (Second ISI Interval Start Date: August 3, 2004; Second ISI Interval End Date: August 2, 2014 + (Relief Request No. C-3 for the Unit 2 Reactor Pressure Vessel leak-off Flange (Second ISI Interval Start Date: August 3, 2004; Second ISI Interval End Date: August 2, 2014)
- CP-201000889, Relief Request No. C-6 for Unit 1 Second 10 Year ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Physical Interferences (Second Interval Start Date: August 13, 2000) + (Relief Request No. C-6 for Unit 1 Second 10 Year ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Physical Interferences (Second Interval Start Date: August 13, 2000))
- CP-201000890, Relief Request No. C-7 for the Second 10 Year ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Physical Interferences (Second Interval Start Date: August 13, 2000) + (Relief Request No. C-7 for the Second 10 Year ISI Interval from 10 CFR 50.55a Inspection Requirements Due to Physical Interferences (Second Interval Start Date: August 13, 2000))
- CP-201001544, Relief Request No. C-9 for the Second 10 Year Interval from 10 CFR 50.55a Inspection Requirements Due to Hardship (Second Interval Start Date: August 13, 2000) + (Relief Request No. C-9 for the Second 10 Year Interval from 10 CFR 50.55a Inspection Requirements Due to Hardship (Second Interval Start Date: August 13, 2000))
- ML113110092 + (Relief Request No. C-9, Reactor Pressure Vessel Flange Leak-off Piping Configuration, Second 10-Year Inservice Inspection Interval)
- ML021200050 + (Relief Request No. CR-38, Inservice Inspection Program Relief Re 10-Hour Annual Training Requirement)
- ML13158A093 + (Relief Request No. E-1 Containment Electrical Penetrations, for the Second 10-Year Inservice Inspection Interval)
- CP-201200881, Relief Request No. E-1 for Containment Electrical Penetrations (Second IWE Interval End Date: September 9, 2011) + (Relief Request No. E-1 for Containment Electrical Penetrations (Second IWE Interval End Date: September 9, 2011))
- 0CAN112001, Relief Request No. EN-20-RR-001, Revision 1 - Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in Class 2 and 3 Systems, Section XI, Div 1 + (Relief Request No. EN-20-RR-001, Revision 1 - Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in Class 2 and 3 Systems, Section XI, Div 1)
- GNRO-2018/00054, Relief Request No. GG-ISI-023, Inservice Inspection Impracticality: Limited Coverage Examination During the Third 10-Year Inservice Inspection Interval + (Relief Request No. GG-ISI-023, Inservice Inspection Impracticality: Limited Coverage Examination During the Third 10-Year Inservice Inspection Interval)
- EPID:L-2018-LLR-0197 + (Relief Request No. GG-ISI-023, Inservice Inspection Impracticality: Limited Coverage Examination During the Third 10-Year Inservice Inspection Interval)
- ML031130636 + (Relief Request No. I2R-23, Limited Examination on Feedwater Nozzle to Steam Generator Weld)
- ML11109A016 + (Relief Request No. IP2-ISI-RR-12, Reactor Vessel Shell-To-Flange Weld Inspection for the Fourth 10-Year Inservice Inspection Interval (Tac No. ME5180))
- ML113180244 + (Relief Request No. IP2-ISI-RR-13, Reactor Vessel Weld Examination for the Third 10-Year Inservice Inspection Interval)
- ML120260090 + (Relief Request No. IP2-ISI-RR-14, Code Case N-770-1, RCS Cold Leg Nozzle Weld Inspection Frequency Extension)
- ML17069A283 + (Relief Request No. IP3-ISI-RR-09, for Alternative to the Depth Sizing Qualification Requirement)
- ML101870107 + (Relief Request No. ISI-3-30, Inspection of Reactor Vessel Head In-Core Instrument Nozzles for Third 10-Year Inservice Inspection Interval)
- ML073530477 + (Relief Request No. ISI-PT-01, Alternate Pressure Testing for Buried Piping Components, Fourth Inservice Inspection Interval)
- BVY 07-017, Relief Request No. ISI-PT-01, Alternate Pressure Testing for Buried Piping Components, Fourth Inservice Inspection Interval + (Relief Request No. ISI-PT-01, Alternate Pressure Testing for Buried Piping Components, Fourth Inservice Inspection Interval)
- ML18145A194 + (Relief Request No. NDE R017 Fourth Inservice Inspection Interval Duane Arnold Energycenter (EPID-L-2017-LLR-0135))
