Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- 05000305/FIN-2003008-01 + (NON-CITED Violation of 10 CFR 50.59, for the Failure to Perform a Written Evaluation, as Required, for a Modification to the Component Cooling Water System)
- 05000266/FIN-2012003-02 + (NON-COMPLIANCEWITH 10 CFR 20.1701 to Control the Concentration of Radioactive Material in Air and Ensure That Radiological Airborne Hazards Would Be Minimized in the Technical Support Center During a DESIGN-BASIS Accident)
- ML20073P766 + (NON-CONDENSIBLE Gas Fraction Predictions at Elevated Temperatures and Pressure Using Wet and Dry Bulb Temperature Measurements)
- 05000483/FIN-2008008-02 + (NON-CONSERVATIVE Pipe Break Location for the Condensate Storage Tank Supply to Auxiliary Feedwater Pumps)
- 05000361/FIN-2012007-08 + (NON-CONSERVATIVE THERMAL-HYDRAULIC Model Results)
- 05000285/FIN-2013008-04 + (NON-CONSERVATIVE Value for Declaring an Alert on LOW River Level)
- ENS 55576 + (NON-FUNCTIONAL Steam Supply Check Valve to Turbine Driven Auxiliary Feedwater Pump)
- ENS 55398 + (NON-LICENSED Supervisory Personnel Violated FFD Policy)
- ENS 57933 + (NON-LICENSEE in Possession of Licensed Material)
- ML20049H542 + (NON-LOCA TR SE Final Redacted (Public))
- ML20042E039 + (NON-LOCA Topical Report Phases 3 and 4 Audit Report)
- ENS 56927 + (NON-POWER Reactor - Administrative Tech Spec Violation)
- ENS 57948 + (NON-POWER Reactor - Unplanned HIGH-POWER Trip)
- ML20086C220 + (NON-POWER Reactor Operator Licensing Examiner Standards)
- ML20071L483 + (NON-POWER Reactor Operator Licensing Examiner Standards)
- ML19190A291 + (NON-PROP Attachment 1 - Resolution of Comments Final Safety Evaluation for Westinghouse Electric Company Topical Report WCAP-15942-P-A/WCAP-15492-NP-A, Supplement 1, Revision 1, Material Changes for SVEA-96 Optima2 Fuel Assemblies)
- ML25174A182 + (NON-PROP: Enclosure 2 - Modeling and Simulation Activities Related to Source Term for Imsr Design Basis Accidents)
- ML16320A080 + (NON-PROPRIETARY - Safety Evaluation by NRR Related to Indirect Transfer of Renewed Operating Licenses from Talen Energy Corporation to Riverstone Holdings, LLC for the Susquehanna Steam Electric Station, Units 1 and 2)
- ML21245A267 + (NON-PROPRIETARY - Sequoyah Nuclear Plant, Units 1 and 2 - Issuance of Amendment Nos. 356 and 349 Regarding the Transition to Westinghouse Robust Fuel Assembly-2 (RFA-2) Fuel)
- ML16353A004 + (NON-PROPRIETARY Millstone Power Station, Unit No. 2 - Safety Evaluation for Amendment No. 332 Realistic Large Break Loss of Coolant Accident Analysis (Redacted))
- ML24332A026 + (NON-PROPRIETARY RAI 10444-R1-FINAL-REDACTED Westinghouse Topical Report WCAP-18850-P/NP, Adaptation of the Full Spectrum LOCA (Fsloca) Evaluation Methodology to Perform Analysis of Cladding Rupture for High Burnup Fuel EPID L-2024-NTR-0005)
- ML19219A191 + (NON-PROPRIETARY, Regulatory Audit Summary Regarding License Amendment Request to Utilize Tvel TVS-K Lead Test Assemblies)
- 05000341/FIN-2007006-07 + (NON-QUALIFIED TY-WRAPS Inside Primary Containment)
- ML20041G019 + (NONSAP-C:A Nonlinear Stress Analysis Program for Concrete Containments Under Static,Dynamic,And LONG-TERM Loadings)
- ML20150E994 + (NONSAP-C:A Nonlinear Stress Analysis Program for Concrete Containments Under Static,Dynamic, & Long-term Loadings)
- ML20127K805 + (NOODLE-Multi-Dimensional Two-Group Reactor Simulator)
- ML20214B747 + (NOP-1-640, Fitness for Duty)
- ML061160369 + (NOP-LP-2001-01 Condition Report, Officer Inallentive to Duty, CR Number 03-02794)
