Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20021A384 + (Fasken Oil and Ranch, Ltd and Permian Basin Land and Royalty Owners Motion to Reopen the Record for Purposes of Considering and Admitting an Amended Contention)
- ML20056E908 + (Fasken Oil and Ranch, Ltd.S and Permian Basin Land and Royalty Owners Reply to Interim Storage Partners, LLCs Answer Opposing Motion for Leave to Reopen the Record and Associated Motion for Leave to Amend Contention Four)
- ML23256A363 + (Fasken Response to 28j September 7, 2023)
- ML23256A366 + (Fasken Standing and Statutory Addendum)
- ML25245A245 + (Fasken V NRC (23-60377) - Federal Respondents Letter Brief 9.2.25)
- ML25293A448 + (Fasken V NRC (23-60377) - Order 10.20.2025)
- ML24089A009 + (Fasken V NRC (5th Cir 23-60377) - Order 3.27.2024)
- ML20016A453 + (Fasken and Pblro Access to SUNSI Information Request)
- ML19154A455 + (Fasken and Pblro Notice of Appeal and Petition for Review of LBP-19-4)
- ML18332A530 + (Fasken and Pblro Reply to ISPs Opposition to Hearing Request and Petition to Intervene)
- ML18344A683 + (Fasken and Pblro Reply to Staff Supplemental Response and Opposition to Motion to Dismiss)
- ML18334A360 + (Fasken and Pblro Response to ISPs and Staffs Opposition to Faskens and Pblros Motion to Dismiss as Referred to the ASLBP for Consideration Under 10 CFR 2.309)
- ML19260J386 + (Fasken and Pblros Brief on Appeal of LBP-19-07)
- ML19260J388 + (Fasken and Pblros Certificate of Service of Notice of Appeal and Brief on Appeal of LBP-19-07)
- ML20273A000 + (Fasken and Pblros Combined Notice of Appeal and Petition for Review of Atomic Safety Licensing Boards Denial of Motion for Leave to File Amended Contention and Motion to Reopen the Record)
- ML18344A681 + (Fasken and Pblros Motion for Permission to File Supplemental Declaration of Tommy E. Taylor)
- ML19260J387 + (Fasken and Pblros Notice of Appeal of LBP-19-07)
- ML18351A335 + (Fasken and Pblros Opposition to Interim Storage Partners LLCs Motion to Strike)
- ML19255G616 + (Fasken and Pblros Withdrawal of Their Motion for Leave to Reopen and Incorporate Contention Filed August 1, 2019)
- ML18334A361 + (Faskens and Pblros Reply to Staffs Response to Hearing Request and Petition to Intervene)
- 05000373/FIN-2010006-05 + (Fast Bus Transfer Analysis)
- ML21179A340 + (Fast Code Assessment for TRISO Fuels Summary Memo)
- ML19296C135 + (Fast Loop Facility Nitrogen Operation Test, Internal Technical Rept)
- ML20199L747 + (Fast Neutron Fluence Evaluations for Fort Calhoun Unit 1 Reactor Pressure Vessel)
- ML20041E579 + (Fast Reactor Safety Research Program.Quarterly Report, October-December 1976)
- ML20083K225 + (Fast Scram Control Rod Drive Qualification Program)
- 05000275/LER-2002-001, Fasteners Failed Due to Stress Corrosion Cracking + (Fasteners Failed Due to Stress Corrosion Cracking)
- ENS 45398 + (Fasteners on Spent Fuel Storage Devices Did Not Meet Standards)
- ML20105D012 + (Fastgrass: a Mechanistic Model for the Prediction of Xe, I, CS, TE, Ba, and SR Release from Nuclear Fuel Under Normal and SEVERE-ACCIDENT Conditions.Users Guide for Mainframe, Workstation, and Personal Computer Applications)
- ENS 45453 + (Fatality and Transport of a Potentially Contaminated Individual Offiste)
- ENS 44103 + (Fatality of Licensee Employee)
- ENS 45869 + (Fatality of Licensee Employee)
- ML20093K288 + (Fatigue & Fracture of TMI-1 Reactor Coolant Pump Shaft Failure)
- ML16216A120 + (Fatigue Action Plan)
- ML080950235 + (Fatigue Analysis of Nuclear Power Plant Components)
- RIS 2008-30, Fatigue Analysis of Nuclear Power Plant Components + (Fatigue Analysis of Nuclear Power Plant Components)
- RIS 2008-10, 2008/04/11-Vermont Yankee July 2008 Evidentiary Hearing - Intervenor Exhibit NEC-JH 23, Nrc, NRC Regulatory Issue Summary 2008-10 Fatigue Analysis of Nuclear Power Plan Components (April 11, 2008) + (Fatigue Analysis of Nuclear Power Plant Components)
- RIS 2008-10, Fatigue Analysis of Nuclear Power Plant Components + (Fatigue Analysis of Nuclear Power Plant Components)
- ML13316A524 + (Fatigue Crack Growth Evaluation for San Onofre Unit 1 Main Steam Line Pipe)
- ML20205H623 + (Fatigue Crack Growth Rates in Pressure Vessel and Piping Steels in LWR Environments.Final Report)
- ML20106G742 + (Fatigue Crack Growth Rates of LOW-CARBON and Stainless Piping Steels in PWR Environment)
- ML20072E191 + (Fatigue Crack Growth Rates of a 508-2 Steel in Pressurized, High Temperature Water)
- ML19210B940 + (Fatigue Crack Growth of A508 Steel in High-Temp,Pressurized Reactor-Grade Water)
- ML20077M518 + (Fatigue Evaluation Power Uprate Operating Conditions, Rev 1)
- ML20042C234 + (Fatigue Evaluation for Fist Steam Generator Vessel, Technical Rept)
- ML19261A592 + (Fatigue Evaluation of Existing Feedwater Nozzle/Sparger Design. Concludes That Postponement of in-reactor Liquid Penetrant Exam of Nozzles Beyond Spring 1979 Refueling Outage Is Warranted)
- ML20149G040 + (Fatigue Evaluation of Peach Bottom II & III Reactor Vessels)
- ML19276F836 + (Fatigue Growth in Piping & Reactor Pressure Vessel Steels in Simulated BWR Water Environ)
- ML20154E172 + (Fatigue Life Characterization of Smooth and Notched Piping Steel Specimens in 288 Degrees C Air Environments)
- GO2-10-031, Fatigue Management Annual Performance Data Report September 21 to December 31, 2009 + (Fatigue Management Annual Performance Data Report September 21 to December 31, 2009)
- RIS 2011-08, Fatigue Management During Hurricane Conditions 10 CFR Part 26, Subpart I + (Fatigue Management During Hurricane Conditions 10 CFR Part 26, Subpart I)