Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- Information Notice 1979-25, Reactor Trips at Turkey Point Units 3 & 4 + (Reactor Trips at Turkey Point Units 3 & 4)
- ML20260J660 + (Reactor Turbine Generator Board Plan View & Section CP-1)
- 05000390/LER-2011-004-01, Reactor Turbine Trip Due to Loss of Main Generator Excitation + (Reactor Turbine Trip Due to Loss of Main Generator Excitation)
- ML031130631 + (Reactor Vessel)
- ML20138L190 + (Reactor Vessel & Internals Removal Plan)
- LR-N07-0285, Reactor Vessel (N2G) Recirculation Inlet Nozzle Safe-End to Nozzle Weld Joint Weld Non-Destructive Examination Information + (Reactor Vessel (N2G) Recirculation Inlet Nozzle Safe-End to Nozzle Weld Joint Weld Non-Destructive Examination Information)
- ML19031B953 + (Reactor Vessel - Incore Instrument Tubing 10CFR50.55(E) Significant Deficiency)
- ULNRC-06953, Reactor Vessel Bottom Head (Rvbh) Bottom Mounted Instrument (Bmi) Nozzle Pressure Boundary Leakage (Cover Letter) + (Reactor Vessel Bottom Head (Rvbh) Bottom Mounted Instrument (Bmi) Nozzle Pressure Boundary Leakage (Cover Letter))
- ML25183A211 + (Reactor Vessel Bottom Head (Rvbh) Bottom Mounted Instrument (Bmi) Nozzle Pressure Boundary Leakage)
- 05000483/LER-2025-002, Reactor Vessel Bottom Head (Rvbh) Bottom Mounted Instrument (Bmi) Nozzle Pressure Boundary Leakage + (Reactor Vessel Bottom Head (Rvbh) Bottom Mounted Instrument (Bmi) Nozzle Pressure Boundary Leakage)
- ML11363A075 + (Reactor Vessel Bottom Mounted Instrumentation Paint Cracking Analysis)
- ML053320312 + (Reactor Vessel CMTRs (Non-Proprietary))
- L-06-050, Reactor Vessel Capsule X Analysis Report + (Reactor Vessel Capsule X Analysis Report)
- ML20104A960 + (Reactor Vessel Cavity Seal Test Results)
- NRC 2002-0028, Reactor Vessel Clossure Head Penetration Repair Relief Requests MR 02-004-1 and MR-02-004-2 + (Reactor Vessel Clossure Head Penetration Repair Relief Requests MR 02-004-1 and MR-02-004-2)
- ML030770261 + (Reactor Vessel Closure Head Import Proposal from Canada for End Use at the Ginna Nuclear Power Station)
- ML110100284 + (Reactor Vessel Closure Head Nozzle)
- 05000454/LER-2024-002, Reactor Vessel Closure Head Penetration 31 Degraded + (Reactor Vessel Closure Head Penetration 31 Degraded)
- NRC 2003-0067, Reactor Vessel Closure Head Penetration Repair Relief Requests MR 03-018-1 and MR 02-018-2 Supplement 2 and Response to Request for Additional Information + (Reactor Vessel Closure Head Penetration Repair Relief Requests MR 03-018-1 and MR 02-018-2 Supplement 2 and Response to Request for Additional Information)
- NRC 2003-0034, Reactor Vessel Closure Head Penetration Repair Relief Requests MR 03-018-1 & MR 02-018-2 Supplement 1 & Response to Request for Additional Information + (Reactor Vessel Closure Head Penetration Repair Relief Requests MR 03-018-1 & MR 02-018-2 Supplement 1 & Response to Request for Additional Information)
- ML031060579 + (Reactor Vessel Closure Head Penetration Repair Relief Requests MR 03-018-1 & MR 02-018-2 Supplement 1 & Response to Request for Additional Information)
- ML032940258 + (Reactor Vessel Closure Head Penetration Repair, Relief Requests Nr 02-018-1 and MR 02-018-2, Request for Review of Additional Technical Justification)
- NRC 2002-0073, Reactor Vessel Closure Head Penetration Repair Relief Requests MR 02-018-1 and MR 02-018-2 + (Reactor Vessel Closure Head Penetration Repair Relief Requests MR 02-018-1 and MR 02-018-2)
- NRC 2005-0084, Reactor Vessel Closure Head Penetration Flaw Characterization Relief Request MR 02-018-2, Revision 2 + (Reactor Vessel Closure Head Penetration Flaw Characterization Relief Request MR 02-018-2, Revision 2)
- ML031610223 + (Reactor Vessel Closure Head Replacement Project Letter, Dated May 20, 2003)
- ML031270607 + (Reactor Vessel Closure Head Replacement Project)
- Information Notice 2012-21, Reactor Vessel Closure Head Studs Remain Detensioned During Plant Startup + (Reactor Vessel Closure Head Studs Remain Detensioned During Plant Startup)
- ML032110382 + (Reactor Vessel Closure Head Welding Data Sheets)
- ML20070M080 + (Reactor Vessel Core Support Cone Structural Integrity)
- 05000455/FIN-2013005-05 + (Reactor Vessel Design Documents Not Updated to Reflect Unit 2 Missing Head Stud)
- ML20262D862 + (Reactor Vessel Design Layout. Sheet 1 of 9)
- ML20262D867 + (Reactor Vessel Design Layout. Sheet 2 of 9)
- ML20262D879 + (Reactor Vessel Design Layout. Sheet 3)
- ML20262D882 + (Reactor Vessel Design Layout. Sheet 4)
- ML20262D884 + (Reactor Vessel Design Layout. Sheet 5)
- ML20262D888 + (Reactor Vessel Design Layout. Sheet 6)
- ML20262D889 + (Reactor Vessel Design Layout. Sheet 7)
- ML20262D892 + (Reactor Vessel Design Layout. Sheet 8)
- ML20262D894 + (Reactor Vessel Design Layout. Sheet 9)
- ML20265B008 + (Reactor Vessel Details.Sheet 1)
- ML22097A130 + (Reactor Vessel Embrittlement Presentation on March 22, 2022)
- ML20076H285 + (Reactor Vessel Exam Program)
- ML20260E870 + (Reactor Vessel Flange LEAK-OFF Valve Logic Diagram System:Rc. Actual Drawing NUMBER:6R-14-9-Z-42161 1)
- ML20261M023 + (Reactor Vessel Flange Leak-Off Valve Logic Diagram System: Rc)
- PMNS20190007, Reactor Vessel Flange Tool (Rft) Fuel Seismic Aspect + (Reactor Vessel Flange Tool (Rft) Fuel Seismic Aspect)
- ML20137L791 + (Reactor Vessel Fluence & RT Pressurized Thermal Shock (PTS) Evaluations)
- ML20055D859 + (Reactor Vessel Fluence & Ref Temp PTS Evaluations)
- ML20140A682 + (Reactor Vessel Fluence & Ref Temp for Pressurized Thermal Shock Evaluations)
- ML20237C058 + (Reactor Vessel Fluence & Rt/Pts Evaluations)
- ML20207B523 + (Reactor Vessel Fluence & Rt/Pts Evaluations Suppl to WCAP 11016)
- ML20249C001 + (Reactor Vessel Fluence Analysis Methodology)