- ML19156A452 + (PFHA2019-1B-1-NWS Storm Surge Ensemble Guidance-ATaylor-NWS)
- ML19156A453 + (PFHA2019-1B-2-Advancements in Probabilistic Storm Surge Models and Uncertainty Quantification Using Gaussian Process Metamodeling-NNadalCaraballo-VGonzalez-USACE)
- ML19156A454 + (PFHA2019-1B-3-Probabilistic Flood Hazard Assessment Using the Joint Probability Method for Hurricane Storm Surge-MSalisbury-EPRI)
- ML19156A455 + (PFHA2019-1B-4-Assessment of Epistemic Uncertainty for Probabilistic Storm Surge Hazard Assessment Using a Logic Tree Approach-BWang-GZA)
- ML19156A456 + (PFHA2019-1C-1-Satellite Precipitation Estimates Gpm and Extremes-GHuffman-NASA)
- ML19156A458 + (PFHA2019-1C-3-Reanalysis Datasets Hydrologic Hazards Analysis-Caldwell-USACE)
- ML19156A460 + (PFHA2019-1C-4-Current Capabilities for Developing Watershed Precipitation-Frequency Relationships-MSchaefer-MGSEng)
- ML19156A461 + (PFHA2019-1C-5-Factors Affecting the Development of Precipitation Areal Reduction Factors-SKao-ORNL)
- ML19156A462 + (PFHA2019-2A-1-Using HEC-WAT to Evaluate Watershed Level Systems Based risk-WLehman-USACE)
- ML19156A463 + (PFHA2019-2A-2-Global Sensitivity Analysis Applied to Riverine Flood modeling-CDuluc-IRSN)
- ML19156A464 + (PFHA2019-2A-4-Bulletin 17C Flood Frequency and Extrapolations for Dams and Nuclear Facilities-JEngland-USACE)
- ML19156A465 + (PFHA2019-2A-5-Riverine Paleoflood Analyses in Risk-Informed Decision Making-KKelson-USACE)
- ML19156A466 + (PFHA2019-2A-6-Flood Frequency Analysis of the Tennessee River-THarden-USGS)
- ML19156A467 + (PFHA2019-2B-1-Structured Hazard Assessment Committee Process for Flooding SHACF-RPrasad-PNNL)
- ML19156A468 + (PFHA2019-2B-2-Overview of the TVA PFHA Calculation System-SCarney-RTIforTVA)
- ML19156A469 + (PFHA2019-2B-3-Development of Risk-Informed Safety Margin Characterization Framework for Flooding of Nuclear Power plants-PBardet-GWU-INL)
- ML19156A470 + (PFHA2019-2C-2-Methods for Estimating Joint Probabilities of Coincident and Correlated Flooding Mechanisms for Nuclear Power Plant Flood Hazard Assessments-MBensi-SMohammadi-UMD)
- ML19156A471 + (PFHA2019-2C-4-Current State-of-Practice in Dam Risk Assessment-DeNeale-ORNL)
- ML19156A472 + (PFHA2019-2C-5-Hurricane Harvey Highlights the Challenge of Estimating Probable Maximum Precipitation-SKao-ORNL)
- ML19156A473 + (PFHA2019-2C-6-Uncertainty and Sensitivity Analysis for Hydraulic Models with Dependent inputs-LPheulpin_IRSN)
- ML19156A474 + (PFHA2019-2C-7-Development of Hydrologic Hazard Curves Using Sefm for Assessing Hydrologic Risks at Rhinedollar Dam Ca_Bbarker_Mgseng)
- ML19156A475 + (PFHA2019-3A-1-Hydroclimatic Extremes Trends and Projections a View from the Fourth National Climate Assessment-KKunkel-UNC)
- ML19156A476 + (PFHA2019-3A-2-Regional Climate Change Projections -Potential Impacts to Nuclear Facilities-LRubyLeung-PNNL)
- ML19156A477 + (PFHA2019-3A-3-The Roles of Climate Change and Climate Variability in the 2017 Atlantic Hurricane Season-YLim-NASA)
- ML19156A478 + (PFHA2019-3B-1-Penetration Seals Risk Ranking Process-MRandelovic RSchnieder-EPRI)
- ML19156A479 + (PFHA2019-3B-2-Flood Penetration Seals Tests-Cummings-FRM)
