LAR for Adoption of TSTF-511, Rev. 0
ML090620116
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/03/2009
From: Siva Lingam
Plant Licensing Branch II
To: Frehafer K
Florida Power & Light Co
Lingam, Siva NRR/DORL 415-1564
References
TAC ME0653, TAC ME0654
Download: ML090620116 (2)


Text

From:

Siva Lingam Sent:

Tuesday, March 03, 2009 9:16 AM To:

'Frehafer, Ken' Cc:

Tom Boyce (NRR); Jason Paige; Robert Elliott; Abraham Marrero

Subject:

St. Lucie Units 1 and 2 License Amendment Request for Adoption of TSTF-511, Rev. 0 (TAC Nos. ME0653 and ME0654)

By letter dated February 12, 2009 (ADAMS Accession No. ML090500397), Florida Power and Light Company (FPL) submitted a license amendment request for St. Lucie Units 1 and 2. The proposed amendment would eliminate working hour restrictions from Technical Specification (TS) 5.2.2 per Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-511, Revision 0, "Eliminate Working Hour Restrictions from TS 5.2.2 to Support Compliance with 10 CFR Part 26." The purpose of this letter is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staff=s acceptance review of this amendment. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

Consistent with Section 50.90 of Title 10 of the Code of Federal Regulations (10 CFR), an amendment to the license (including the technical specifications) must fully describe the changes requested, and following as far as applicable, the form prescribed for original applications. Section 50.34 of 10 CFR addresses the content of technical information required.

This section stipulates that the submittal address the design and operating characteristics, unusual or novel design features, and principal safety considerations.

The NRC staff has reviewed your application and concluded that it does provide technical information in sufficient detail to enable the staff to proceed with its detailed technical review and make an independent assessment regarding the acceptability of the proposed amendment in terms of regulatory requirements and the protection of public health and safety and the environment. If additional information is needed for the staff to complete its technical review, you will be advised by separate correspondence.

If you have any questions, please contact me at 301-415-1564.

Siva P. Lingam U.S. Nuclear Regulatory Commission Project Manager (NRR/DORL/LPL2-2)

Saint Lucie and Turkey Point Nuclear Stations Location: O8-D5; Mail Stop: O8-G9a Telephone: 301-415-1564; Fax: 301-415-1222 E-mail address: siva.lingam@nrc.gov E-mail Properties Mail Envelope Properties ()

Subject:

St. Lucie Units 1 and 2 License Amendment Request for Adoption of TSTF-511, Rev. 0 (TAC Nos. ME0653 and ME0654)

Sent Date: 3/3/2009 9:02:05 AM Received Date: 3/3/2009 9:15:00 AM From: Siva Lingam Created By: Siva.Lingam@nrc.gov Recipients:

Ken.Frehafer@fpl.com ('Frehafer, Ken')

Tracking Status: None Tom.Boyce@nrc.gov (Tom Boyce (NRR))

Tracking Status: None Jason.Paige@nrc.gov (Jason Paige)

Tracking Status: None Robert.Elliott@nrc.gov (Robert Elliott)

Tracking Status: None Abraham.Marrero@nrc.gov (Abraham Marrero)

Tracking Status: None Post Office:

Files Size Date & Time MESSAGE 11550 3/3/2009 Options Expiration Date:

Priority: olImportanceNormal ReplyRequested: False Return Notification: False Sensitivity: olNormal Recipients received: