Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20129J417 + (LAR 96-46 to License NPF-47,changing Tech Spec 3.8.1, A.C. Sources-Operating, Per GL 94-01)
- RBG-43243, LAR 96-46 to License NPF-47,changing Tech Spec 3.8.1, A.C. Sources-Operating, Per GL 94-01 + (LAR 96-46 to License NPF-47,changing Tech Spec 3.8.1, A.C. Sources-Operating, Per GL 94-01)
- ML20247R682 + (LAR 97-07 to License NPF-86,revising Refueling Water Storage Tank low-low Level Setpoint)
- ML20217A384 + (LAR 98-004 to Licenses NPF-87 & NPF-89,requesting Enforcement Discretion to Allow Units 1 & 2 to Perform Shutdown Surveillance Requirements 4.8.1.1.2f.4)a) & 4.8.1.1.2f.6)a) at Power)
- TXX-9810, LAR 98-005 to Licenses NPF-87 & NPF-89,incorporating Encl Change Into Plant,Units 1 & 2 Ts.Change Is Applicable to Unit 2 & Administrative for Unit 1.Affidavit,encl + (LAR 98-005 to Licenses NPF-87 & NPF-89,incorporating Encl Change Into Plant,Units 1 & 2 Ts.Change Is Applicable to Unit 2 & Administrative for Unit 1.Affidavit,encl)
- ML20195F519 + (LAR 98-007 to Licenses NPF-87 & NPF-89,revising Reactor Trip Setpoint for Cycle 5)
- ML20217E861 + (LAR 98-04 to License NPF-86,changing TS Surveillance Intervals to Accommodate 24 Month Fuel Cycle,Per GL 91-04)
- RBG-44562, LAR 98-07 to License NPF-47,deleting License Conditions Associated with Transamerica Delaval,Inc EDGs + (LAR 98-07 to License NPF-47,deleting License Conditions Associated with Transamerica Delaval,Inc EDGs)
- ML20217M367 + (LAR 98-07 to License NPF-86,modifying Tech Specs 3.7.6, Control Room Emergency Makeup Air & Filtration Subsystem)
- 05000458/LER-1997-004, LAR 98-08 to License NPF-47,changing Specific Gravity Acceptance Criteria for Div III Battery,Re TS 3.8.6, Battery Cell Parameters. Condition Leading to Change Was Described in LER 97-004 & Insp Rept 50-458/97-13 + (LAR 98-08 to License NPF-47,changing Specific Gravity Acceptance Criteria for Div III Battery,Re TS 3.8.6, Battery Cell Parameters. Condition Leading to Change Was Described in LER 97-004 & Insp Rept 50-458/97-13)
- ML20195F161 + (LAR 98-08 to Licenses NPF-87 & NPF-89,changing Suppl to LAR 96-06,original Description & Assessment Provided in Ltr Dtd 960802,revised to Reflect Addition of Configuration Risk Mgt Program)
- ML20155J167 + (LAR 98-17 to License NPF-86,revising TS SR 4.5.2b.1 to Remove Prescriptive Requirements of Using Venting Process as Sole Means to Verify That ECCS Piping Is Full of Water)
- ML20206G705 + (LAR 99-001 for Amends to Licenses NPF-87 & NPF-89,revising Surveillances Associated with Plant Battery & EDGs & Miscellaneous Editorial Corrections)
- ML20195B657 + (LAR 99-002 to Licenses NPF-87 & NPF-89,adding to COLR & Relocating Parameter Limits Allows for Available Operating & Analytical Margins to Be Used in Most Efficient Manner)
- ML20195B641 + (LAR 99-004 to Licenses NPF-87 & NPF-89 by Incorporating Attached Change Re Plant Battery Surveillance Into TS)
- TXX-9913, LAR 99-005 to Licenses NPF-87 & NPF-89,revising EDG Start to Emergency Start Instead of Normal Start Following Loss of Offsite Power + (LAR 99-005 to Licenses NPF-87 & NPF-89,revising EDG Start to Emergency Start Instead of Normal Start Following Loss of Offsite Power)
- ML20196G353 + (LAR 99-19 for License NPF-86,increasing AOT for Cracs from 30 Days to 60 Days on One Time Basis for Each Train to Facilitate on-line Implementation of Design Enhancements During Current Operating Cycle)
- ML25167A226 + (LAR Acceptance Review - Vogtle 1 and 2 - Adoption of Regulatory Guide 1.183 Revision 1)
- GNRO-2013/00067, LAR Application for Technical Specification Changes; Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel + (LAR Application for Technical Specification Changes; Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-535, Revise Shutdown Margin Definition to Address Advanced Fuel)
- ML13290A092 + (LAR Comments - License Amendment Request to Revise Current Licensing Basis of Pipe Break Criteria for High Energy Line Breaks)
- ML13290A071 + (LAR Comments - License Amendment Request to Revise Current Licensing Basis of Pipe Break Criteria for High Energy Line Breaks)