- ML19156A480 + (PFHA2019-3B-3-Breach Modeling with Windam & DLBreach-TWahl-USBR)
- ML19156A481 + (PFHA2019-3C-1-PRA Walkdown Guidance-AMiller-JensenHughes-MRandelovic-EPRI)
- ML19156A482 + (PFHA2019-3C-2-Revision of Xfpra standard-PFHA2019-MBensi-UMD)
- ML19156A483 + (PFHA2019-3C-3-ANS2.8 Probabilistic Evaluation of External Flood Hazards for Nuclear Facilities Working Group Status-RSchneider-Westinghouse)
- ML19156A484 + (PFHA2019-3C-4-Qualitative PRA Insights from Operational Events-IGifford-NRC)
- ML19156A448 + (PFHA2019-Final-Agenda)
- ML19156A447 + (PFHA2019-Final_Abstracts)
- ML20198Q962 + (PG&E - Trojan - 1986 Snubber Valve Failure Analysis)
- ML20235B279 + (PG&E 1961 Annual Rept)
- ML20235B290 + (PG&E 1962 Annual Rept)
- ML20148Q328 + (PG&E 1987 Annual Rept)
- ML20035A744 + (PG&E 1992 Financial Info)
- ML20204H433 + (PG&E Annual Rept for 1986)
- ML20235J154 + (PG&E Answer in Opposition to Intervenor Motion to Admit late-filed Contention.* Board Requested to Direct NRC Staff to Prepare EIS Re Issues Discussed in Generic Issue 82. Certificate of Svc Encl)
- ML20236E003 + (PG&E Answer in Opposition to Sierra Club Request for Stay.* Util Lists Four Arguments Opposing Request for Stay,Issued by ASLB on 870911,re Util Amends to Increase Spent Fuel Storage Capacity.Affidavit & Certificate of Svc Encl)
- ML20235R961 + (PG&E Answer in Opposition to Sierra Club Request for Stay.* Sierra Club 870924 Request for Stay of 870911 ASLB Initial Decision (LBP-87-25) Authorizing Spent Fuel Pool Reracking Amends Should Be Denied)
- ML20235A582 + (PG&E Bodega Bay Reactor, Summarizing 630717 Visit to Proposed Site)
- ML20236V047 + (PG&E Brief in Response to Sierra Club Appeal of Licensing Board 870902 Order & 870911 Initial Decision.* Brief Contests Argument That Licensing Board Erred in Refusing to Admit late-filed Contention.Certificate of Svc Encl)
- ML20036A663 + (PG&E Co Initial Response to Questions for Parties.* Util Believes Written Answers Prior to Conference Will Be Beneficial to Licensing Board & Parties)
- ML20214A994 + (PG&E Comments on Electronic Storage & Retrieval of Documents Per ASLBP Order Dtd 870430.* Util Believes That There Should Be Individual of Board Staff Assigned Specifically to Task of Controlling Such Access & Use.W/Certificate of Svc)
- DCL-05-027, PG&E Corporation 2004 Annual Report + (PG&E Corporation 2004 Annual Report)
- DCL-2006-522, PG&E Diablo Canyon Power Plant (DCPP) Submittal - Receiving Water Monitoring Program 2005 Annual Report + (PG&E Diablo Canyon Power Plant (DCPP) Submittal - Receiving Water Monitoring Program 2005 Annual Report)
- DCL-2004-539, PG&E Diablo Canyon Power Plant (Dcpp), Submittal - Receiving Water Monitoring Program 2003 Annual Report + (PG&E Diablo Canyon Power Plant (Dcpp), Submittal - Receiving Water Monitoring Program 2003 Annual Report)
- DCL-2014-519, PG&E Diablo Canyon Power Plant - Receiving Water Monitoring Program 2013 Annual Report + (PG&E Diablo Canyon Power Plant - Receiving Water Monitoring Program 2013 Annual Report)
- ML13154A047 + (PG&E Document, Scm 36-01, Revision 1, Process Protection System Replacement Software Configuration Management Plan (Scmp), Enclosure, Attachment 1)