MONTHYEARML23235A1722023-08-23023 August 2023 Re. Ginna Nuclear Power Plant, Transmittal of 2023 Owner'S Activity Report NMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits2022-06-30030 June 2022 Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits ML21350A1142021-12-16016 December 2021 Annual Commitment Change Notification ML21316A0512021-11-12012 November 2021 Notification of Deviation from Pressurized Water Reactor Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections RS-21-093, R. E. Ginna, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2021-09-0101 September 2021 R. E. Ginna, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping ML20303A1752020-10-23023 October 2020 Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting ML20265A1982020-09-21021 September 2020 R. E. Ginna Nuclear Power Plant, Application to Revise Technical Specifications for Steam Generator Tube Inspection Frequency ML17345A9902017-12-21021 December 2017 R. E. Ginna Nuclear Power Plant Flood Hazard Mitigation Strategies Assessment ML17214A1182017-07-27027 July 2017 Transmittal of 2017 Owner'S Activity Report for the Plant ML15167A5052015-06-11011 June 2015 (Redacted Version) Response to Request for Additional Information Regarding the License Amendment Request (LAR) to Adopt NFPA 805, Attachment 3 ML15153A0262015-06-11011 June 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(f), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near-Term Task Force Review of Insight RS-15-069, Enclosure 2: Areva, Inc., Rev. 1 to 51-9205719-001, R.E. Ginna Nuclear Power Plant Flood Hazard Reevaluation Report, Part 2 of 22015-03-11011 March 2015 Enclosure 2: Areva, Inc., Rev. 1 to 51-9205719-001, R.E. Ginna Nuclear Power Plant Flood Hazard Reevaluation Report, Part 2 of 2 ML15072A0112015-03-11011 March 2015 Enclosure 2: Areva, Inc., Rev. 1 to 51-9205719-001, R.E. Ginna Nuclear Power Plant Flood Hazard Reevaluation Report, Part 1 of 2 RS-15-069, Enclosure 2: Areva, Inc., Rev. 1 to 51-9205719-001, R.E. Ginna Nuclear Power Plant Flood Hazard Reevaluation Report, Part 1 of 22015-03-11011 March 2015 Enclosure 2: Areva, Inc., Rev. 1 to 51-9205719-001, R.E. Ginna Nuclear Power Plant Flood Hazard Reevaluation Report, Part 1 of 2 RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 12014-09-24024 September 2014 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 ML14170B0222014-06-26026 June 2014 Staff Assessment of Flooding Walkdown Reports Supporting Implementation of Near-Term Task Force Recommendation 2.3 Related to the Fukushima Accident ML14099A1962014-03-31031 March 2014 Constellation Energy Nuclear Group, LLC - Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task. ML14071A4782014-02-21021 February 2014 Response to Nrc'S Request for Cashflow Statements Regarding Application for Order Approving Transfer of Operating Authority and Conforming License Amendments ML14007A7042014-02-19019 February 2014 R. E. Ginna Nuclear Power Plant - Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14037A2772014-02-0909 February 2014 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for R.E. Ginna Nuclear Power Plant, TAC No.: MF1152 ML13294A0232013-10-16016 October 2013 Snubber Program Plan ML13210A0342013-07-25025 July 2013 Supplemental Response to 10 CFR 50.54(f) Request for Recommendation 2.3, Seismic Information ML13093A0652013-03-29029 March 2013 Transition Report to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition - Transition Report, Redacted Version. Enclosure 2 ML13066A1712013-02-28028 February 2013 R.E. Gina, Overall Integrated Plan for Mitigation Strategies for Beyond-Design-Basis External Events ML12362A4512012-12-21021 December 2012 Supplemental Response to 10 CFR 50.54(f) Request for Information, Recommendation 2.3. Seismic, Attachment (1) Supplemental Seismic Walkdown Report, Table of Contents Through Attachment (2) Seismic Walkdown Checklists, Page B-90 ML12362A4522012-12-21021 December 2012 Supplemental Response to 10 CFR 50.54(f) Request for Information, Recommendation 2.3. Seismic, Attachment (3) Area Walk-By Checklists Through End ML12277A0902012-10-12012 October 2012 Technical Letter Report on Aging Management Program Audits at Ginna and Nine Mile Point 1 ML12277A1742012-09-28028 September 2012 R. E. Ginna - License Renewal Aging Management, Submit Revised Reactor Vessel Internals Program Document in Accordance with RIS 2011-07 ML12080A1422012-03-16016 March 2012 Attachments 1 & 2, Structural Integrity Evaluation of Circumferential Indication in Ginna Bmi Nozzle No. A86, and Location of Indications in