- ML14345A222 + (LAR FEMA E-mail)
- ML121290485 + (LAR File for Rod Indication/Attachment 1 Mrpi LAR)
- ML19143A384 + (LAR Implementation Extenstion - PUR1 - 20190521)
- 3F0716-01, LAR No. 318, Revision 0, Supplement 1, Permanently Defueled Emergency Plan, and Permanently Defueled Emergency Action Level Bases Manual, for the Independent Spent Fuel Storage Installation + (LAR No. 318, Revision 0, Supplement 1, Permanently Defueled Emergency Plan, and Permanently Defueled Emergency Action Level Bases Manual, for the Independent Spent Fuel Storage Installation)
- ML18270A146 + (LAR Physcial Security Plan Fish and Wildlife Service Resource List)
- ML18270A144 + (LAR Physcial Security Plan Fws Endangered Species List)
- EPID:L-2018-LLA-0042 + (LAR Physcial Security Plan Fws Endangered Species List)
- ML24065A026 + (LAR Pre-Application Meeting TS 3.9.8 (Decay Time) and FHA Dose Analysis Meteorological Monitoring and Dispersion Modeling Topics)
- ML20045D583 + (LAR Proposing Changes to Seabrook Station Tech Specs to Reduce Frequency of Surveillances Which Are Required to Verify Integrity of CST Enclosure)
- NRC 2006-0061, LAR Public Version, License Amendment Request 248; Technical Specification 5.5.8, Steam Generator Program + (LAR Public Version, License Amendment Request 248; Technical Specification 5.5.8, Steam Generator Program)
- ML19127A245 + (LAR Receipt_04262019_ Re_ Accession No ML19079A165)
- ML20056F764 + (LAR Requesting Exercise of Enforcement Discretion from Requirement to Perform Channel Check on Narrow Range RWST low-low Level Transmitters)
- ML082140002 + (LAR Technical Specification Change to Allow Westinghouse 14x14 Vantage+ Fuel - Change to Acceptance Review Supplemental Request)
- ML14139A100 + (LAR Ultimate Heat Sink)
- ML090620116 + (LAR for Adoption of TSTF-511, Rev. 0)
- ML17132A177 + (LAR for Control Room Cooling at Byron and Braidwood Stations)
- ML062210005 + (LAR for EDG Extension and Completion Time)
- ML20206P127 + (LAR for License DPR-22,revising TS pressure-temp Curves Contained in Figures 3.6.1,3.6.2,3.6.3 & 3.6.4,deleting Completed RPV Sample SRs & Requirement to Withdraw Specimen at Next Refueling Outage & Removing Redundant SR for SLCS)
- ML20056H389 + (LAR for License DPR-53 Revising Heatup & Cooldown Curves & LTOP Controls for Unit 1)
- ML20056H042 + (LAR for License NPF-3 Revising TS 3/4.6.4.3 Re Containment Hydrogen Dilution Sys & Associated Bases)
- PY-CEI-NRR-1649, LAR for License NPF-58,revising PORC Composition & Selected Mgt Titles in TS 6.5.1 + (LAR for License NPF-58,revising PORC Composition & Selected Mgt Titles in TS 6.5.1)
- ML111960490 + (LAR for Primary Coolant System Pressure-Temperature Limits - ME5806 - Request for Additional Information)
- ML100630911 + (LAR for a Change to License Section 2.E)
- ML13154A149 + (LAR on Keowee Hydro Unit Frequency, MF1741, MF1742, and MF1743, Acceptance Review)
- GO2-16-104, LAR to Change EAL Scheme + (LAR to Change EAL Scheme)
- ML20087J421 + (LAR to License DPR-22,revising Max Individual MSIV Leak Rate Acceptance Criteria of 11.5 Scfh to Overall Criteria That Encompasses Four Main Steam Lines Into One Limit of 46 Scfh)
- ML20069J101 + (LAR to License DPR-22,revising TS Section 3.7/4.7, SGTS Re SR to Operate SGTS Monthly as Well as Revising Performance Requirements for SGTS Filters & Process Stream Electric Heaters)
- ML20086D798 + (LAR to License DPR-22,revising TS to Extend Surveillance Test Intervals & Allowable out-of-svc Times for Selected Instrumentation)
- ML20078B356 + (LAR to Licenses DPR-42 & DPR-60,changing Submittal Frequency of Radioactive Effluent Release Rept from Semiannual to Annual & Revising Submittal Schedule to Require Submittal by May 1st of Each Yr)
- ML20077Q659 + (LAR to Licenses DPR-42 & DPR-60,revising TS 4.4.D.1 to Change Interval for Performance of RHR Sys Leakage Test from Once Every 12 Months to Perform Test During Each Refueling Shutdown)
- ML20056E106 + (LAR to Provide Clarification of Sampling & Analysis Requirements,Update Liquid Effluent Sampling & Analysis Requirements & to Correct Typographical Errors in TS Section for License DPR-22)