Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML14246A190 + (Proposed License Amendment Request, Clarification of Reactor Coolant System Heatup and Cooldown Technical Specification Figures)
- ML061510096 + (Proposed License Amendment Request, Consolidated Line Item Improvement Process Technical Specification Improvement Regarding Steam Generator Tube Integrity)
- ML071500145 + (Proposed License Amendment Request, Control Room Envelope Habitability in Accordance with TSTF-448, Revision 3, Using the Consolidated Line Item Improvement Process)
- ML082310330 + (Proposed License Amendment Request, Interim Alternate Repair Criteria (Iarc) for Steam Generator (SG) Tube Repair, Correction of Westinghouse Authorization Letter and Affidavit)
- ML081080044 + (Proposed License Amendment Request, Interim Alternate Repair Criteria (Iarc) for Steam Generator (SG) Tube Repair)
- ML073511682 + (Proposed License Amendment Request, One-Time Five-Year Extension to Type a Test Interval)
- ML073520247 + (Proposed License Amendment Request, One-time Risk-Informed Extension to the Completion Time for EDG Fuel Oil Storage Tank Recoating)
- ML082890529 + (Proposed License Amendment Request, Removal of Main Control Room Bottled Air System Requirements)
- ML082050360 + (Proposed License Amendment Request, Response to Request for Additional Information One-Time Risk-Informed Extension to the Completion Time for Edf Fuel Oil Storage Tank Recoating)
- ML092730468 + (Proposed License Amendment Request, TS 3.7.12 - ECCS Pump Room Exhaust Air Cleanup System (Preacs) Addition of Conditions/Action Statements)
- ML17317A464 + (Proposed License Amendment Request, Temporary, One Time 21-Day Allowed Outage Time for Replacement of Reserve Station Service Transformer C and Associated Cabling)
- ML20338A542 + (Proposed License Amendment Request, Update of the Loss of Coolant Accident Alternate Source Term Dose Analysis)
- ML20034F053 + (Proposed License Amendment Request: Allowed Outage Time Extension for Replacement of Reserve Station Service Transformer C 5KV Cables to Transfer Bus F Response to Request for Clarification and Additional Information)
- ML20105A223 + (Proposed License Amendment Request: One-Time Deferral of Surry Unit 2 Steam Generator B Inspection)
- ML20274A329 + (Proposed License Amendment Request: Revise Reactor Core Safety Limit to Reflect WCAP-17642-P-A, Revision 1)
- EPID:L-2021-LLA-0011 + (Proposed License Amendment Request: Revise Reactor Core Safety Limit to Reflect WCAP-17642-P-A, Revision 1)
- ML19309D199 + (Proposed License Amendment Request: Temporary, One Time 14-Day Allowed Outage Time for Replacement of Reserve Station Service Transformer C 5KV Cables to Transfer Bus F)
- EPID:L-2019-LLA-0244 + (Proposed License Amendment Request: Temporary, One Time 14-Day Allowed Outage Time for Replacement of Reserve Station Service Transformer C 5KV Cables to Transfer Bus F)
- ML19269B775 + (Proposed License Amendment Request: Update of Reactor Coolant System Heatup and Cooldown Pressure-Temperature Limitations Figures for Subsequent License Renewal)
- EPID:L-2019-LLA-0206 + (Proposed License Amendment Request: Update of Reactor Coolant System Heatup and Cooldown Pressure-Temperature Limitations Figures for Subsequent License Renewal)
- ML15021A128 + (Proposed License Amendment Requests to Adopt TSTF-523, Revision 2, Generic Letter 2008-01, Managing Gas Accumulation)
- ML25136A297 + (Proposed License Amendment Requests to Update Main Steam Line Break Alternative Source Term Dose Consequences Analyses)
- NLS2002064, Proposed License Amendment Revision to Operating License, Section 2.C.(4), Fire Protection + (Proposed License Amendment Revision to Operating License, Section 2.C.(4), Fire Protection)
- L-2004-287, Proposed License Amendment Second Request for Additional Information Response WCAP-9272 Reload Methodology and Implementing 30% Steam Generator Tube Plugging Limit + (Proposed License Amendment Second Request for Additional Information Response WCAP-9272 Reload Methodology and Implementing 30% Steam Generator Tube Plugging Limit)
- L-2006-094, Proposed License Amendment Steam Generator Tube Integrity Pursuant to 10 CFR 50.90 + (Proposed License Amendment Steam Generator Tube Integrity Pursuant to 10 CFR 50.90)
- L-2006-089, Proposed License Amendment Steam Generator Tube Integrity + (Proposed License Amendment Steam Generator Tube Integrity)
- L-2006-077, Proposed License Amendment Submitted January 20, 2005 - Withdrawal of Technical Specification Changes Associated with TSTF-95 + (Proposed License Amendment Submitted January 20, 2005 - Withdrawal of Technical Specification Changes Associated with TSTF-95)
- L-2005-158, Proposed License Amendment Submitted January 20, 2005 Withdrawal of Technical Specification Changes Associated with TSTF-101 + (Proposed License Amendment Submitted January 20, 2005 Withdrawal of Technical Specification Changes Associated with TSTF-101)
- L-2005-202, Proposed License Amendment Supplement Re Containment Leakage Rate Program One-Time Type a Test Interval Extension + (Proposed License Amendment Supplement Re Containment Leakage Rate Program One-Time Type a Test Interval Extension)