A86 Bmi Penetration ML11343A6792011-12-0606 December 2011 Report of Facility Changes. Tests, and Experiments Conducted Without Prior Commission Approval ML11363A0752011-10-0505 October 2011 Reactor Vessel Bottom Mounted Instrumentation Paint Cracking Analysis ML11363A0762011-08-31031 August 2011 Evaluation of Leakage and Deposit Formation in Painted Full-Scale Bmi Mockups, Final Report, Revision 2, Swri Project No. 18.16196, Ceng Purchase Order No. 6610691 ML1027306232010-09-22022 September 2010 R. E. Ginna - Transmittal of RCS Pressure and Temperature Limits Report (PTLR) ML1012704392010-05-0505 May 2010 Y020100187 - List of Historical Leaks and Spills at U.S. Commercial Nuclear Power Plants ML1009200572010-03-29029 March 2010 Report of Facility Changes, Tests, and Experiments Conducted Without Prior Commission Approval ML0915502712009-05-31031 May 2009 WCAP-17036-NP, Rev 0, Analysis of Capsule N from the R.E. Ginna Reactor Vessel Radiation Surveillance Program. ML0914802612009-05-19019 May 2009 Transmittal of RCS Pressure and Temperature Limits Report (PTLR) ML0906411032009-02-27027 February 2009 R. E. Ginna Nuclear Power Plant - License Renewal Aging Management Reactor Vessel Internals Program ML12220A1012008-11-24024 November 2008 Constellation Energy Group, Inc. Definitive Proxy Statement Schedule 14A ML0827402682008-09-23023 September 2008 Transmittal of Steam Generator Examination Report for the R.E. Ginna Nuclear Power Plant Conducted in 2008 ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 ML0807100412008-02-29029 February 2008 R.E. Ginna, Supplement Response to GL-04-002, Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors ML0712703072007-05-0101 May 2007 Report of Facility Changes, Tests and Experiments Conducted Without Prior Commission Approval ML0612101732006-01-12012 January 2006 FEMA Final Exercise Report - R. E. Ginna (Dated 1/12/06) ML0536201882005-11-17017 November 2005 Meeting with R. E. Ginna Nuclear Power Plant, LLC, Regarding Extended Power Uprate Amendment Application ML0529204182005-10-10010 October 2005 R. E. Ginna - Report of Facility Changes, Tests, and Experiments Conducted Without Prior Commission Approval ML0519300192005-07-0101 July 2005 R. E. Ginna Nuclear Power Plant, Transmittal of RCS Pressure and Temperature Limits Report (PTLR) ML0727008492005-01-31031 January 2005 Caldon Experience in Nuclear Feedwater Flow Measurement ML0414802942004-05-21021 May 2004 Appendix R Summary for the Proposed Control Room Emergency Air Treatment System (Creats) Modification 2023-08-23
[Table view] Category:Technical
MONTHYEARNMP1L3469, Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits2022-06-30030 June 2022 Constellation Energy Company, LLC, Request for Use of Honeywell Mururoa V4F1 R Supplied Air Suits RS-21-093, R. E. Ginna, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections2021-09-0101 September 2021 R. E. Ginna, Proposed Alternative for Examinations of Examination Category C-B Steam Generator Nozzle-to-Shell Welds and Nozzle Inside Radius Sections RS-21-001, Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping2021-01-0404 January 2021 Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping ML20265A1982020-09-21021 September 2020 R. E. Ginna Nuclear Power Plant, Application to Revise Technical Specifications for Steam Generator Tube Inspection Frequency RS-15-069, Enclosure 2: Areva, Inc., Rev. 1 to 51-9205719-001, R.E. Ginna Nuclear Power Plant Flood Hazard Reevaluation Report, Part 2 of 22015-03-11011 March 2015 Enclosure 2: Areva, Inc., Rev. 1 to 51-9205719-001, R.E. Ginna Nuclear Power Plant Flood Hazard Reevaluation Report, Part 2 of 2 RS-15-069, Enclosure 2: Areva, Inc., Rev. 1 to 51-9205719-001, R.E. Ginna Nuclear Power Plant Flood Hazard Reevaluation Report, Part 1 of 22015-03-11011 March 2015 Enclosure 2: Areva, Inc., Rev. 1 to 51-9205719-001, R.E. Ginna Nuclear Power Plant Flood Hazard Reevaluation Report, Part 1 of 2 ML15072A0112015-03-11011 March 2015 Enclosure 2: Areva, Inc., Rev. 1 to 51-9205719-001, R.E. Ginna Nuclear Power Plant Flood Hazard Reevaluation Report, Part 1 of 2 RS-14-277, Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 12014-09-24024 September 2014 Proposed Alternative to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, Division 1 ML14071A4782014-02-21021 February 2014 Response to Nrc'S Request for Cashflow Statements Regarding Application for Order Approving Transfer of Operating Authority and Conforming License Amendments ML14007A7042014-02-19019 February 2014 R. E. Ginna Nuclear Power Plant - Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) ML14037A2772014-02-0909 February 2014 Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for R.E. Ginna Nuclear Power Plant, TAC No.: MF1152 ML13210A0342013-07-25025 July 2013 Supplemental Response to 10 CFR 50.54(f) Request for Recommendation 2.3, Seismic Information ML13093A0652013-03-29029 March 2013 Transition Report to 10 CFR 50.48(c) - NFPA 805 Performance-Based Standard for Fire Protection for Light Water Reactor Electric Generating Plants, 2001 Edition - Transition Report, Redacted Version. Enclosure 2 ML12277A0902012-10-12012 October 2012 Technical Letter Report on Aging Management Program Audits at Ginna and Nine Mile Point 1 ML12080A1422012-03-16016 March 2012 Attachments 1 & 2, Structural Integrity Evaluation of Circumferential Indication in Ginna Bmi Nozzle No. A86, and Location of Indications in A86 Bmi Penetration ML11363A0752011-10-0505 October 2011 Reactor Vessel Bottom Mounted Instrumentation Paint Cracking Analysis ML11363A0762011-08-31031 August 2011 Evaluation of Leakage and Deposit Formation in Painted Full-Scale Bmi Mockups, Final Report, Revision 2, Swri Project No. 18.16196, Ceng Purchase Order No. 6610691 ML0915502712009-05-31031 May 2009 WCAP-17036-NP, Rev 0, Analysis of Capsule N from the R.E. Ginna Reactor Vessel Radiation Surveillance Program. ML0914802612009-05-19019 May 2009 Transmittal of RCS Pressure and Temperature Limits Report (PTLR) ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 ML0612101732006-01-12012 January 2006 FEMA Final Exercise Report - R. E. Ginna (Dated 1/12/06) ML0536201882005-11-17017 November 2005 Meeting with R. E. Ginna Nuclear Power Plant, LLC, Regarding Extended Power Uprate Amendment Application ML0519300192005-07-0101 July 2005 R. E. Ginna Nuclear Power Plant, Transmittal of RCS Pressure and Temperature Limits Report (PTLR) ML0411403232004-04-15015 April 2004 R. E. Ginna, Report of Facility Changes, Tests, and Experiments Conducted Without Prior Commission Approval ML0326811302003-09-25025 September 2003 Summary of the U.S. Nuclear Regulatory Commission (NRC) Staff'S Review of the R.R. Ginna Nuclear Power Plant (Ginna) Steam Generator Tube Inspection Report Dated July 2002 ML0310703292003-04-11011 April 2003 R. E. Ginna Nuclear Power Plant - Response to LRA RAIs 4.2.1-1 & 4.2.2-1 ML0304105992003-01-31031 January 2003 Response to December 26, 2002 Request for Additional Information Regarding Severe Accident Mitigation Alternatives ML0229603892002-10-17017 October 2002 Supplementary Information Associated with the 2002 Steam Generator Inservice Inspection ML0231201722002-10-0707 October 2002 Response to Request for Additional Information Related to Creats Actuation Instrumentation License Amendment Request, Attachment 12 ML0229104172002-10-0707 October 2002 Response to Request for Additional Information Related to Creats Actuation Instrumentation License Amendment Request, Attachments 17 -19 ML0228905182002-10-0707 October 2002 Response to Request for Additional Information Related to Creats Actuation Instrumentation License Amendment Request, Attachments 10 and 11 ML0228901572002-10-0707 October 2002 Response to Request for Additional Information Related to Creats Actuation Instrumentation License Amendment Request, Attachments 1 - 4 ML0230402682002-09-19019 September 2002 Part 4 of 4 - Westinghouse Technology Manual, Course Outline for R-104P and Course Manual ML0812800962002-07-31031 July 2002 WCAP-15885, Rev. 0, R.E. Ginna Heatup and Cooldown Limit Curves for Normal Operation. NRC Generic Letter 1979-451979-09-25025 September 1979 NRC Generic Letter 1979-045: Transmittal of Reports Regarding Foreign Reactor Operation Experiences ML18143A4511978-07-24024 July 1978 Amendments to Prior Design Modifications on the Undervoltages Protection Systems ML18192A1301978-01-31031 January 1978 R. E. Ginna - Safety Analysis of Proposed Modification of Pressurizer Instrument Terminal Blocks Presented to PORC and Nsarb on Jan. 31, 1978 ML18142B2351977-05-16016 May 1977 LER 1977-003-00 for R.E. Ginna, Abnormal Degradation of Steam Generator Tubes ML18143A1041971-10-0505 October 1971 R.E Ginna Unit 1, Amendment No. 2 to Technical Supplement Accompanying Application to Increase Power 2022-06-30
[Table view] |
Text
ENCLOSURE 2 Ginna Reactor Vessel Bottom Mounted Instrumentation Paint Cracking Analysis
Ginna Reactor Vessel Bottom Mounted Instrumentation Paint Cracking Analysis October 5, 2011 Written by:. t______ _L it_
'Maureen Kuchta, Materials Lab, Engineering Programs Reviewed by: Ld 2 ,
SupeSe asorayYEngineening Wells ... Programs g..
