Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "PFHA2019-3B-2-Flood Penetration Seals Tests-Cummings-FRM". Since there have been only a few results, also nearby values are displayed.

Showing below up to 26 results starting with #1.

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML19156A452  + (PFHA2019-1B-1-NWS Storm Surge Ensemble Guidance-ATaylor-NWS)
  • ML19156A453  + (PFHA2019-1B-2-Advancements in Probabilistic Storm Surge Models and Uncertainty Quantification Using Gaussian Process Metamodeling-NNadalCaraballo-VGonzalez-USACE)
  • ML19156A454  + (PFHA2019-1B-3-Probabilistic Flood Hazard Assessment Using the Joint Probability Method for Hurricane Storm Surge-MSalisbury-EPRI)
  • ML19156A455  + (PFHA2019-1B-4-Assessment of Epistemic Uncertainty for Probabilistic Storm Surge Hazard Assessment Using a Logic Tree Approach-BWang-GZA)
  • ML19156A456  + (PFHA2019-1C-1-Satellite Precipitation Estimates Gpm and Extremes-GHuffman-NASA)
  • ML19156A458  + (PFHA2019-1C-3-Reanalysis Datasets Hydrologic Hazards Analysis-Caldwell-USACE)
  • ML19156A460  + (PFHA2019-1C-4-Current Capabilities for Developing Watershed Precipitation-Frequency Relationships-MSchaefer-MGSEng)
  • ML19156A461  + (PFHA2019-1C-5-Factors Affecting the Development of Precipitation Areal Reduction Factors-SKao-ORNL)
  • ML19156A462  + (PFHA2019-2A-1-Using HEC-WAT to Evaluate Watershed Level Systems Based risk-WLehman-USACE)
  • ML19156A463  + (PFHA2019-2A-2-Global Sensitivity Analysis Applied to Riverine Flood modeling-CDuluc-IRSN)
  • ML19156A464  + (PFHA2019-2A-4-Bulletin 17C Flood Frequency and Extrapolations for Dams and Nuclear Facilities-JEngland-USACE)
  • ML19156A465  + (PFHA2019-2A-5-Riverine Paleoflood Analyses in Risk-Informed Decision Making-KKelson-USACE)
  • ML19156A466  + (PFHA2019-2A-6-Flood Frequency Analysis of the Tennessee River-THarden-USGS)
  • ML19156A467  + (PFHA2019-2B-1-Structured Hazard Assessment Committee Process for Flooding SHACF-RPrasad-PNNL)
  • ML19156A468  + (PFHA2019-2B-2-Overview of the TVA PFHA Calculation System-SCarney-RTIforTVA)
  • ML19156A469  + (PFHA2019-2B-3-Development of Risk-Informed Safety Margin Characterization Framework for Flooding of Nuclear Power plants-PBardet-GWU-INL)
  • ML19156A470  + (PFHA2019-2C-2-Methods for Estimating Joint Probabilities of Coincident and Correlated Flooding Mechanisms for Nuclear Power Plant Flood Hazard Assessments-MBensi-SMohammadi-UMD)
  • ML19156A471  + (PFHA2019-2C-4-Current State-of-Practice in Dam Risk Assessment-DeNeale-ORNL)
  • ML19156A472  + (PFHA2019-2C-5-Hurricane Harvey Highlights the Challenge of Estimating Probable Maximum Precipitation-SKao-ORNL)
  • ML19156A473  + (PFHA2019-2C-6-Uncertainty and Sensitivity Analysis for Hydraulic Models with Dependent inputs-LPheulpin_IRSN)
  • ML19156A474  + (PFHA2019-2C-7-Development of Hydrologic Hazard Curves Using Sefm for Assessing Hydrologic Risks at Rhinedollar Dam Ca_Bbarker_Mgseng)
  • ML19156A475  + (PFHA2019-3A-1-Hydroclimatic Extremes Trends and Projections a View from the Fourth National Climate Assessment-KKunkel-UNC)
  • ML19156A476  + (PFHA2019-3A-2-Regional Climate Change Projections -Potential Impacts to Nuclear Facilities-LRubyLeung-PNNL)
  • ML19156A477  + (PFHA2019-3A-3-The Roles of Climate Change and Climate Variability in the 2017 Atlantic Hurricane Season-YLim-NASA)
