Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML16293A112 + (Redline Strikeout Version Comparing September 15, 2016 Draft Final Part 61 to Current Part 61 Rule Language)
- ML19044A517 + (Redline Strikeout Version for Standard Review Plan 13.6, Physical Security, Revision 4 Final)
- ML23297A162 + (Redline Strikeout for Interim Staff Guidance - DANU-ISG-2022-05, Advanced Reactor Content of Application Project Chapter 11, Organization and Human-System Considerations)
- ML23297A160 + (Redline Strikeout for Interim Staff Guidance - DANU-ISG-2022-03, Advanced Reactor Content of Application Project Chapter 9, Control of Routine Plant Radioactive Effluents, Plant Contamination and Solid Waste)
- ML23297A163 + (Redline Strikeout for Interim Staff Guidance - DANU-ISG-2022-06, Advanced Reactor Content of Application Project Chapter 12, Post-manufacturing and Construction Inspection, Testing, and Analysis Program)
- ML23297A165 + (Redline Strikeout for Interim Staff Guidance - DANU-ISG-2022-08, Advanced Reactor Content of Application Project, Risk-Informed Technical Specifications)
- ML23297A159 + (Redline Strikeout for Interim Staff Guidance - DANU-ISG-2022-02, Advanced Reactor Content of Application Project Chapter 2, Site Information)
- ML23297A158 + (Redline Strikeout for Interim Staff Guidance - DANU-ISG-2022-01, Advanced Reactor Content of Application Project, Review of Risk-Informed, Technology-Inclusive Advanced Reactor Applications - Roadmap)
- ML23297A164 + (Redline Strikeout for Interim Staff Guidance - DANU-ISG-2022-07, Advanced Reactor Content of Application Project, Risk-Informed Inservice Inspection/Inservice Testing)
- ML23297A166 + (Redline Strikeout for Interim Staff Guidance - DANU-ISG-2022-09, Advanced Reactor Content of Application Project, Risk-informed, Performance-based Fire Protection Program (for Operations))
- ML23297A161 + (Redline Strikeout for Interim Staff Guidance - DANU-ISG-2022-04, Advanced Reactor Content of Application Project Chapter 10, Control of Occupational Dose)
- ML093100347 + (Redline Version of Regulatory Guide 1.205, Revision 1, Handed Out at the 10/29/09 Public Meeting)
- ML21343A282 + (Redline/Strikeout Version of NEI 21-07 Rev 0-B, Technology Inclusive Guidance for Non-Light Water Reactors Safety Analysis Report Content for Applicants Using the NEI 18-04 Methodology)
- ML18257A032 + (Redline/Strikeout for Branch Technical Position 5-3)
- ML19129A143 + (Redline/Strikeout for Final Rev 4 of SRP 14.3.3)
- ML19060A118 + (Redline/Strikeout for Final Revision to BTP 5-3)
- ML18267A076 + (Redline/Strikeout for Revision 4 of Standard Review Plan 2.3.3)
- ML18267A055 + (Redline/Strikeout for SRP 2.4.6)
- ML19276F754 + (Redline/Strikeout for SRP Section 2.5.3)
- ML18264A035 + (Redline/Strikeout for Standard Review Plan 2.4.9)
- ML20155A180 + (Redox State of the Cedar Mountain Formation Aquifer Green River Umtra Site,Utah)
- TSTF-315 + (Reduce Plant Trips Due to Spurious Signals to the Nis During Physics Testing)
- 05000454/FIN-2013004-04 + (Reduced Decay Time)
- ML25027A415 + (Reduced Distance to Meteorological Tower and Presence of Pipe Manifold)
- 05000346/FIN-2007004-02 + (Reduced Flow Through Component Cooling Water 1 Heat Exchanger Because of Improper Valve Opening Limit Stop)
- ML050840117 + (Reduced Inventory)
- ML19261E751 + (Reduced Notch Worth Procedure,Revision 2)
- ML20211G890 + (Reduced Pressure and Fluid to Fluid Scaling Laws for TWO-PHASE Flow LOOP)
- ENS 48397 + (Reduced Radiation Monitoring Capability for Auxiliary Building and Containment Vent Stacks)
- Information Notice 1988-09, Reduced Reliability of Steam-Driven Auxiliary Feedwater Pumps Caused by Instability of Woodward PG-PL Type Governors + (Reduced Reliability of Steam-Driven Auxiliary Feedwater Pumps Caused by Instability of Woodward PG-PL Type Governors)
- Information Notice 2003-17, Reduced Service Life of Automatic Switch Company (ASCO) Solenoid Valves With Buna-N Material + (Reduced Service Life of Automatic Switch Company (ASCO) Solenoid Valves With Buna-N Material)
- Information Notice 2003-17, Reduced Service Life of Automatic Switch Company (Asco) Solenoid Valves with Buna-N Material + (Reduced Service Life of Automatic Switch Company (Asco) Solenoid Valves with Buna-N Material)
- ML17325A967 + (Reduced Temp & Pressure Operation for Donald C. Cook Nuclear Plant Unit 1 Licensing Rept, Including FSAR mark-ups)
- ML20041A530 + (Reducing Computer Execution Time for Convective Heat Transfer Calculation in RELAP5, Computational Methods Development Document)
- ML20058J794 + (Reducing Potential Risk of Severe Radiation Consequences Through Use of Sys of Pressure Release & Filtration of Discharge from Nuclear Power Plant Containment)
- ML20149H771 + (Reducing Risk: Setting Priorities & Strategies for Environ Protection)
- ML19221A099 + (Reduction Info of All Plant Data Re Incident from 790328-0427)
- ENS 40384 + (Reduction in Accident Mitigation Due to Improper Hpci Suction Transfer)
- ML033170070 + (Reduction in Commitment Regarding Offsite Review Committees)
- GO2-20-076, Reduction in Commitment to the Columbia Operation Quality Assurance Program Description + (Reduction in Commitment to the Columbia Operation Quality Assurance Program Description)
- EPID:L-2020-LLQ-0003 + (Reduction in Commitment to the Columbia Operation Quality Assurance Program Description)
- ML20181A445 + (Reduction in Commitment to the Operational Quality Assurance Program Description (EPID L-2020-LLQ-0003)(Covid-19))
- 05000255/FIN-2009004-04 + (Reduction in Containment Spray Header Level During Maintenance)
- 05000458/FIN-2011002-05 + (Reduction in ERO Staffing Decreased Emergency Plan Effectiveness)
- ENS 43184 + (Reduction in Emergency Preparedness Capability)
- ML13329A106 + (Reduction in Free Field Ground Motion Due to Presence of Structures, Submitted to Southern CA Edison Co)
- ML20079S236 + (Reduction in IGSCC Insp Frequencies)
- ML20129B541 + (Reduction in Minimum Rhrs Flowrate During Mid-Loop Operation for Byron & Braidwood Power Plants Units 1 & 2)
- ML020650564 + (Reduction in Requested Effective Full Power Years (EFPY) for Technical Specifications (TS) Change No. 414 - Pressure - Temperature (P-T) Curve Update, Response to Request for Additional Information)
- ML020380275 + (Reduction in Requested Effective Full Power Years (EFPY) for Technical Specifications (TS) Change No. 414 - Pressure - Temperature (P-T) Curve Update)
- EPID:L-2020-LLQ-0005 + (Reduction of Commitment to the Entergy Operation'S Quality Assurance Program Manual Description)