I Summary:
" Cracking due to aging, thermal cycling, and brittleness in the Ginna BMI annulus paint has resulted in leak paths that would allow detection of any leakage or deposits that might occur.
" The presence of paint micro-cracking was verified in the 2009 head paint samples, the 2011 replicas at the annulus, and the thermally cycled mock-up samples.
" The leakage paths from micro-cracking in the Ginna annulus paint are more extensive than in the SwRi mock-up paint. Since the mock-up paint did not prevent leakage detection, the aged Ginna paint will not act as a barrier to leak detection either.
2
Background:
The discovery of a cavity in the Davis-Besse reactor vessel upper head resulted in an industry wide examination of reactor vessels for areas of possible pressure boundary leakage, including bottom mounted instrument (BMI) penetration nozzles. Unlike most BMI nozzles in the industry, the Ginna Nuclear Plant nozzles were painted prior to installation. A 2008 visual exam (WO 20602552) determined that ten of the Ginna nozzles are fully occluded with paint, twenty-one are 50%
occluded, and five are less than 50% occluded.
This report compares the results of three analyses that characterize the paint and the effect on leak detection at the BMI nozzle-to- head annulus.
Southwest Research Institute - "Evaluation of Leakage and Deposit Formation in Painted Full-Scale BMI Mockups" Southwest Research Institute (SwRi) ran a series of tests on painted full-scale BMI mockups in order to:
- Determine whether a paint layer would plug the annulus exit and prevent leakage.
" Determine if deposit formation outside the annulus would be obscured by the paint.
- Obtain information on the effect of the paint on the pressure within a leaking annulus.
SwRi concluded that the mockup paint is not an effective barrier for either water or steam exiting the annulus. In addition, thermal cycling produces paint cracking that serves as an effective leak path. 1 2009 Refueling Outage (RFO) BMI Coating Analysis During the 2009 RFO, two 0.5 mm diameter samples of paint from the Ginna Reactor Vessel BMI were removed for analysis. The purpose was to confirm that the paint was Koppers Hi-Heat Bitumastic and to examine the paint for cracking that could reduce the adhesion of the paint to the metal surface. The samples were taken from the machined head surface approximately 20" from a nozzle.
Electron microscope images of the paint showed multiple cracks in the brittle paint surface that are likely to reduce adhesion. 2
3 2011 RFO BMI Coating Annulus Replication During the 2011 Ginna Refueling Outage, replicas of the nozzle-to-head annulus at three locations were taken in order to:
- Confirm that the paint at the annulus has cracking similar to the paint samples obtained in 2009.
- Compare the Ginna BMI annulus paint to the SwRi BMI painted mock-ups.
Replication is a method for obtaining a high resolution copy of a surface for examination in an optical or scanning electron microscope. Replication produces a negative image of the surface so that cracks in the paint show up as ridges in the replica. Struers RepliSet silicone rubber was used to produce the copies of the annulus paint surfaces. Struers states that the resolution of their Repliset material is 0.1 micron. The width of the paint cracks varied however the size of the smallest micro-cracking seen in the electron microscope was greater than 25 microns. The Struers RepliSet material has sufficient resolution to characterize the annulus surface.
Replication was selected rather than paint chip sampling because it allows more contiguous surface area to be examined. It also produces an accurate copy of the paint without any cracking caused by removal from the annulus. Three locations (See Attachment 1.) were selected and replicated per ASTM Standard E 1351 "Standard Practice for Production and Evaluation of Field Metallographic Replicas".
The replicas were taken at the annulus surface between the head and the nozzle.
Figures la and lb show images of an annulus compared to a silicone replica. The ridge of material between the head and nozzle is where the replica material penetrated into the annulus gap between the nozzle and head. This could not occur if paint were sealing that area.