  • ML19156A478  + (PFHA2019-3B-1-Penetration Seals Risk Ranking Process-MRandelovic RSchnieder-EPRI)
  • ML19156A479  + (PFHA2019-3B-2-Flood Penetration Seals Tests-Cummings-FRM)
  • ML19156A480  + (PFHA2019-3B-3-Breach Modeling with Windam & DLBreach-TWahl-USBR)
  • ML19156A481  + (PFHA2019-3C-1-PRA Walkdown Guidance-AMiller-JensenHughes-MRandelovic-EPRI)
  • ML19156A482  + (PFHA2019-3C-2-Revision of Xfpra standard-PFHA2019-MBensi-UMD)
  • ML19156A483  + (PFHA2019-3C-3-ANS2.8 Probabilistic Evaluation of External Flood Hazards for Nuclear Facilities Working Group Status-RSchneider-Westinghouse)
  • ML19156A484  + (PFHA2019-3C-4-Qualitative PRA Insights from Operational Events-IGifford-NRC)
  • ML19156A448  + (PFHA2019-Final-Agenda)
  • ML19156A447  + (PFHA2019-Final_Abstracts)
  • ML20198Q962  + (PG&E - Trojan - 1986 Snubber Valve Failure Analysis)
  • ML20235B279  + (PG&E 1961 Annual Rept)
  • ML20235B290  + (PG&E 1962 Annual Rept)
  • ML20148Q328  + (PG&E 1987 Annual Rept)
  • ML20035A744  + (PG&E 1992 Financial Info)
  • ML20204H433  + (PG&E Annual Rept for 1986)
  • ML20235J154  + (PG&E Answer in Opposition to Intervenor Motion to Admit late-filed Contention.* Board Requested to Direct NRC Staff to Prepare EIS Re Issues Discussed in Generic Issue 82. Certificate of Svc Encl)
  • ML20236E003  + (PG&E Answer in Opposition to Sierra Club Request for Stay.* Util Lists Four Arguments Opposing Request for Stay,Issued by ASLB on 870911,re Util Amends to Increase Spent Fuel Storage Capacity.Affidavit & Certificate of Svc Encl)
  • ML20235R961  + (PG&E Answer in Opposition to Sierra Club Request for Stay.* Sierra Club 870924 Request for Stay of 870911 ASLB Initial Decision (LBP-87-25) Authorizing Spent Fuel Pool Reracking Amends Should Be Denied)
  • ML20235A582  + (PG&E Bodega Bay Reactor, Summarizing 630717 Visit to Proposed Site)
  • ML20236V047  + (PG&E Brief in Response to Sierra Club Appeal of Licensing Board 870902 Order & 870911 Initial Decision.* Brief Contests Argument That Licensing Board Erred in Refusing to Admit late-filed Contention.Certificate of Svc Encl)
  • ML20036A663  + (PG&E Co Initial Response to Questions for Parties.* Util Believes Written Answers Prior to Conference Will Be Beneficial to Licensing Board & Parties)
  • ML20214A994  + (PG&E Comments on Electronic Storage & Retrieval of Documents Per ASLBP Order Dtd 870430.* Util Believes That There Should Be Individual of Board Staff Assigned Specifically to Task of Controlling Such Access & Use.W/Certificate of Svc)
  • DCL-05-027, PG&E Corporation 2004 Annual Report  + (PG&E Corporation 2004 Annual Report)
  • DCL-2006-522, PG&E Diablo Canyon Power Plant (DCPP) Submittal - Receiving Water Monitoring Program 2005 Annual Report  + (PG&E Diablo Canyon Power Plant (DCPP) Submittal - Receiving Water Monitoring Program 2005 Annual Report)
  • DCL-2004-539, PG&E Diablo Canyon Power Plant (Dcpp), Submittal - Receiving Water Monitoring Program 2003 Annual Report  + (PG&E Diablo Canyon Power Plant (Dcpp), Submittal - Receiving Water Monitoring Program 2003 Annual Report)
  • DCL-2014-519, PG&E Diablo Canyon Power Plant - Receiving Water Monitoring Program 2013 Annual Report  + (PG&E Diablo Canyon Power Plant - Receiving Water Monitoring Program 2013 Annual Report)
  • ML13154A047  + (PG&E Document, Scm 36-01, Revision 1, Process Protection System Replacement Software Configuration Management Plan (Scmp), Enclosure, Attachment 1)