Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML080370081 + (Lltf Status of Recommendations February 2008)
- ML20051F455 + (Lmfbrs)
- ML18094B085 + (Lmp RIPB Guidance Document Draft H 2018-03-29)
- ML20265F300 + (Ln - Type a Transportation Casks Cask General Arrangements. Sheet 1 of 2)
- ML20265F309 + (Ln - Type a Transportation Casks Cask General Arrangements. Sheet 2 of 2)
- ML20265F353 + (Ln - Type a Transportation Casks Series 50 Cask General Arrangements. Sheet 1 of 1)
- L-2020-126, Ln-Service Inspection Program Owners Activity Report (OAR-1) + (Ln-Service Inspection Program Owners Activity Report (OAR-1))
- ET 19-0014, Lnserv1ce Inspection (ISI) Program Relief Request Number 14R-07, to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, D1v1s1on 1 + (Lnserv1ce Inspection (ISI) Program Relief Request Number 14R-07, to Utilize Code Case N-513-4, Evaluation Criteria for Temporary Acceptance of Flaws in Moderate Energy Class 2 or 3 Piping Section XI, D1v1s1on 1)
- ML23223A052 + (Lnservice Inspection Summary Report)
- ENS 46877 + (Lo-Lo Level in Steam Generator Results in Specified System Actuations)
- ENS 44645 + (Load Calulations for Edg Were Incorrect)
- ML20010H174 + (Load Combination Methodology Development.Load Combination Program Project II Final Report)
- ML19346A288 + (Load Combination Program Progress Report No. 6)
- ML19341C921 + (Load Combination Program,Project II Load Combination Methodology Development.Interim Report II)
- ML19336A695 + (Load Combination Program.Progress Report 5)
- 05000461/LER-2018-003-01, Load Driver Card Failure Resulting in High Pressure Core Spray Inoperability + (Load Driver Card Failure Resulting in High Pressure Core Spray Inoperability)
- 05000461/LER-2018-003, Load Driver Card Failure Resulting in High Pressure Core Spray Lnoperability + (Load Driver Card Failure Resulting in High Pressure Core Spray Lnoperability)
- ML19296B059 + (Load Forecasting Sys Specs, Forwarded in Response to Question 350.3)
- ML19250B999 + (Load Line Limit Analysis License Amend Submittal)
- ML18018B001 + (Load List Uninterruptible Power Supply 2VBB-UPS1C, 2VBB-UPS1D, and 2VBB-UPS1G)
- ML18018B000 + (Load List Uninterruptible Power Supply 2VBB-UPS1A)
- ML18018B002 + (Load List Uninterruptible Power Supply 2VBB-UPS1B)
- ML18018B003 + (Load List Uninterruptible Power Supply 2VBB-UPS1A, 2VBB-UPS1B, 2VBB-UPS1C, 2VBB-UPS1D, and 2VBB-UPS1G)
- ML19329F067 + (Load Mgt Survey for Large Commercial & Industrial Customers)
- ML14099A359 + (Load Sequence Schedule Load Train 1)
- ML14099A360 + (Load Sequence Schedule Load Train 1)
- ML14099A353 + (Load Sequence Schedule Load Train 2)
- ML13319A230 + (Load Sequence Schedule Load Train 2)
- ML20262K070 + (Load Sequence Schedule Load Train No 1. Sheet 2 of 2. Revision Date Illegible)
- ML20262K073 + (Load Sequence Schedule,Load Train No 2. Sheet 2 of 2. Revision Date Illegible)
- ML20262K077 + (Load Sequence Schedule,Load Train No 2. Sheet 1 of 2. Configuration Change)
- ML20260L522 + (Load Sequence Schedule,Load Train No. 2, as-built)
- 05000348/FIN-2009005-05 + (Load Sequencer Operability during EDG Surveillance Tests)
- 05000348/FIN-2009004-03 + (Load Sequencer Operability during EDG Surveillance Tests)
- 05000282/FIN-2008004-02 + (Load Sequencer Test Procedure Conflicts With Vendor Manual Information)
- Information Notice 1985-91, Load Sequencers for Emergency Diesel Generators + (Load Sequencers for Emergency Diesel Generators)
- ML20266H380 + (Load Shed Relay Outputs)
- ENS 40511 + (Load of Waste Arriving at a Waste-To-Energy Facility Set Off Radiation Monitors)
- ML20265D493 + (Loaded Source Holder.Sheet 1)
- ML20265D484 + (Loaded Source Holder.Sheet 1)
- ML090330363 + (Loading Bleu Fuel in Browns Ferry, Unit 1 - Slides/Handouts - TVA)
- ENS 48965 + (Loading Procedure for Isfsi Multi-Purpose Canisters Placed Them in an Unanalyzed Condition)
- ML20062J518 + (Loading Rate Effects on Strength and Fracture Toughness of Pipe Steels Used in Task 1 of the Ipirg Program)
- ML20125B653 + (Loads on Spherical Shells)
- ML18023A192 + (Loar Et Al. 1978- TN5056--Loar 1978)
- ML17266A519 + (Loca)
- ML12145A466 + (Loca-Hybrid-Final)
- ML20155B128 + (Loca/Eccs Analysis W/11% Steam Generator Tube Plugging)
- ML041000277 + (Loca/Lra/Rea Scaling Confirmation)
- ML19254F918 + (Loca/Safety Relief Valve Submerged Structure Loads Methodology)
- ML20003J313 + (Local 1010 Response to Util First Set of Interrogatories Re Dewatering & Ecology of Dunes Wetlands & Adjoining Areas. Certificate of Svc Encl.Related Correspondence)
- ML14079A346 + (Local 15, International Brotherhood of Electrical Worker, AFL-CIOs Response in Opposition to Exelons Motion to Strike)