Head Annulus Head
~Annul S Nozzleozzle Figure la Figure lb Optical Image of the Head, Annulus, Replica of the Head, Annulus, and Nozzle and Nozzle
4 Figure 2 shows an electron microscope image of a replica from the annulus. Two approximately 0.5 mm paint particles pulled away from the metal and adhered to the replica material when it was removed from the annulus. It is likely that cracks in the paint reduced the paint adhesion to the metal. One of the chips has a second crack runnin d' a across it.
Replica
~Crac Paint particles pulled from annulus by Figure 2 Location 89-2 Magnification - 60x SEM Image of a replica with paint chips imbedded Figure 3 shows a SEM image of the replica of the cracked paint. The cracks show up as protrusions since the replica material penetrates into the cracks and produces an inverse image.
Figure 3 Location 77-1 Replica of Cracked Paint Surface - 20x Electron Microscope Image
5 Comparison of Paint Surface Cracking of the SwRi Mock-up, the Ginna 2009 Paint Samples, and the 2011 Annulus Replication Samples Images were taken by SwRi and the Ginna Materials Lab using a steromicroscope, scanning electron microscopy, and replication. Corresponding images taken at comparable magnification were not always available.
Figures 4a through 4c below show images of the Ginna head and annulus paint sample locations and an SwRi mockup used for leakage testing. Attachment 1 at the end of this report shows the location of the nozzles that were replicated during the 2011 RFO.
89, Annulus--.
Head Paint:.
Sample Lo Figure 4a through 4c Ginna Nozzle Paint Test Locations and SwRi Mockup Figures 5a, 5b, 6a, and 6b show optical images of the cracks in the SwRi Mockup annulus compared to the Ginna 2011 annulus replica, Location 89-2. The SwRi mock-up paint cracked more often in a circumferential direction while the 2011 annulus replicas showed cracking in multiple directions. It is possible that some of the circumferential cracking occurred when the paint separated from the annulus during the leak testing. This would not be seen in the Ginna paint since no leakage has occurred. The frequent cracking seen in the Ginna paint and replicas is most l01-iiinl i-an xymnve nFtlinvmnl rwr'lincy "nint" naincy annt rickarnrsninn SwRi Mockup 2011 Annulus Replica annulus with cracking after testing showing paint cracking at annulus Figure 5a Figure 5b Optical image 10x Optical Image of Replica 10x
Mls Replica i6ns from paint cpipping Figure 6a Figure 6b SwRi Annulus with paralell crack 2011 Annulus replica with paint micro cracking At high magnification, microcracking was seen in both the 2009 head paint and the 2011 annulus replicas. No electron microscope images of the actual SwRi Mock-up test paint were available; however, coupon samples of the paint used in the SwRi mockups (Carboline 300 plus zinc) were cycled between room temperature and 3500 F for 7 days. After 7 days cracking from thermal cycling was apparent.
Figure 7a, 7b, and 7c show electron microscope images of similar cracks in the 2009 head paint chip, the 2011 annulus paint replica, and the SwRi Carboline 300 paint after heat cycling.
Paint Cracks 7a 2009 Head Paint ChiD _ 1 7b 2011 Annulus Reolica Figures 7a, 7b, and 7c Magnification SOx
7
==
Conclusions:==
" The paint at the Ginna BMI annulus has the same micro-crack pattern as seen on the 2009 Ginna head paint samples.
" More multi-directional cracking was seen in the Ginna paint than in the Carboline 300 paint that failed to hold back leakage during the SwRi testing.
- Aging tests of the Carboline 300 paint used for the SwRi tests showed cracks after only seven days of thermal cycling. It is likely that the thermal cycling experienced at the Ginna annulus produced the fine micro-cracking and brittleness seen in the coating.
" The 2011 annulus replicas also show multiple areas where gaps in the paint allowed the replica material to penetrate into the annulus. It is likely that these areas will act as paths to the surface for leakage, if it is present.
References:
- 1. Page, Richard A. "Evaluation of Leakage and Deposit Formation in Painted Full-Scale BMI Mockups." Southwest Research Institute, 2011.
- 2. Kuchta, Maureen E. "Ginna Reactor Head Vessel Seal Bottom Head Paint Analysis", 2010.
8 Lower Head BMI Nozzle Locations Lower Head BMNIf Location May 13 1211 109 8 7 6 5 4 3 2 '1 L ..
H VESSEL 0" D -4I:
C
,---. I'l I TI I'l i - - 1 Replication of the BMI annuli was done at locations 77-1, 89-2, and 74-1.