Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML051960242 + (Improved Technical Specifications, Volume 3, Revision 0, ITS Chapter 1.0, Use & Application)
- ML051990476 + (Improved Technical Specifications, Volume 12, Revision 0, ITS Section 3.7, Plant Systems)
- ML051990515 + (Improved Technical Specifications, Volume 17, Revision 0, ITS Chapter 5.0, Administrative Controls)
- ML051990514 + (Improved Technical Specifications, Volume 16, Revision 0, ITS Chaper 4.0, Design Features)
- ML051960253 + (Improved Technical Specifications, Volume 5, Revision 0, ITS Section 3.0, LCO Applicability & SR Applicability)
- ML051990483 + (Improved Technical Specifications, Volume 8, Book 1, Revision 0, ITS Section 3.3, Instrumentation)
- ML051960212 + (Improved Technical Specifications, Volume 1, Revision 0, Application of Selection Criteria to the Monticello Nuclear Generating Plant)
- ML051990503 + (Improved Technical Specifications, Volume 10, Revision 0, ITS Section 3.5, Eccs)
- ML051990501 + (Improved Technical Specifications, Volume 9, Revision 0, ITS Section 3.4, Reactor Coolant System)
- ML051960487 + (Improved Technical Specifications, Volume 6, Revision 0, ITS Section 3.1, Reactivity Control Systems)
- ML051990459 + (Improved Technical Specifications, Volume 13, Revision 0, ITS Section 3.8, Electrical Power Systems)
- ML18344A285 + (Improved Technical Specifications, Volume 18, Section 3.9)
- ML18344A286 + (Improved Technical Specifications, Volume 20, Chapter 5.0)
- ML18344A249 + (Improved Technical Specifications, Volume 3, Chapter 1.0)
- ML18344A250 + (Improved Technical Specifications, Volume 4, Chapter 2.0)
- ML18344A251 + (Improved Technical Specifications, Volume 5, Chapter 3.0)
- ML051960247 + (Improved Technical Specifications, Volume 4, Revision 0, ITS Chapter 2,0, Safety Limits)
- ML051990510 + (Improved Technical Specifications, Volume 11, Revision 0, ITS Section 3.6, Containment Systems)
- ML051960215 + (Improved Technical Specifications, Volume 2, Revision 0, Generic Determination of NSHC & Environmental Assess)
- ML061230550 + (Improved Technical Specifications, Volumes 1 - 5, Rev. 1)
- ML19317H194 + (Improved Ultrasonic NDT of Pressure Vessels)
- ML19269C828 + (Improved Ultrasonic Nondestructive Testing of Pressure Vessels, Oct 1977-Sept 1978)
- ML20049H986 + (Improved Ultrasonic Nondestructive Testing of Pressure Vessels.Yearly Progress Report,August 1,1974 - July 31,1975)
- ML20041E576 + (Improved Ultrasonic Nondestructive Testing of Pressure Vessels.Annual Progress Report,August 1,1975 - July 31,1976)
- ML19254D093 + (Improved Ultrasonic Nondestructive Testing of Pressure Vessels)
- ML20028C047 + (Improvement Program)
- ML19344D371 + (Improvement in Calculation of Turbulent Friction in Smooth Concentric Annuli)
- ML20153G538 + (Improvement of Safety of Piping Sys Using Nonlinear Analysis Methods Sbir Phase I Final Rept Oct 1986 - Jul 1987)
- ML20035A535 + (Improvements Needed in Financial & Administrative Accountability for Ofc of Nuclear Regulatory Research Funded Work at Dept of Energy Labs)
- ML20033C599 + (Improvements for Lers)
- ML20097H429 + (Improvements in Motor Operated Gate Valve Design and Prediction Models for Nuclear Power Plant Systems.Sbir Phase I Final Report.September 1990-April 1991)
- ML17256A975 + (Improvements in Reactor Operator & Senior Reactor Operator Training & Requalification Programs for Re Ginna Nuclear Power Plant, Final Technical Evaluation Rept.Rept Addresses NUREG-0737,Items I.A.2.1 & II.B.4)
- ML20028C681 + (Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Pilgrim Nuclear Power Station, Technical Evaluation Rept)
- ML20069N780 + (Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4,Calvert Cliffs,Units 1 & 2, Technical Evaluation Rept)
- ML17341B466 + (Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Turkey Point,Units 3 & 4, Technical Evaluation Rept)
- ML13317A377 + (Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for San Onofre Nuclear Generating Station,Unit 1, Technical Evaluation Rept)
- ML18139C126 + (Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Surry Power Station, Technical Evaluation Rept)
- ML20027A904 + (Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Big Rock Point Nuclear Plant, Technical Evaluation Rept)
- ML20028A734 + (Improvements in Training & Requalification Programs as Required by TMI Action Items 1.A.2.1 & II.B.4 for Point Beach Nuclear Plant,Units 1 & 2, Technical Evaluation Rept)
- ML20027A906 + (Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Oyster Creek Nuclear Generating Station, Technical Evaluation Rept)
- ML20027A894 + (Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Ja Fitzpatrick Nuclear Power Plant, Technical Evaluation Rept)
- ML20027A902 + (Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Beaver Valley Power Station, Technical Evaluation Rept)
- ML20028E427 + (Improvements in Training & Requalification Programs as Required by TMI Action Items,I.A.2.1 & II.B.4, Technical Evaluation Rept)
- ML20069D076 + (Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Final Technical Evaluation Rept)
- ML20071L380 + (Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Peach Bottom Atomic Power Station, Technical Evaluation Rept)
- ML20071L384 + (Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4 for Davis-Besse Nuclear Power Station, Technical Evaluation Rept)
- ML17256B068 + (Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4)
- ML17256B067 + (Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4)
- ML20027A806 + (Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Technical Evaluation Rept)
- ML20064L528 + (Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Technical Evaluation Rept)
- ML20064L492 + (Improvements in Training & Requalification Programs as Required by TMI Action Items I.A.2.1 & II.B.4, Technical Evaluation Rept)