Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20031C701 + (Probability of Pipe Fracture in the Primary Coolant LOOP of PWR Plant.Volume 7:Sustem Failure Probability Analysis)
- ML20031D160 + (Probability of Pipe Fracture in the Primary Coolant LOOP of a PWR Plant.Pipe Fracture Indirectly Induced by an Earthquake)
- ML20010C797 + (Probability of Pipe Fracture in the Primary Coolant LOOP of a PWR Plant.Volume 5:Probabilistic Fracture Mechanics Analysis)
- ML20010C796 + (Probability of Pipe Fracture in the Primary Coolant LOOP of a PWR Plant.Volume 3:Nonseismic Stress Analysis)
- ML20010H170 + (Probability of Pipe Fracture in the Primary Coolant LOOP of a PWR Plant.Volume 4:Seismic Response Analysis)
- ML20058J701 + (Probability of Vessel Failure from PTS Events & USNRC Requirements)
- ML20151H047 + (Probable Local Precedent for Earthquakes of Magnitude 8 or 9 in Pacific Northwest, Presented at 880412-15 Meeting in Olympia,Wa)
- ENS 44870 + (Probable Loss of 3.3 Mci C-14 in Transit)
- ML20349L132 + (Probable Max Flood Hydrograph Valley Storage Not Considered at River Mile 151.1)
- ML19282C877 + (Probable Max Flood from Canon De Marquez Watershed for Designing U Tailings Impoundment Drainage Diversion Sys, Marquez,Nm,Bokum Resources Corp)
- ML20349L153 + (Probable Maximum Flood Hydrograph Valley Storage Considered at River Mile 151.1)
- ML20261B549 + (Probable Maximum Flood:Curbs,Grading & Paving West Plant Area)
- ML20261B591 + (Probable Maximum Flood:General Plan)
- ML14134A437 + (Probable Maximum Flood:Grading and Drainage North Plant Area)
- ML20261B554 + (Probable Maximum Flood:Grading,Paving & Curbs South Plant Area)
- ML20202G126 + (Probable Maximum Precipitation - Pmp)
- 0CAN091401, Probable Maximum Precipitation and Local Intense Precipitation Analysis for Arkansas Nuclear One + (Probable Maximum Precipitation and Local Intense Precipitation Analysis for Arkansas Nuclear One)
- Information Notice 1998-10, Probable Misadministrations Occurring During Intravascular Brachytherapy with Novoste Beta-cath System + (Probable Misadministrations Occurring During Intravascular Brachytherapy with Novoste Beta-cath System)
- ML20062H484 + (Probablistic Analysis to Verify Adequacy of Midland Plant Tornado Missile Protection)
- ML19345C296 + (Probablistic Assessment of Containment Inerting in BWRs)
- ML20206B988 + (Probablistic Risk Assessment & Nuclear Waste Transportation:Case Study of Use of Radtran in 1986 Environ Assessment for Yucca Mountain)
- ML20128L036 + (Probablistic Safety Study, Vols 1-4.W/78 Oversize Drawings.Aperture Cards Available in PDR)
- ML20246G081 + (Probablistic Seismic Hazard Analysis)
- ML19211D473 + (Probablistic Whole Core Damage Analysis Using Ssyst Fuel Behavior Code)
- ML20035B779 + (Probalistic Risk Perspective of Steam Generator Tube Structural Integrity Issue Re Interim Steam Generator Tube Plugging Criteria for Catawba Nuclear Station)
- ML20266B925 + (Probe Assembly)
- ML20262G247 + (Probe Support Clamp.Sheet 1 of 1)
- ML20262G262 + (Probe Upper Density Assembly.Sheet 1 of 1)
- ML20262G287 + (Probe Upper Xrf.Sheet 1 of 1)
- ML20262C590 + (Problem 0600104-13-03:Pressurizer Relief Sys)
- ML20262C598 + (Problem 0600104-13-03:Pressurizer Relief System)
- ML20262C607 + (Problem 0600154-13-03:Pressurizer Relief System)
- ML20262C629 + (Problem 0600154-13-03:Pressurizer Relief System)
- ML20262C617 + (Problem 0600154-13-03:Pressurizer Relief System)
- ML20262C622 + (Problem 0600154-13-03:Pressurizer Relief System)
- ML070040367 + (Problem 3 Memo Establishing DPO Panel)
- ML20062L351 + (Problem 4,Piping Benchmark Problems,NUREG/CR-1677, BNL-NUREG-51267,Vol 1)
- ML20137N327 + (Problem Analysis 000-NSP-8302, Uncompensated Ion Chamber Connector Labeling Change)
- ML13092A343 + (Problem Evaluation Report (Per), Per 930397, Overvoltage Condition on 6.9 Kv Shutdown Boards, Dated October 8, 1995)
- ML051730146 + (Problem Identification & Resolution (Pi&R) Inspection Request Letter)
- ML21211A152 + (Problem Identification & Resolution Inspection Document Request)
- 05000266/FIN-2000006-02 + (Problem Identification and Resolution)
- 05000334/FIN-2000005-02 + (Problem Identification and Resolution)
- ML20006F215 + (Problem Identification and Resolution)
- ML043010140 + (Problem Identification and Resolution (Pi&R) Inspection. Request Letter to Licensee)
- ML16145A040 + (Problem Identification and Resolution 3/16/2016 Exit Presentation)
- IR 05000333/2020011 + (Problem Identification and Resolution Annual Sample Inspection Report 05000333/2020011)
- IR 05000387/2017405 + (Problem Identification and Resolution Cyber Security Inspection Report 05000387/2017405 and 05000388/2017405 (Cover Letter))
- IR 05000220/2016405 + (Problem Identification and Resolution Cyber Security Inspection Report 05000220/2016405 and 05000410/2016405)
- IR 05000317/2017404 + (Problem Identification and Resolution Cyber Security Inspection Report 05000317/2017404 and 05000318/2017404)
- IR 05000219/2017404 + (Problem Identification and Resolution Cyber Security Inspection Report 05000219/2017404 (Cover Letter))