- L-2005-007, Proposed License Amendment Third Request for Additional Information Supplement WCAP-9272 Reload Methodology and WCAP-9272 Reload Methodology and Implementing 30% Steam Generator Tube Plugging Limit + (Proposed License Amendment Third Request for Additional Information Supplement WCAP-9272 Reload Methodology and WCAP-9272 Reload Methodology and Implementing 30% Steam Generator Tube Plugging Limit)
- L-2007-198, Proposed License Amendment Update PT Curve and LTOP for 55 EFPY + (Proposed License Amendment Update PT Curve and LTOP for 55 EFPY)
- L-2006-001, Proposed License Amendment Withdrawal Reactor Protection System Technical Specification Changes + (Proposed License Amendment Withdrawal Reactor Protection System Technical Specification Changes)
- ML11329A003 + (Proposed License Amendment and Exemption Request for Use of Optimized ZIRLO Rod Cladding)
- ML14112A072 + (Proposed License Amendment and Exemption Request for the Use of M5 Fuel Rod Cladding)
- NL-14-001, Proposed License Amendment for Alternate Repair Criteria for Steam Generator Tube Inspection and Repair + (Proposed License Amendment for Alternate Repair Criteria for Steam Generator Tube Inspection and Repair)
- PLA-6172, Proposed License Amendment for Constant Pressure Power Uprate - Supplement PLA-6172 + (Proposed License Amendment for Constant Pressure Power Uprate - Supplement PLA-6172)
- NRC-02-0017, Proposed License Amendment for Deletion of Three Obsolete License Conditions and the Reporting Requirements in the Operating License + (Proposed License Amendment for Deletion of Three Obsolete License Conditions and the Reporting Requirements in the Operating License)
- NRC-03-0007, Proposed License Amendment for Implementation of Alternative Radiological Source Term Methodology + (Proposed License Amendment for Implementation of Alternative Radiological Source Term Methodology)
- ML15085A135 + (Proposed License Amendment for Indian Point Unit 2 Regarding Technical Specification 3.1.4, Reactivity Control Systems)
- NRC-02-0062, Proposed License Amendment for Participation in the BWRVIP ISP Plan for RPV Material Surveillance + (Proposed License Amendment for Participation in the BWRVIP ISP Plan for RPV Material Surveillance)
- ML022760014 + (Proposed License Amendment for Revision of Control Room Emergency Filtration System TS Surveillance Requirements Regarding Unfiltered Inleakage)
- NRC-03-0009, Proposed License Amendment for Revision of TS Section 5.5.10, TS Bases Control Program to Be Consistent with Revised 10 CFR 50.59 + (Proposed License Amendment for Revision of TS Section 5.5.10, TS Bases Control Program to Be Consistent with Revised 10 CFR 50.59)
- ML022910105 + (Proposed License Amendment for Unit 2 Reactor Coolant System Cold Leg Elbow Tap Flow Coefficients)
- PLA-6230, Proposed License Amendment for Units 1 and 2, Extended Power Uprate Application & Supplement to Request for Additional Information Responses + (Proposed License Amendment for Units 1 and 2, Extended Power Uprate Application & Supplement to Request for Additional Information Responses)
- ML041130095 + (Proposed License Amendment for a Limited Scope Application of the Alternate Source Term (NUREG-1465) for Re-evaluation of the Fuel Handling Accident Dose Consequences)
- ML043650060 + (Proposed License Amendment for a Limited Scope Application of the Alternate Source Term (NUREG-1465) for Re-evaluation of the Fuel Handling Accident Dose Consequences, Rev. 1)
- JPN-02-016, Proposed License Amendment for a Limited Scope Application of the Alternate Source Term Guidelines in NUREG-1465 Related to the Re-Evaluation of the Fuel Handling Dose Consequences + (Proposed License Amendment for a Limited Scope Application of the Alternate Source Term Guidelines in NUREG-1465 Related to the Re-Evaluation of the Fuel Handling Dose Consequences)
- NRC-02-0040, Proposed License Amendment for a One-Time Deferral of the Primary Containment Integrated Leak Rate Test + (Proposed License Amendment for a One-Time Deferral of the Primary Containment Integrated Leak Rate Test)
- NRC-04-0043, Proposed License Amendment for the Addition of a License Condition and Deletion of Control Room Emergency Filtration System Technical Specification Surveillance Requirement 3.7.3.6 + (Proposed License Amendment for the Addition of a License Condition and Deletion of Control Room Emergency Filtration System Technical Specification Surveillance Requirement 3.7.3.6)
- NRC-03-0064, Proposed License Amendment for the Deferral of Control Room Emergency Filtration System Technical Specification Surveillance Requirement 3.7.3.6 + (Proposed License Amendment for the Deferral of Control Room Emergency Filtration System Technical Specification Surveillance Requirement 3.7.3.6)
- NRC-02-0034, Proposed License Amendment for the Revision of Control Room Emergency Filtration System Technical Specification Requirements During Movement of Recently Irradiated Fuel + (Proposed License Amendment for the Revision of Control Room Emergency Filtration System Technical Specification Requirements During Movement of Recently Irradiated Fuel)