- ML13148A437 + (Relief Request No. P-1 for Pumps and Valves, Third 10-Year Inservice Testing Plan Interval)
- TXX-1211, Relief Request No. P-1 for Unit 1 and Unit 2 Inservice Testing Plan for Pumps and Valves (ASME OM Code 2004 Edition, Through 2006 Addenda Third Interval Start Date: August 3, 2013) + (Relief Request No. P-1 for Unit 1 and Unit 2 Inservice Testing Plan for Pumps and Valves (ASME OM Code 2004 Edition, Through 2006 Addenda Third Interval Start Date: August 3, 2013))
- CP-200801132, Relief Request No. P-2 for the Unit 1 and Unit 2 Inservice Testing Plan for Pumps and Valves (ASME OM Code 1998 Edition, Through 2000 Addenda; Interval Start Date: August 3, 2004, Second Interval) + (Relief Request No. P-2 for the Unit 1 and Unit 2 Inservice Testing Plan for Pumps and Valves (ASME OM Code 1998 Edition, Through 2000 Addenda; Interval Start Date: August 3, 2004, Second Interval))
- ML061420470 + (Relief Request No. PIL-05-R-001, TAC No. MC8299))
- ML060660132 + (Relief Request No. PIL-05-R-002,)
- ML060120127 + (Relief Request No. PPR-05)
- ML070590479 + (Relief Request No. PPR-15, Rev. 01, Approval to Include Remaining RPV Safe-End Welds in Contingency Repair Plan for Full Structural Weld Overlays)
- ML16008A086 + (Relief Request No. PR-01, PR-02, VR-01, VR-02, and VR-03 Related to the Inservice Testing Program for the Fifth 10-Year Interval)
- ML061740156 + (Relief Request No. PR-3 Regarding Testing of Auxiliary Feedwater Pumps)
- ML102720160 + (Relief Request No. PRR-09, Relief from Fixed Reference Value Testing for the Third 10-Year Inservice Testing Program Interval)
- ML062690435 + (Relief Request No. PRR-10 Risk-Informed Fourth 10-year Interval Inservice Inspection Program Plan)
- ML060340028 + (Relief Request No. PRR-11,)
- ML042310008 + (Relief Request No. PRR-29, Relief from System Hydrostatic Test Requirements for Small Bore ASME Code Class 1 Reactor Coolant Pressure Boundary Vent, Drain and Branch Lines and Connections)
- ML061450031 + (Relief Request No. PRR-4,)
- ML060240055 + (Relief Request No. PRR-9,)
- L-MT-03-001, Relief Request No. Pr 06 for Fourth 10-Year Inservice Testing Interval - High Pressure Coolant Injection Pump Testing + (Relief Request No. Pr 06 for Fourth 10-Year Inservice Testing Interval - High Pressure Coolant Injection Pump Testing)
- ML19261A167 + (Relief Request No. RBS-ISI-021, Proposed Alternative to 10 CFR 50.55a Examination Requirments for Third 10-Year Interval Volumetric Examinations)
- ML17194A807 + (Relief Request No. RR 4-25 Limited Coverage Examinations During the Fourth 10-Year Inservice Inspection Interval)
- ML21067A498 + (Relief Request No. RR 5-4 Proposed Alternative, Weld Reference System)
- ML18135A263 + (Relief Request No. RR 5-6 Alternate to the Reexamination Frequency for a Relevant Condition)
- ML040860006 + (Relief Request No. RR 63 Regarding risk-informed Inservice Inspection Program)
- ML072130487 + (Relief Request No. RR-01)
- ML17272A018 + (Relief Request No. RR-02- Proposed Alternative to ASME Code Examination Requirements for Buried Piping Related to Fifth Inservice Inspection Interval Program Plan)
- ML072220295 + (Relief Request No. RR-04)
- PLA-5543, Relief Request No. RR-35 to Inservice Inspection Plan for Pump and Valve Operational Testing for Units 1 & 2 + (Relief Request No. RR-35 to Inservice Inspection Plan for Pump and Valve Operational Testing for Units 1 & 2)
- ML023440240 + (Relief Request No. RR-35 to Inservice Inspection Plan for Pump and Valve Operational Testing for Units 1 & 2)
- ML062200226 + (Relief Request No. RR-39, Implementation of BWRVIP Guidelines in Lieu of ASME Section XI Code Requirements on Reactor Vessel Internals and Components Inspection)
- ML102160487 + (Relief Request No. RR-44, Reactor Vessel Weld Visual Examination Interval Extension for Third 10-Year Inservice Inspection Interval)
- ML080300307 + (Relief Request No. RR-6, Implementation of BWRVIP Guidelines in Lieu of ASME Section XI Code Requirements on Reactor Vessel Internals Components Inspection)
- ML070851008 + (Relief Request No. RR-ENG-2-44 on Deferral of Code Repair of Essential Cooling Water System Indication)