- ML061250091 + (NOP-LP-2001-01 Condition Report, Security Human Performance Not Meeting Improvement Expectations, CR Number 04-06493)
- ML20217R336 + (NOV & Proposed Imposition of Civil Penalty in Amount of $55,000.Violation Noted:Measures Were Not Established to Assure That Applicable Regulatory Requirements & Design Basis,Were Correctly Translated Into EOPs)
- NOV Followup Inspection (Arkansas Nuclear 2019) + (NOV Followup)
- NOV Followup Inspection (Browns Ferry 2019) + (NOV Followup)
- NOV Followup Inspection (Grand Gulf 2019) + (NOV Followup)
- NOV Followup Inspection (River Bend 2019) + (NOV Followup)
- NOV Followup Inspection (Sequoyah 2019) + (NOV Followup)
- NOV Followup Inspection (Waterford 2019) + (NOV Followup)
- NOV Followup Inspection (Watts Bar 2019) + (NOV Followup)
- ML24130A196 + (NOV Shepherd Power Presentation Slides - May 14 2024 Public Meeting)
- ML20133E683 + (NOV for Grandin Testing Lab,Inc from 961030 Insp & Investigation & Proposed Imposition of Civil Penalty in Amount of $2,500.Violation Noted:Licensee Performed Unauthorized Byproduct Matl Activities)
- ML20198P056 + (NOV from Insp Completed on 971113.Violation Noted:Licensee Failed to Promptly Correct Condition Adverse to Quality Re Unit 1 High Drywell Temp Condition)
- ML20199J445 + (NOV from Insp of Adesa Auctions Indianapolis on 971022. Violation Noted:Near Sept 1997,licensee Transferred Source Containing Nominal 15 Mci (555 Mbq) of Po-210 & Transfer Was Not Made to Person Holding Specific License,Per 10CFR30)
- ML18102B614 + (NOV from Insp on 930517-970418.Violation Noted:Fire Watch Patrols Were Not Properly Implemented or Maintained for Inoperable Fire Barriers During Such Time as Capability of Three Types of 1 H ERFBSs Was in Question as Listed)
- ML20198P244 + (NOV from Insp on 951127-28 for Mullinex Packages,Inc. Violation Noted:Licensee Transferred Lfe Model Scl 77A Nuclear Gauge & Transfer Was Not Made to Person Holding Specific License)
- ML20217D638 + (NOV from Insp on 970513-0911.Violation Noted:Process Water Monitor Was Set to Alarm at 300,000 Counts Per Minute)
- ML20217C643 + (NOV from Insp on 970527-0707.Violation Noted:Operator Rounds Package Change Was Issued for Use W/O Superintendent, Operations or Designee Signature on Approval Page Attached to Master Reading Sheets)
- ML20210V524 + (NOV from Insp on 970602-20.Violation Noted:Licensee Made Change to Facility,W/O Prior Commission Approval,That Involved USQ)
- ML20211G006 + (NOV from Insp on 970616-0815.Violation Noted:Staff Changed Lineup of Safety Injection Sys Test Header from Primary Drain Tank to Refueling Water Storage Tank W/O Properly Changing Procedure Os 1005.05,Safety Injection Operation)
- ML20199A968 + (NOV from Insp on 970707-0825.Violations Noted:Operability Determinations Were Not Performed within 24 H of Discovery of Nonconforming Condition)
- ML17159A031 + (NOV from Insp on 970817-1020.Violation Noted:On 970910,SSES Procedures for Control of Sblc Maint Were Inadequate in That Procedures Did Not Control Activities Such That Sys Remained in Analyzed Configuration)
- ML20211J883 + (NOV from Insp on 970825-29.Violation noted:11 Emergency Plan SRDs Not Calibr in June 1997 & Had Not Been Calibr Since Dec 1996)
- ML20199A847 + (NOV from Insp on 970826-1006.Violations Noted:On 970911,line Assistant Shift Supervisor Failed to Appropriately Direct Activities of Reactor Operators,Monitor Indicators to Detect Abnormal Trend & Initiate Action to Correct Situation)