Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20261F500 + (Reactor Core Isolation Cooling System Testability Circuits. Sheet A10)
- ML20261F506 + (Reactor Core Isolation Cooling System Testability Circuits. Sheet A11)
- ML20264A246 + (Reactor Core Isolation Cooling System Transient Test Points. Sheet A12)
- ML20261F511 + (Reactor Core Isolation Cooling System Transient Test Points. Sheet A12)
- ML20261F565 + (Reactor Core Isolation Cooling System Turbine Exhaust to Suppression Pool MOV F068. Sheet A22)
- ML20261F546 + (Reactor Core Isolation Cooling System Turbine Lube Oil Cooling Water Supply MOV F046. Sheet A18)
- ML20261F582 + (Reactor Core Isolation Cooling System Turbine Trip and Throttling Valve F510. Sheet A25)
- ML20261F598 + (Reactor Core Isolation Cooling System Vacuum Breaker Isolation MOV F078 (Inboard). Sheet A28)
- ML20261F593 + (Reactor Core Isolation Cooling System Vacuum Breaker Isolation MOV F077 (Outboard). Sheet A27)
- ML20261F588 + (Reactor Core Isolation Cooling System Waterleg Pump C003. Sheet A26)
- 05000324/LER-1981-083-03, Reactor Core Isolation Cooling Turbine Steam Supply Inboard Isolation Valve Closed. Caused by Spurious RCIC Isolation Logic Bus a Signal Due to Cold Solder Joint in Ambient Temp Switch.Switch Resoldered + (Reactor Core Isolation Cooling Turbine Steam Supply Inboard Isolation Valve Closed. Caused by Spurious RCIC Isolation Logic Bus a Signal Due to Cold Solder Joint in Ambient Temp Switch.Switch Resoldered)
- 05000397/LER-2003-008, Reactor Core Isolation Due to Inadvertent Closure of Containment Isolation Valve During Testing + (Reactor Core Isolation Due to Inadvertent Closure of Containment Isolation Valve During Testing)
- ML20134C992 + (Reactor Core Isolation Sys Reliability,1987-1993)
- ML19317G944 + (Reactor Core Physics Startup Rept Re Testing Performed During Startup & Initial Power Escalation for Cycle 2)
- ML19290D587 + (Reactor Core Safety Analysis Group:Records - Operating Reactor Data Base Sys & Application to Reactor Safety)
- ML19225C641 + (Reactor Core Safety Analysis Group:Using Fuel Performance to Determine Operating Limit Uncertainty Allowance, Interim Rept)
- RS-05-019, Reactor Core Shroud Repair Relief Request + (Reactor Core Shroud Repair Relief Request)
- ML20259D037 + (Reactor Core Spary Sys 40 Piping Isometric from External Isolation Valve to Reactor)
- ML20260K840 + (Reactor Core Spray P & I Diagram)
- ML20266H221 + (Reactor Core Spray P&I Diagram, as Built)
- ML20259D048 + (Reactor Core Spray Sys 81 & 81.1 Piping Isometric from Torus to Topping Pumps & from Topping Pumps to Ext Isolation Valves. Sheet 3)
- ML20259D044 + (Reactor Core Spray Sys 81 & 81.1 Piping Isometric from Torus to Topping Pumps to Ext Isolation Valves. Sheet 2)
- ML20266A333 + (Reactor Core Spray System 40 Piping Isometric from External Isolation Valve to Reactor)
- ML19221A219 + (Reactor Core Status Instrumentation Data Package)
- ML19093A563 + (Reactor Core Thermal Hydraulic Analysis Model Using LYNX1 and LYNX2 Computer Codes)
- RCF 21-01, Reactor Critical Facility Cy 2020 Operations Report + (Reactor Critical Facility Cy 2020 Operations Report)
- ML072210835 + (Reactor Critical Facility Relicensing Report)
- ML20266D559 + (Reactor D 20.Actual Drawing numbers:MC-2419-13.20-00, MC-2419-13.20-01 & MC-2419-13.20-02)
- ML20266D537 + (Reactor D 28.Actual Drawing Numbers:Mc 2419-13.20-00 & Mc 2419-13.20-02)
- ML20266D541 + (Reactor D 28.Actual Drawing Numbers:Mc 2419-13.20-00 & Mc 2419-13.20-03)
- ML20266D568 + (Reactor D 28.Actual Drawing number:2419-1302000.03)
- ML20266D591 + (Reactor D 28.Actual Drawing numbers:MC-2403-01.20-00 & MC-2403-01.20-01)
- ML20266D597 + (Reactor D 28.Actual Drawing numbers:MC2403-01.20-00, MC2403-01.20-01)
- ML20266D582 + (Reactor D 29.Actual Drawing Number:Mc 2403-01.20-00)
- ML20266D586 + (Reactor D 29.Actual Drawing Numbers:Mc 2403-01.20-00 & Mc 2403-01.20-01)
- ML20266D459 + (Reactor D-28.Actual Drawing numbers:MC-2419-13.20-00, MC-2419-13.20-01,MC-2419-13.20-02 & MC-2419-13.20-03)
- ML19224A987 + (Reactor Data for 790330-0404)
- ML18295A072 + (Reactor Decomissioning Dcisc and Dcdep Meetings October 2018)
- ML22361A102 + (Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities)
- ML19274C664 + (Reactor Decommissioning Current Issues - Bruce Watson 2019 National State Liaison Officer Conference Presentation)
- ML20034D203 + (Reactor Decommissioning Financial Assurance Working Group Webex Presentation for 2/5/2020)
- ML20120A551 + (Reactor Decommissioning Financial Assurance Working Group Forwarding Memo from Pholahan to Jlubinski)
- ML20100H261 + (Reactor Decommissioning Financial Assurance Working Group Webinar Presentation for 4/14/2020)
- ML20036D799 + (Reactor Decommissioning Financial Assurance Working Group Presentation for 2/10/2020 Winter Meeting of the National Association of Utility Regulatory Commissioners)
- ML20101H123 + (Reactor Decommissioning Financial Assurance Working Group Draft Final Report 4/10/2020)
- ML20037A284 + (Reactor Decommissioning Financial Assurance Working Group Webex Final Presentation for 2/5/2020)
- PMNS20200345, Reactor Decommissioning Financial Assurance Working Group + (Reactor Decommissioning Financial Assurance Working Group)
- ML20121A188 + (Reactor Decommissioning Financial Assurance Working Group Final Report)
- PMNS20200067, Reactor Decommissioning Financial Assurance Working Group Public Meeting + (Reactor Decommissioning Financial Assurance Working Group Public Meeting)
- ML13268A003 + (Reactor Decommissioning Process- Presentation for San Onofre 2&3 PSDAR Public Meeting)
- ML071240185 + (Reactor Decommissioning Program Lessons-Learned)